S02 - ATT 6 - 581-22-700 - 100 Drawings Part-4 of 24.pdf
PDF 16 MB Posted
- Solicitation number
- 36C77626R0025
About this file
This document set comprises architectural construction drawings and phasing plans for a renovation project at the VA Huntington Medical Center, specifically the EHRM Infrastructure Upgrades project (Project Number 581-22-700). The drawings are prepared by SPEES Design Build and cover Building 01W (Levels 00G, 01, 02, and 03) and Building 02 (Level 00B), with a focus on TR Tower 2, a new four-story vertical construction within the existing facility footprint.
The project involves demolition and renovation work organized into multiple phases with specific coordination requirements. TR Tower 2 consists of four levels: Level 00G contains a 115 SF privacy space and 164 SF examination room; Level 01 features a 160 SF examination room; Level 02 contains a 161 SF examination room; and Level 03 includes a 164 SF examination room with associated support spaces. The exterior design features brick veneer with aluminum T-furring over rigid insulation and metal studs, with horizontal slip joints and limestone parapet elements. Interior coordination includes ICRA (Infection Control Risk Assessment) phasing across Classes II through IV, with the contractor required to complete TR Tower 2 data drops in phases as directed by the Contracting Officer Representative (COR). Building sections, wall details, roof plans, and exterior elevations are provided showing fire-rated construction (1-hour and 2-hour rated walls), expansion joint covers, thru-wall scuppers, and coordination with existing building infrastructure. The fully sprinklered facility includes specific provisions for temporary exhaust location and window sealing during construction.
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
X
W
WAP
360°
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
SMOKE RATED WALL
NEW LIGHTS (SEE ELECTRICAL DETAILS)
KEY AREA SHOWN
PROJECT
NORTH
FOOTPRINT OF NEW
CONSTRUCTION.
PREPARE AREA FOR
NEW CONSTRUCTION.
FOOTPRINT OF NEW
CONSTRUCTION.
TEMPORARY LOCATION OF EXHAUST.
MOVE INSIDE NEW TR ONCE FEASIBLE.
SEAL WINDOW DURING
CONSTRUCTION
SEAL WINDOW DURING
CONSTRUCTION
T2-B
T2-SB
T2-A
T2-1
T2-2 11
3/
8"
/8
7'
LINE OF NEW
CONSTRUCTION
LINE OF NEW
CONSTRUCTION.
T2-B
T2-SB
T2-A
T2-1
T2-2
SEE GENERAL NOTES
1, 2 AND 6
NEW
FLOORING
E X
IS
T
IN
G
F
LO
O R
IN
G
T2-S1
T2-S2
T2-SA
T2-B
GC128g
115 SF
PRIVACY
GC134
112 SF
CORRIDOR
1280 SF
STAFF
RESTROOM
GC137
157 SF
STAFF
RESTROOM
GC136
187 SF
164 SF
TR TOWER 2
T2-00G
E1C
01WA-103c
01WA-103c
01WA-103b
01WA-103b
01WA-103b
E1C
DATA RACK
ELECT PANEL
E1C
EXPANSION
JOINT
EXPANSION
JOINT
T2-SB
T2-A
T2-1
T2-2
IN-03.01-4
T2-00G
1/
2"
7/ 8"
1/
2"6"
/4
12' - 2 3/8"
6"6"
1'
1"
8 8
02b
3' - 9 1/2"
2'
4"
04a 04a
6"
IN-01.31
EXPOSED
T2-S1
T2-S2
T2-SA
T2-B
GC128g
115 SF
PRIVACY
GC134
112 SF
CORRIDOR
1280 SF
STAFF
RESTROOM
GC137
157 SF
STAFF
RESTROOM
GC136
187 SF
01WA-103c
01WA-103c
T2-SB
T2-A
T2-1
T2-2
164 SF
TR TOWER 2
T2-00G
SEE GENERAL NOTES
1, 2 AND 6
SEE GENERAL NOTES
1, 2 AND 6
AC UNIT
1' - 7"
2'
2"
6"
1' - 7"
1' - 9"
2'
2"
2'
2" 1' - 9"
STAFF
RESTROOM
GC136
187 SF
STAFF
RESTROOM
GC137
157 SF
PRIVACY
GC134
112 SF
GC128g
115 SF
( + ) PRESSURE
CONSTRUCTION ZONE, (--) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MAT
HEPA EQUIPPED EXHAUST
TR TOWER 2
01W
0223R 01S
01A
NFPA
TABLE 7.2.1.1 FIRE RESISTANCE RATING FOR TYPE I - 332 (HR)
COLUMNS
SUPPORTING MORE THAN ONE FLOOR 3 HOUR
SUPPORTING ONE FLOOR / ROOF ONLY 2 HOUR
BEAMS
SUPPORTING ONE FLOOR / ROOF ONLY 2 HOUR
FLOOR/CEILING ASSEMBLIES 2 HOUR
ROOF/CEILING ASSEMBLIES 1 1/2 HOUR
INTERIOR/EXTERIOR NONBEARING WALLS 0 HOUR
FIRE RATED REQUIREMENTS
FIRE RATING SCHEDULE
UL
REFERENCE
COLUMNS SUPPORTING ONE FLOOR
HOURLY
RATINGTYPE ELEMENT
I 2 HR UL X854
I COLUMNS SUPPORTING MORE
THAN ONE FLOOR
3 HR UL X854
COLUMNS SUPPORTING ROOFI 2 HR UL X854
FLOOR DECKSI 2 HR UL D779
FLOOR SUPPORTSI 2 HR UL P732
ROOF DECKSI 1 1/2 HR UL P732
ROOF SUPPORTSI 2 HR UL N732
FIRE RATED SCHEDULE
STAFF
RESTROOM
GC136
187 SF
STAFF
RESTROOM
GC137
157 SF
PRIVACY
GC134
112 SF
GC128g
115 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0 /2
:0
:3 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /B
L D
G
W
T R
T O
W E
R
.r v t
01WA-100G
BUILDING 01W - LEVEL 00G - DEMO, FLOOR
PLANS & RCPS
01W
MA SR/RB
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1. ALL PRODUCTS AND FINISHES SHALL MATCH EXISTING OR
ADJACENT EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS, FLOORS AND CEILINGS
WHERE MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS
ARE DEMOLISHED.
3. PROTECT FINISHES IN ROOMS ADJACENT TO THE AREA OF
WORK AND PARTS THAT ARE NOT INCLUDED IN THE
SCOPE.
4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP
UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT
PLYWOOD. SEE DETAIL 5/AE401.
5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND
DETAILS.
6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED
AND REMOVED.
7. REFER TO SHEET A-602 FOR DOOR SCHEDULE.
1/4" = 1'-0"
LEVEL 00G - TR TOWER 2 - DEMO FLOOR PLAN
PROJECT
NORTH
1/4" = 1'-0"
LEVEL 00G - TR TOWER 2 - DEMO RCP
PROJECT
NORTH
1/4" = 1'-0"
RM T2-00G - FLOOR PLAN
1/4" = 1'-0"
RM T2-00G - RCP
PROJECT
NORTH
PROJECT
NORTH
9 INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER
TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED
SPACE.
10 INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,
SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYPICAL.
11 PLACE TACKY MATS AT ENTRANCE AND EXIT OF
CONSTRUCTION AREA, MINIMUM SIZE 24"x36", TYPICAL.
1 DEMOLISH EXISTING WALL. PATCH EXPOSED WALL
INTERSECTIONS TO MATCH EXISTING.
2 DEMOLISH PORTION OF EXISTING WALL. PREPARE FOR NEW
DOOR/FRAME.
3 INSTALL NEW DOOR/FRAME.
4 CONSTRUCT NEW WALL.
5 CONSTRUCT NEW FLOOR.
6 APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE
VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.
7 INSTALL NEW RESILIENT RUBBER BASE AT ROOM
PERIMETER WITH SEALANT AT THE BOTTOM.
8 INSTALL FRT PLYWOOD OVER WALLS AS NEEDED PER
DETAIL 3/AE401, TYPICAL.
GENERAL NOTES
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
LEGEND
ICRA KEYNOTES
ICRA CLASS III LEGEND
Revisions: Date:
09/03/20259/3/2025 113 OF 693
TR
ICRA PHASING LINE
ICRA CLASS III
ICRA CLASS IV
ICRA CLASS II
FIRE EXTINGUISHER CABINETFEC
FIRE EXTINGUISHERFE
BUILDING BOUNDARY LINE
2 HR FIRE RATED WALL
1 HR FIRE RATED WALL
SMOKE RATED WALL
KEY AREA SHOWN
PROJECT
NORTH
X Y Z
A16 A15 A14
A7 A6
A5 A4
A3
A8
A11 A10
A9
A2 A1
T2-A
T2-1 T2-B
T2-2
1528 SF
KITCHEN
1D102
195 SF
NOURISH
1D101
48 SF
ELEV
F8
29 SF
1D102A
275 SF
EXAM
1C131
203 SF
EXAM
1C132
205 SF
EXAM
1C135
TLT
SHWR
1C135A
205 SF
EXAM
1C136
168 SF
EXAM
1C
16 SF
TLT
1C138A
27 SF
TLT
1C140A
170 SF
EXAM
1C140
209 SF
EXAM
1C143
45 SF
TLT
SHWR
1C143A
210 SF
EXAM
1C
193 SF
EXAM
1C
242 SF
EXAM
1C149
251 SF
EXAM
1C150
184 SF
EXAM
1C152
115 SF
EXAM
1C153
115 SF
EXAM
1C156
264 SF
EXAM
1C159
253 SF
MMS ADMIN
1C160
237 SF
BRK
NURSE RM
1C160A
139 SF
LPN
1C160B
81 SF
MALE TOILET
1C161B
80 SF
FEMALE TOILET
1C161A
130 SF
OFFICE
1C162
78 SF
MALE LOCKER
1C163
29 SF
TOILET
32 SF
TOILET
FEMALE
LOCKER
1C164
189 SF
VISN HR
1C165
104 SF
PATIENT REP
1C166A179 SF
PATIENT REP
1C166
144 SF
PATIENT REP
1C167
88 SF
MECH
1C168
518 SF
LOBBY
1C100216 SF
SWITCHBOARD
1C101
180 SF
CHAPLAIN
OFFICE
1C102226 SF
CHAPLAIN SECY
1C104
152 SF
CHAPLAIN
1C104A
12 SF
COMM
1C146
56 SF
ELEC
1C144
117 SF
IRM
1C142
123 SF
NURSES
1C141
70 SF
SOILED
1C154
78 SF
CLEAN
1C155
30 SF
TOIL
1C139C
75 SF
MECH
1C139D
47 SF
EQUIP
1C161C
KIT
1C139A
110 SF
MED ROOM
1C139B
8 SF
MECH
45 SF
1C123
37 SF
HAC
1C134
235 SF
EXAM
1C
1453 SF
STAIR
25 SF
1C151A
182 SF
EXAM
1C151
26 SF
1C153A
24 SF
1C158A
263 SF
EXAM
1C158
294 SF
RECEPTIONIST
1C139
289 SF
CLINIC
MANAGER
655 SF
WAITING
1C161
205 SF
STAIR
178 SF
TIME KEEPER
1C107
H.A.C.
1C107A
TLT
100 SF
NURSE RECRUIT
1C108 59 SF
ELEC
1C109
228 SF
PROSTHETICS
1C110
125 SF
PROSTHETICS
1C111
195 SF
STAIR
SHOWER
1C116A
117 SF
CLINICAL
PHARMACY
1C112
168 SF
PHARMACY
RESIDENT
1C113
141 SF
DIETETICS
1C114
FEMALE TOILET
1C116
FEMALE
LOCKER
1C115
131 SF
EEO
1C117
111 SF
EEO
1C118
181 SF
EEO
1C119
117 SF
EEO
1C120
20 SF
1C120A
61 SF
ELEC
1C121
84 SF
IRM
1C123
197 SF
STAIR
104 SF
BIOMED
1C124
148 SF
CLINIC
1C125
114 SF
NUT
1C127
107 SF
NUT?
1C127A
151 SF
C&P CHIEF
1C126A
260 SF
C & P
1C126
C&P NURSE
1C128
CLINICAL
PHARMACIST
1C129
CLINICAL
PHARMACIST
1C130
HAC
1C114A
882 SF
CORRIDOR
C1-26
180 SF
STAIR
205 SF
LOUNGE
1D107
178 SF
FOREMAN
1D104
151 SF
COOLER
C1-30
238 SF
CANNED GOODS
1D103
109 SF
WORK
1D110
FEMALE TOILET
1D108
225 SF
TRAINING
1D111
166 SF
SUPERV.
2D111A
MEN TOILET
1D109
155 SF
STORAGE
1D105
90 SF
STOR
1D106
469 SF
FOOD SERVICE
LINE
717 SF
DISHWASHING
1D100A
22 SF
TEL
1C122
2034 SF
CORRIDOR
C1-19
98 SF
ELEV
P9
77 SF
ELEV
W -1
77 SF
ELEV
W -2
CORR.
1087 SF
BLDG. 2
DIETETICS
C1-31
E-6
S-3
E-5
S-4
BUILDING 01W
PHASE 1:
CONTRACTOR TO COMPLETE THE WORK OF THIS TR AND
ASSOCIATED DATA DROPS. COMPLETE ONE SECTION AT
A TIME AS DIRECTED TO COR.
BUILDING 01W
SECTION 1A:
CONTRACTOR TO COORDINATE WITH VA FOR
ROOM CLOSURES AND AVAILABILITY TO COMPLETE
DATA WIRING IN THIS AREA.
BUILDING 01W
SECTION 1B:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BUILDING 01
SECTION 1C:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BUILDING 02
SECTION 1D:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BLDG. 01
BLDG. 01W
BLDG. 02
TR TOWER 2
T2-01
160 SF
BLDG. 01S
BLDG. 01A
191 SF
EXAM
1C131
NEW SEMI-RECESSED FEC, TO MATCH
OR EXCEED EXISTING EXTINGUISHER IN
ABC RATING AND SIZE. SEE DET 4/A-604.
FEC
1W-1
1W-2
1W-3
1W-4
1W-5
1W-6
SPACE FOR NEW DATA CENTER
TR TOWER 2
01W
0223R 01S
01A 01
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:5 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /B
L D
G
L E
V E
L
.r v t 01WAS101
BUILDING 01W - LEVEL 01 - PHASING PLAN
01W
MA RB
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
KEY PLAN
LEGEND
PROJECT
NORTH
1/16" = 1'-0"
BUILDING 01W - LEVEL 01 - PHASING PLAN
09/03/20259/3/2025 114 OF 693
360°
X
W
360°
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
SMOKE RATED WALL
NEW LIGHTS (SEE ELECTRICAL DETAILS)
KEY AREA SHOWN
PROJECT
NORTH
T2-B
FOOTPRINT OF NEW
CONSTRUCTION.
PREPARE AREA FOR
NEW CONSTRUCTION.
FOOTPRINT OF NEW
CONSTRUCTION.
SEAL WINDOW DURING
CONSTRUCTION
SEAL WINDOW DURING
CONSTRUCTION
TEMPORARY LOCATION OF EXHAUST.
MOVE INSIDE NEW TR ONCE FEASIBLE.
T2-SB
T2-A
T2-1
T2-2
11' - 8 1/2"
ANTE
ROOM
T2-B
LINE OF NEW
CONSTRUCTION
LINE OF NEW
CONSTRUCTION.
T2-SB
T2-A
T2-1
T2-2
T2-S1
T2-S2
T2-SA
T2-B
160 SF
TR TOWER 2
T2-01
EXAM
1C132
203 SF
CORRIDOR
C1-26
882 SF
CLINICAL
PHARMACIST
1C130
96 SF
CLINICAL
PHARMACIST
1C129
105 SF
01WA-103c
01WA-103c
01WA-103b
01WA-103b
01WA-103b
10' - 9 1/2" CLEARANCE
5 7/8"
5 1/2"
7' - 9"
3' - 6"
DATA RACK
ELECT PANEL
E1C
E1C
E1C
T2-01
EXISTING
FLOORING
N E W
O R
IN
G
T2-SB
FACE OF STUDS
T2-A
T2-1
T2-2
12' - 2 3/8"
6"
1/
2"
7/ 8"
1/
2"
6"
/4
4 1/4"WALL TO WALL
EXPANSION JOINT
COVER
WALL TO WALL
EXPANSION JOINT
COVER
C
LE
A R
A N
C E
IN-03.01-7
AE501
02b
IN-01.02
04a
T2-S1
T2-S2
T2-SA
T2-B
160 SF
TR TOWER 2
T2-01
EXAM
1C132
203 SF
CORRIDOR
C1-26
882 SF
CLINICAL
PHARMACIST
1C130
96 SF
CLINICAL
PHARMACIST
1C129
105 SF
01WA-103c
01WA-103c
EXPOSED
T2-SB
T2-A
T2-1
T2-2
AC UNIT
1' - 11"
1'
1'
1' - 11"
1'
1' - 11"
2"
1' - 11"
TR TOWER 2
01W
0223R 01S
01A 01
EXAM
1C132
203 SF
CORRIDOR
C1-26
882 SF
CLINICAL
PHARMACIST
1C130
96 SF
CLINICAL
PHARMACIST
1C129
105 SF
EXAM
1C131
191 SF EXAM
1C132
203 SF
CORRIDOR
C1-26
882 SF
CLINICAL
PHARMACIST
1C130
96 SF
CLINICAL
PHARMACIST
1C129
105 SF
EXAM
1C131
191 SF
NFPA
TABLE 7.2.1.1 FIRE RESISTANCE RATING FOR TYPE I - 332 (HR)
COLUMNS
SUPPORTING MORE THAN ONE FLOOR 3 HOUR
SUPPORTING ONE FLOOR / ROOF ONLY 2 HOUR
BEAMS
SUPPORTING ONE FLOOR / ROOF ONLY 2 HOUR
FLOOR/CEILING ASSEMBLIES 2 HOUR
ROOF/CEILING ASSEMBLIES 1 1/2 HOUR
INTERIOR/EXTERIOR NONBEARING WALLS 0 HOUR
FIRE RATED REQUIREMENTS
FIRE RATING SCHEDULE
UL
REFERENCE
COLUMNS SUPPORTING ONE FLOOR
HOURLY
RATINGTYPE ELEMENT
I 2 HR UL X854
I COLUMNS SUPPORTING MORE
THAN ONE FLOOR
3 HR UL X854
COLUMNS SUPPORTING ROOFI 2 HR UL X854
FLOOR DECKSI 2 HR UL D779
FLOOR SUPPORTSI 2 HR UL P732
ROOF DECKSI 1 1/2 HR UL P732
ROOF SUPPORTSI 2 HR UL N732
FIRE RATED SCHEDULE
+ POSITIVE ( + ) PRESSURE
CONSTRUCTION ZONE (--) PRESSURE
ANTE ROOM ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACK MAT
HEPA EQUIPED EXHAUST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0 /2
:0
:3 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /B
L D
G
W
T R
T O
W E
R
.r v t
01WA-101
BUILDING 01W - LEVEL 01 - DEMO, FLOOR
PLANS & RCPS
01W
MA SR/RB
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1. ALL PRODUCTS AND FINISHES SHALL MATCH EXISTING OR
ADJACENT EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS, FLOORS AND CEILINGS
WHERE MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS
ARE DEMOLISHED.
3. PROTECT FINISHES IN ROOMS ADJACENT TO THE AREA OF
WORK AND PARTS THAT ARE NOT INCLUDED IN THE
SCOPE.
4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP
UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT
PLYWOOD. SEE DETAIL 5/AE401.
5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND
DETAILS.
6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED
AND REMOVED.
7. REFER TO SHEET A-602 FOR DOOR SCHEDULE.
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
GENERAL NOTES
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
LEGEND
1/4" = 1'-0"
LEVEL 01 - TR TOWER 2 - DEMO FLOOR PLAN
1/4" = 1'-0"
LEVEL 01 - TR TOWER 2 - DEMO RCP
1/4" = 1'-0"
RM T2-01 - FLOOR PLAN
1/4" = 1'-0"
RM T2-01 - RCP
9 INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER
TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED
SPACE.
10 INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,
SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYPICAL.
11 PLACE TACKY MATS AT ENTRANCE AND EXIT OF
CONSTRUCTION AREA, MINIMUM SIZE 24"x36", TYPICAL.
1 DEMOLISH EXISTING WALL. PATCH EXPOSED WALL
INTERSECTIONS TO MATCH EXISTING.
2 DEMOLISH EXISTING DOOR/FRAME. PREPARE FOR NEW
DOOR/FRAME.
3 INSTALL NEW DOOR/FRAME.
4 CONSTRUCT NEW WALL.
5 CONSTRUCT NEW FLOOR.
6 APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE
VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.
7 INSTALL NEW RESILIENT RUBBER BASE AT ROOM
PERIMETER WITH SEALANT AT THE BOTTOM.
8 INSTALL FRT PLYWOOD OVER WALLS AS NEEDED PER
DETAIL 3/AE401, TYPICAL.
ICRA KEYNOTES
Revisions: Date:
ICRA CLASS IV LEGEND
09/03/20259/3/2025 115 OF 693
X Y Z
A16 A15 A14
A7 A6
A5 A4
A3
A8
A11 A10
A9
1W-6
1W-5
A2 A1
T2-A
T2-B
T2-1
T2-2
96 SF
EXAM 7
2C154
100 SF
EXAM 7
2C156
90 SF
EXAM 7
2C158
88 SF
EXAM 7
2C160
99 SF
EXAM 6
2C162
99 SF
EXAM 6
2C163
98 SF
SOILED 245
2C153
93 SF
TELEHEALTH
2C152
93 SF
SOCIAL WK
2C151
143 SF
DIETITIAN
2C150
89 SF
PHARMACY
2C148
16 SF
COMM
2C149A
56 SF
ELEC
2C14784 SF
IRM
2C145
216 SF
STAIRS
145 SF
BARIATRIC/
SPINAL EXAM 4
2C146
104 SF
EXAM 4
2C144
118 SF
EXAM 4
2C142
146 SF
EXAM 4
2C140
126 SF
PHLEB EKG
2C143
49 SF
PHLEB TOILET
2C141
44 SF
MED
2C161
77 SF
WOMEN'S
TOILET
2C139
105 SF
NURSE MGR
2C168
76 SF
CLEAN SUPPLY
2C165
89 SF
MENTAL
HEALTH
2C155
61 SF
TELERETINAL
2C15750 SF
STAFF TLT
2C167
124 SF
MEN'S TOILET
2C137
100 SF
EXAM 6
2C164
97 SF
EXAM 6
2C166103 SF
EXAM 5
2C170
EXAM 5
2C176
EXAM 5
2C174
224 SF
STAFF LOUNGE
2c177
125 SF
CLERKS 3 & 4
2C138
323 SF
RECEPTION 3 &
2C136
138 SF
EXAM 3
2C135
126 SF
EXAM 3
2C134
105 SF
EXAM 3
2C133
107 SF
EXAM 3
2C132
83 SF
PHARMACY
2C131
117 SF
EXAM 1
2C128
104 SF
EXAM 1
2C127
105 SF
EXAM 1
2C126
109 SF
EXAM 1
2C125
53 SF
2c129
38 SF
2c135a
77 SF
ELEV
W-1
145 SF
EXAM 2
2C124
77 SF
ELEV
W-2
CLEAN LINEN
MED. EQUIP.
1028 SF
C4
C4
EXAM 5
2C172
RECEPTION 5, 6,
& 7
2C173
217 SF
CLERKS 5, 6, & 7
2C169
114 SF
CLERKS 1&2
2C120A
146 SF
RECEPTION 1&2
2C120
87 SF
EXAM 2
2C121
109 SF
EXAM 2
2C122
81 SF
EXAM 2
2C123
316 SF
C1
2c183
108 SF
EXAM - 18
2c178
137 SF
EXAM - 19
2c179
140 SF
EXAM - 20
2c180
136 SF
EXAM - 17
2c175c
129 SF
EXAM - 14
2c175a
84 SF
TOILET
2c175d
69 SF
TOILET
2c175e
182 SF
ONCOLOGY
OFFICE
2c182
169 SF
EXAM - 21
2c18144 SF
HAC
SECURE
2c182a184 SF
RECEPTIONIST -
2C100
62 SF
MECH
2c184
61 SF
FEMALE
2C115
95 SF
MEN
2C116
79 SF
COMM.
CLOSET
2C117
31 SF
TLT
2C118A
155 SF
CHEMOTHERAPY
2C118
30 SF
ELEC
2C119A
46 SF
ELEC
2C119 117 SF
EXAM ROOM - 11
209 SF
STAIR
555 SF
ONCOLOGY
SUITE
2c175b
36 SF
VESTIBULE
2C123
193 SF
STAIR
120 SF
EXAM - 10
2C114
108 SF
EXAM - 9
2C113
118 SF
EXAM - 8
2C112
116 SF
EXAM - 7
2C111
125 SF
EXAM - 6
2C110
179 SF
EXAM 5
2C109
64 SF
E - 6
72 SF
E - 5
119 SF
ELEVATOR
LOBBY
342 SF
GROUP PATIENT
RM.
2c171
554 SF
WAITING AREA
-1
2C100A108 SF
B.M.E. OFFICE
116 SF
DIA. SUPPORT
2C102A
117 SF
NURSING
2C108
132 SF
EXAM - 4
2C107
129 SF
EXAM - 3
2C106
118 SF
EXAM - 2
2C105
64 SF
DIALYSIS
STOR-1
2C104
324 SF
CHAIR-DIALYSIS
2C102
181 SF
SPECIAL EKG
EXAM - 1
2C103
206 SF
STAIR
1161 SF
CORRIDOR - 1
172 SF
WAITING RM. - 2
2c175
387 SF
CORRIDOR - 1
1225 SF
C3
2A101c
HAC
1C111a
1042 SF
CORRIDOR
C2-35
98 SF
ELEV
P9
180 SF
STR
124 SF
OFFICE
2D115
253 SF
SECY
2D115A139 SF
OFFICE
2D116
188 SF
OFFICE
2D116A
126 SF
HSS
2D114
247 SF
DR. OFFICE
2D113
146 SF
LOUNGE
2D112
58 SF
F. TLT
2D111
97 SF
OFFICE
2D112A
2D109
22 SF
HAC
2D110
200 SF
OFFICE
2D105
109 SF
OFFICE
2D104
147 SF
MEN
2D108
166 SF
OFFICE
2D106
226 SF
FAN/ELEV RM
2D107
119 SF
OFFICE
2D106A
173 SF
OFFICE
2D103
150 SF
DR. OFFICE
2D103A
120 SF
WORK
2D102
155 SF
OFFICE
2D101A
187 SF
OFFICE
2D101
152 SF
OFFICE
2D100
627 SF
BLDG 2
C5
2C177
12 SF
2C149
BUILDING 01W
PHASE 1:
CONTRACTOR TO COMPLETE THE WORK OF THIS TR AND
ASSOCIATED DATA DROPS. COMPLETE ONE SECTION AT A
TIME AS DIRECTED TO COR.
BUILDING 01W
SECTION 1A:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BUILDING 01W
SECTION 1B:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BUILDING 01 & 01W
SECTION 1C:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BUILDING 02
SECTION 1D:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BLDG. 02
BLDG. 01W
BLDG. 01
TR TOWER 2
T2-02
161 SF
BLDG. 01A
BLDG. 01S
FEC
NEW SEMI-RECESSED FEC, TO MATCH
OR EXCEED EXISTING EXTINGUISHER IN
ABC RATING AND SIZE. SEE DET 4/A-604.
1W-1
1W-2
1W-3
1W-4
SPACE FOR NEW DATA CENTER
TR
ICRA PHASING LINE
ICRA CLASS III
ICRA CLASS IV
ICRA CLASS II
FIRE EXTINGUISHER CABINETFEC
FIRE EXTINGUISHERFE
BUILDING BOUNDARY LINE
2 HR FIRE RATED WALL
1 HR FIRE RATED WALL
SMOKE RATED WALL
KEY AREA SHOWN
PROJECT
NORTH
TR TOWER 2
01W
0223R 01S
01A 01
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:1
:4 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /B
L D
G
L E
V E
L
.r v t 01WAS102
BUILDING 01W - LEVEL 02 - PHASING PLAN
01W
MA RB
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTION, WV 25704-9300
1/16" = 1'-0"
BUILDING 01W - LEVEL 02 - PHASING PLAN
KEY PLAN
LEGEND
PROJECT
NORTH
09/03/20259/3/2025 116 OF 693
X
W
360°
C
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
SMOKE RATED WALL
NEW LIGHTS (SEE ELECTRICAL DETAILS)
KEY AREA SHOWN
PROJECT
NORTH
T2-S1
T2-S2
T2-SA
T2-B
FOOTPRINT OF NEW
CONSTRUCTION.
PREPARE AREA FOR
NEW CONSTRUCTION.
FOOTPRINT OF NEW
CONSTRUCTION. SEAL WINDOW DURING
CONSTRUCTION
SEAL WINDOW DURING
CONSTRUCTION
TEMPORARY LOCATION OF EXHAUST.
MOVE INSIDE NEW TR ONCE FEASIBLE.
T2-SB
ANTE
ROOM
T2-S1
T2-SA
T2-B
LINE OF NEW
CONSTRUCTION
LINE OF NEW
CONSTRUCTION.
T2-SB
T2-S1
T2-S2
T2-SA
T2-B
01WA-103c
01WA-103c
01WA-103b
01WA-103b
01WA-103b
161 SF
TR TOWER 2
T2-02
10' - 10 1/2" CLEARANCE
DATA RACK
ELEC PANEL
E1C
E1C
E1C
IN-03.01-10
EXAM 1
2C128
117 SF
EXAM 3
2C132
107 SF
EXISTING
FLOORINGN
E W
O R
IN
G
T2-SB
T2-A
T2-1
T2-2
ELECT PANEL
EXPANSION
JOINT
12' - 2 3/8"
3' - 6"
7' - 9"
5 1/2"
5 7/8"
/4
6"
1/
2"
7/ 8"
1/
2"
6"
T2-02
PHARMACY
2C131
83 SF
C3
2A101c
1225 SF
IN-01.02
04a
02b
T2-S1
T2-S2
T2-SA
T2-B
01WA-103c
01WA-103c
161 SF
TR TOWER 2
T2-02
EXPOSED
EXAM 1
2C128
117 SF
PHARMACY
2C131
83 SF
EXAM 3
2C132
107 SF
T2-SB
T2-A
T2-1
T2-2
C3
2A101c
1225 SF
1' - 11"
2'
7"
2' - 0"
2'
7"
2'
6" 2' - 0"
AC UNIT
1' - 2"
TR TOWER 2
01W
0223R 01S
01A 01
EXAM 3
2C132
107 SF
EXAM 1
2C128
117 SF
C3
2A101c
1225 SF
PHARMACY
2C131
83 SF
EXAM 3
2C132
107 SF
EXAM 1
2C128
117 SF
C3
2A101c
1225 SF
PHARMACY
2C131
83 SF
NFPA
TABLE 7.2.1.1 FIRE RESISTANCE RATING FOR TYPE I - 332 (HR)
COLUMNS
SUPPORTING MORE THAN ONE FLOOR 3 HOUR
SUPPORTING ONE FLOOR / ROOF ONLY 2 HOUR
BEAMS
SUPPORTING ONE FLOOR / ROOF ONLY 2 HOUR
FLOOR/CEILING ASSEMBLIES 2 HOUR
ROOF/CEILING ASSEMBLIES 1 1/2 HOUR
INTERIOR/EXTERIOR NONBEARING WALLS 0 HOUR
FIRE RATED REQUIREMENTS
FIRE RATING SCHEDULE
UL
REFERENCE
COLUMNS SUPPORTING ONE FLOOR
HOURLY
RATINGTYPE ELEMENT
I 2 HR UL X854
I COLUMNS SUPPORTING MORE
THAN ONE FLOOR
3 HR UL X854
COLUMNS SUPPORTING ROOFI 2 HR UL X854
FLOOR DECKSI 2 HR UL D779
FLOOR SUPPORTSI 2 HR UL P732
ROOF DECKSI 1 1/2 HR UL P732
ROOF SUPPORTSI 2 HR UL N732
FIRE RATED SCHEDULE
+ POSITIVE ( + ) PRESSURE
CONSTRUCTION ZONE (--) PRESSURE
ANTE ROOM ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACK MAT
HEPA EQUIPED EXHAUST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0 /2
:0
:3 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /B
L D
G
W
T R
T O
W E
R
.r v t
01WA-102
BUILDING 01W - LEVEL 02 - DEMO, FLOOR
PLANS & RCPS
01W
MA SR/RB
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1. ALL PRODUCTS AND FINISHES SHALL MATCH EXISTING OR
ADJACENT EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS, FLOORS AND CEILINGS
WHERE MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS
ARE DEMOLISHED.
3. PROTECT FINISHES IN ROOMS ADJACENT TO THE AREA OF
WORK AND PARTS THAT ARE NOT INCLUDED IN THE
SCOPE.
4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP
UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT
PLYWOOD. SEE DETAIL 5/AE401.
5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND
DETAILS.
6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED
AND REMOVED.
7. REFER TO SHEET A-602 FOR DOOR SCHEDULE.
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
GENERAL NOTES
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
LEGEND
1/4" = 1'-0"
LEVEL 02 - TR TOWER 2 - DEMO FLOOR PLAN
1/4" = 1'-0"
LEVEL 02 - TR TOWER 2 - DEMO RCP
1/4" = 1'-0"
RM T2-02 - FLOOR PLAN
1/4" = 1'-0"
RM T2-02 - RCP
9 INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER
TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED
SPACE.
10 INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,
SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYPICAL.
11 PLACE TACKY MATS AT ENTRANCE AND EXIT OF
CONSTRUCTION AREA, MINIMUM SIZE 24"x36", TYPICAL.
1 DEMOLISH EXISTING WALL. PATCH EXPOSED WALL
INTERSECTIONS TO MATCH EXISTING.
2 DEMOLISH PORTION OF EXISTING WALL. PREPARE FOR NEW
DOOR/FRAME.
3 INSTALL NEW DOOR/FRAME.
4 CONSTRUCT NEW WALL.
5 CONSTRUCT NEW FLOOR.
6 APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE
VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.
7 INSTALL NEW RESILIENT RUBBER BASE AT ROOM
PERIMETER WITH SEALANT AT THE BOTTOM.
8 INSTALL FRT PLYWOOD OVER WALLS AS NEEDED PER
DETAIL 3/AE401, TYPICAL.
ICRA KEYNOTES
Revisions: Date:
09/03/20259/3/2025 117 OF 693
ICRA CLASS III
ICRA CLASS IV
ICRA CLASS II
FIRE EXTINGUISHER CABINETFEC
FIRE EXTINGUISHERFE
BUILDING BOUNDARY LINE
2 HR FIRE RATED WALL
1 HR FIRE RATED WALL
SMOKE RATED WALL
1W-5
1W-6
T2-A
T2-2
T2-1
T2-B
613 SF
SURGEONS (13)
3C-179
41 SF
TLT
3C-180
39 SF
TLT
3C-181
315 SF
RESIDENTS (11)
3C-182
76 SF
NURSE NAV
3C-183
99 SF
I.C. MGR / SW
3C-184
267 SF
CONFERENCE
3C185
68 SF
SECY
3C186
665 SF
AA
3C187
85 SF
SURG
3C188
83 SF
H.S.S.
3C189
97 SF
CLIN
3C190
97 SF
CHIEF SURG
3C191
149 SF
3C147B
S F
C O
M
C L
O S
E T
C
-1
100 SF
ELEC
CLOSET
3C-152
8 SF
3C-156A
72 SF
3C-156 265 SF
EXAM 1
3C-155
188 SF
LASER
3C-154
RETINAL
PHOTOGRAPHY
3C-153
108 SF
EXAM 7
3C-150
134 SF
3C151
133 SF
EXAM 5
3C-149
101 SF
EXAM 4
3C-145A
139 SF
EXAM 2
3C-143
175 SF
STAFF
OPTOMIST
3C140
173 SF
CHIEF
OPTOMIST
3C139
92 SF
OPTOMETRIST
3C-141
233 SF
3C138
96 SF
MAN TLT.
3C134
77 SF
WOMAN
3C13590 SF
OFFICE
3C131
42 SF
ELEV.
W1
42 SF
ELEV.
W2
525 SF
C3-26
93 SF
STORAGE
3C142
89 SF
OPTIC NERVE
IMAGING
3C144
88 SF
VISUAL FIELDS
3C146
111 SF
EXAM 3
3C-145
146 SF
EXAM 1
3C148
105 SF
EXAM 6
114 SF
BUS. OFFICE
3C166
105 SF
TUMOR REG
3C165
360 SF
IRM
3C167
997 SF
WAITING ROOM
3C147
S
F
B U
S
O F
F
IC
E
C
407 SF
IRM
3C168A
315 SF
BLIND REHAB
3C169
100 SF
EXAM
3C170
102 SF
EXAM
3C171
183 SF
WAITING AREA
186 SF
3C137
419 SF
OPTICAL
CONFERENCE
3C133
196 SF
OPTICAL STORE
3C132
210 SF
STAIR
135 SF
C3-25
BLDG. 02
BUILDING 01W
PHASE 1:
CONTRACTOR TO COMPLETE THE WORK OF THIS TR AND
ASSOCIATED DATA DROPS. COMPLETE ONE SECTION AT A
TIME AS DIRECTED TO COR.
BUILDING 01W
SECTION 1A:
CONTRACTOR TO COORDINATE WITH VA FOR
ROOM CLOSURES AND AVAILABILITY TO COMPLETE
DATA WIRING IN THIS AREA.
BUILDING 01W
SECTION 1B:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BLDG. 01W
BLDG. 01
TR TOWER 2
T2-03
164 SF
94 SF
STAFF
RESIDENT
3C-136
227 SF
STAIRS
FEC
NEW SEMI-RECESSED FEC, TO MATCH
OR EXCEED EXISTING EXTINGUISHER IN ABC RATING AND
SIZE. SEE DET 3/A603.
1W-1
1W-2
1W-3
1W-4
TR TOWER 2
01W
01S
01A 01
23R
KEY AREA SHOWN
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:1
:3 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /B
L D
G
L E
V E
L
.r v t 01WAS103
BUILDING 01W - LEVEL 03 - PHASING PLAN
01W
MA RB
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
PROJECT
NORTH
KEY PLAN
LEGEND
1/16" = 1'-0"
BUILDING 01W - LEVEL 03 - PHASING PLAN
09/03/20259/3/2025 118 OF 693
X
W
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
SMOKE RATED WALL
NEW LIGHTS (SEE ELECTRICAL DETAILS)
KEY AREA SHOWN
PROJECT
NORTH
T2-S1
T2-S2
T2-SA
T2-B
FOOTPRINT OF NEW
CONSTRUCTION.
PREPARE AREA FOR
NEW CONSTRUCTION.
FOOTPRINT OF NEW
CONSTRUCTION.
SEAL WINDOW DURING
CONSTRUCTION
SEAL WINDOW DURING
CONSTRUCTION
TEMPORARY LOCATION OF EXHAUST.
MOVE INSIDE NEW TR ONCE FEASIBLE.
T2-SB
ANTE
ROOM
3' - 8"
T2-S1
T2-S2
T2-SA
T2-B
LINE OF NEW
CONSTRUCTION
LINE OF NEW
CONSTRUCTION.
T2-SB
T2-S1
T2-S2
T2-SA
T2-B
01WA-103c
01WA-103c
01WA-103b
01WA-103b
01WA-103b
164 SF
TR TOWER 2
T2-03
C
LE
A R
A N
C E
11' - 0 1/2" CLEARANCE
E1C E1C
E1C
IN-03.01-13
CHIEF OPTOMIST
3C139
173 SF
CORR
310 SF
3C138
233 SF
NEW
FLOORING
E X
IS
T
IN
G
O R
IN
G
T2-SB
T2-A
T2-1
T2-2
T2-03
ELECT PANEL
12' - 2 3/8"
5 7/8"
5 1/2"
7' - 9"
3' - 6"
FACE OF
STUDS
/4
6"
1/ 2"
7/ 8"
1/
2" 6"
.0
AE512
IN-01.31
02b
04a
T2-S1
T2-S2
T2-SA
T2-B
01WA-103c
01WA-103c
164 SF
TR TOWER 2
T2-03
CHIEF OPTOMIST
3C139
173 SF
CORR
310 SF
3C138
233 SF
EXPOSED
T2-SB
T2-A
T2-1
T2-2
EXPANSION
JOINT
1' - 7"
1'
3"
2' - 1"
1'
2'
1"
8"
1' - 9"
AC UNIT
1' - 2"
TR TOWER 2
01W
01S
01A 01
23R
CHIEF OPTOMIST
3C139
173 SF
STAFF OPTOMIST
3C140
175 SF
CORR
310 SF
3C138
233 SF
CHIEF OPTOMIST
3C139
173 SF
STAFF OPTOMIST
3C140
175 SF
CORR
310 SF
3C138
233 SF
NFPA
TABLE 7.2.1.1 FIRE RESISTANCE RATING FOR TYPE I - 332 (HR)
COLUMNS
SUPPORTING MORE THAN ONE FLOOR 3 HOUR
SUPPORTING ONE FLOOR / ROOF ONLY 2 HOUR
BEAMS
SUPPORTING ONE FLOOR / ROOF ONLY 2 HOUR
FLOOR/CEILING ASSEMBLIES 2 HOUR
ROOF/CEILING ASSEMBLIES 1 1/2 HOUR
INTERIOR/EXTERIOR NONBEARING WALLS 0 HOUR
FIRE RATED REQUIREMENTS
FIRE RATING SCHEDULE
UL
REFERENCE
COLUMNS SUPPORTING ONE FLOOR
HOURLY
RATINGTYPE ELEMENT
I 2 HR UL X854
I COLUMNS SUPPORTING MORE
THAN ONE FLOOR
3 HR UL X854
COLUMNS SUPPORTING ROOFI 2 HR UL X854
FLOOR DECKSI 2 HR UL D779
FLOOR SUPPORTSI 2 HR UL P732
ROOF DECKSI 1 1/2 HR UL P732
ROOF SUPPORTSI 2 HR UL N732
FIRE RATED SCHEDULE
+ POSITIVE ( + ) PRESSURE
CONSTRUCTION ZONE (--) PRESSURE
ANTE ROOM ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACK MAT
HEPA EQUIPED EXHAUST
1. ALL PRODUCTS AND FINISHES SHALL MATCH EXISTING OR
ADJACENT EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS, FLOORS AND CEILINGS
WHERE MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS
ARE DEMOLISHED.
3. PROTECT FINISHES IN ROOMS ADJACENT TO THE AREA OF
WORK AND PARTS THAT ARE NOT INCLUDED IN THE
SCOPE.
4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP
UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT
PLYWOOD. SEE DETAIL 5/AE401.
5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND
DETAILS.
6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED
AND REMOVED.
7. REFER TO SHEET A-602 FOR DOOR SCHEDULE.
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
GENERAL NOTES
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0 /2
:0
:4 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /B
L D
G
W
T R
T O
W E
R
.r v t
01WA-103
BUILDING 01W - LEVEL 03 - DEMO, FLOOR
PLANS & RCPS
01W
MA SR/RB
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1/4" = 1'-0"
LEVEL 03 - TR TOWER 2 - DEMO FLOOR PLAN
1/4" = 1'-0"
LEVEL 03 - TR TOWER 2 - DEMO RCP
1/4" = 1'-0"
RM T2-03 - FLOOR PLAN
1/4" = 1'-0"
RM T2-03 - RCP
9 INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER
TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED
SPACE.
10 INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,
SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYPICAL.
11 PLACE TACKY MATS AT ENTRANCE AND EXIT OF
CONSTRUCTION AREA, MINIMUM SIZE 24"x36", TYPICAL.
1 DEMOLISH EXISTING WALL. PATCH EXPOSED WALL
INTERSECTIONS TO MATCH EXISTING.
2 DEMOLISH PORTION OF EXISTING WALL. PREPARE FOR NEW
DOOR/FRAME.
3 INSTALL NEW DOOR/FRAME.
4 CONSTRUCT NEW WALL.
5 CONSTRUCT NEW FLOOR.
6 APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE
VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.
7 INSTALL NEW RESILIENT RUBBER BASE AT ROOM
PERIMETER WITH SEALANT AT THE BOTTOM.
8 INSTALL FRT PLYWOOD OVER WALLS AS NEEDED PER
DETAIL 3/AE401, TYPICAL.
ICRA KEYNOTES
Revisions: Date:
09/03/20259/3/2025 119 OF 693
LEVEL 00G
0' - 0"
LEVEL 01
11' - 9"
LEVEL 03
36' - 6 1/2"
LEVEL 02
24' - 6 1/2"
LEVEL 4
51' - 2 1/2"
01WA-103c
PARAPET TRIM
VENEER BRICK
HORIZONTAL SLIP
JOINT, TYPICAL
WALL TO WALL
EXPANSION JOINT
COVER
0"
2'
LEVEL 00G
0' - 0"
LEVEL 01
11' - 9"
LEVEL 03
36' - 6 1/2"
LEVEL 02
24' - 6 1/2"
LEVEL 4
51' - 2 1/2"
T2-S1 T2-S2
PARAPET TRIM
VENEER BRICK
HORIZONTAL SLIP
JOINT, TYPICAL
EXISTING LIMESTONE
EXISTING ALUMINUM FIXED
WINDOW
EXISTING VENEER
BRICK
LEVEL 00G
0' - 0"
LEVEL 01
11' - 9"
LEVEL 03
36' - 6 1/2"
LEVEL 02
24' - 6 1/2"
LEVEL 4
51' - 2 1/2"
01WA-103c
PARAPET TRIM
VENEER BRICK
HORIZONTAL SLIP
JOINT, TYPICAL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0 /2
:0
:4 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /B
L D
G
W
T R
T O
W E
R
.r v t
01WA-103b
TR TOWER 2 - EXTERIOR ELEVATIONS
01W
MA SR
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1/4" = 1'-0"
TR TOWER 2 NORTHEAST ELEVATION
1/4" = 1'-0"
TR TOWER 2 NORTHWEST ELEVATION
1/4" = 1'-0"
TR TOWER 2 SOUTHWEST ELEVATION
09/03/20259/3/2025 120 OF 693
LEVEL 01
11' - 9"
LEVEL 03
36' - 6 1/2"
LEVEL 02
24' - 6 1/2"
LEVEL 4
51' - 2 1/2"
LEVEL 01
11' - 9"
LEVEL 2
24' - 6 1/2"
LEVEL 03
36' - 6 1/2"
LEVEL 02
24' - 6 1/2"
2F ROOF
36' - 6 1/2"
LEVEL 03
36' - 6 1/2"
LEVEL 03
36' - 6 1/2"
LEVEL 4
51' - 2 1/2"
01WA-103c
164 SF
TR TOWER 2
T2-00G
160 SF
TR TOWER 2
T2-01
CORRIDOR
1280 SF
PHARMACY
2C131
83 SF
CORR
310 SF
EXTERIOR WALL:
• BRICK VENEER
• 2 3/16" AIR SPACE W/ 2"
ALUMINUM T- FURRING
• R-10ci RIGID INSULATION
• AIR & WATER resistance BARRIER
• 5/8" EXTERIOR GYPSUM BOARD
• 8" METAL STUDS @ 16" OC
• R-15 BATT INSULATION
• VAPOR RETARDER
• 5/8" TYPE X GYPSUM BOARD
161 SF
TR TOWER 2
T2-02
164 SF
TR TOWER 2
T2-03
01W-AE451
01W-AE451
Level 00G 0' - 0"
Level 01 11' - 9"
Level 02 24' - 6 1/2"
Level 03 36' - 6 1/2"
Level 04 51' - 2 1/2"
Level 00B -13' - 9"
TOW DATA
CENTER
18' - 0"
TOF
-4' - 0"
EXAM
1C131
191 SF
2'
LEVEL 00G
0' - 0"
LEVEL 01
11' - 9"
LEVEL 03
36' - 6 1/2"
LEVEL 02
24' - 6 1/2"
LEVEL 4
51' - 2 1/2"
T2-2T2-1
LEVEL 01
11' - 9"
LEVEL 2
24' - 6 1/2"
LEVEL 03
36' - 6 1/2"
LEVEL 02
24' - 6 1/2"
2F ROOF
36' - 6 1/2"
LEVEL 03
36' - 6 1/2"
LEVEL 03
36' - 6 1/2"
LEVEL 4
51' - 2 1/2"
01WA-103c
164 SF
TR TOWER 2
T2-00G
160 SF
TR TOWER 2
T2-01
164 SF
TR TOWER 2
T2-03
161 SF
TR TOWER 2
T2-02
R1
E1C
F2
E1C
F-1
F2
F1
EXTERIOR WALL:
• BRICK VENEER
• 2 3/16" AIR SPACE W/ 2"
ALUMINUM T- FURRING
• R-10ci RIGID INSULATION
• AIR & WATER resistance
BARRIER
• 5/8" EXTERIOR GYPSUM
BOARD
• 8" METAL STUDS @ 16"
OC
• R-15 BATT INSULATION
• VAPOR RETARDER
• 5/8" TYPE X GYPSUM
BOARD
Level 00G 0' - 0"
Level 01 11' - 9"
Level 02 24' - 6 1/2"
Level 03 36' - 6 1/2"
Level 04 51' - 2 1/2"
TOW DATA
CENTER
18' - 0"
TOF
-4' - 0"
A F
G
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0 /2
:0
:3 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /B
L D
G
W
T R
T O
W E
R
.r v t
01WA-103c
TR TOWER 2 - BUILDING SECTIONS
01W
MA SR
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1/4" = 1'-0"
TR TOWER 2 SECTION NORTH/SOUTH LOOKING EAST
1/4" = 1'-0"
TR TOWER 2 SECTION EAST/WEST LOOKING NORTH
(E) LIMESTONE
PARAPET
(E) BRICK VENEER
09/03/20259/3/2025 121 OF 693
LEVEL 01
11' - 9"
LEVEL 03
36' - 6 1/2"
LEVEL 4
51' - 2 1/2"
EXTERIOR WALL:
• BRICK VENEER
• 2 3/16" AIR SPACE W/ 2"
ALUMINUM T- FURRING
• R-10ci RIGID INSULATION
• AIR & WATER resistance BARRIER
• 5/8" EXTERIOR GYPSUM BOARD
• 8" METAL STUDS @ 16" OC
• R-15 BATT INSULATION
• VAPOR RETARDER
• 5/8" TYPE X GYPSUM BOARD
R1
F2
01W-AE511
01W-AE511
01W-AE511
LEVEL 00G
0' - 0"
LEVEL 01
11' - 9"
LEVEL 03
36' - 6 1/2"
LEVEL 4
51' - 2 1/2"
01W-AE511
MBF2H0350
FIRE STOPPING, TYP
SPRAY FIRE PROOFING AT
ALL STRUCTURAL STEEL
2HBCP-2-250
MILL FINISH ALUMINUM FLOOR
EXPANSION JOINT COVER
2 HOUR RATED WITH
MBF2H0350
UL LISTING FF-D-1071
50% MOVEMENT
TYPICAL AT EXISTING FLOOR
CONNECTIONF2
01W-AE511
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0 /2
:0
:2 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /B
L D
G
W
T R
T O
W E
R
.r v t
01W-AE451
WALL SECTIONS
01W
MA SR
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1/2" = 1'-0"
TR TOWER T2 NORTH WALL SECTION
1/2" = 1'-0"
TR TOWER T2 SOUTH WALL SECTION
09/03/20259/3/2025 122 OF 693
T2-S1
T2-S2
T2-SA
T2-B
LINE OF NEW ROOF
T2-S1
T2-S2
T2-SA
T2-B
01WA-103c
01WA-103c
01WA-103b
01WA-103b
01WA-103b
T2-SB
T2-A
T2-1
T2-2
1/4" / 1'-0"
1/4" / 1'-0"
" / 1'-0"
R1
THRU-WALL SCUPPER
RE: 3/01S-A-513 (SIM)
(E) MEMBRANE ROOFING
SYSTEM
1/ 4"
'-0
MECH SHAFT
1" / 1'-0"
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
SMOKE RATED WALL
NEW LIGHTS (SEE ELECTRICAL DETAILS)
KEY AREA SHOWN
PROJECT
NORTH
TR TOWER 2
01W
01S
01A 01
01W
01S
01A 01
23R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0 /2
:0
:3 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /B
L D
G
W
T R
T O
W E
R
.r v t
01WA-104
BUILDING 01W - ROOF PLAN
01W
MA RB/SR
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1/4" = 1'-0"
TR TOWER 2 - ROOF PLAN (EXISTING)
1/4" = 1'-0"
TR TOWER 2 - ROOF PLAN
PROJECT
NORTH
PROJECT
NORTH
1. ALL PRODUCTS AND FINISHES SHALL MATCH EXISTING OR
ADJACENT EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS, FLOORS AND CEILINGS
WHERE MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS
ARE DEMOLISHED.
3. PROTECT FINISHES IN ROOMS ADJACENT TO THE AREA OF
WORK AND PARTS THAT ARE NOT INCLUDED IN THE
SCOPE.
4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP
UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT
PLYWOOD. SEE DETAIL 5/AE421.
5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND
DETAILS.
6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED
AND REMOVED.
1 CONSTRUCT NEW ROOF.
GENERAL NOTES
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
LEGEND
09/03/20259/3/2025 123 OF 693
EXTRUDED ALUMINUM
"T" PROFILE
ALUMINUM BRACKET @ 32" OC
STAINLESS STEEL HEX HEAD
SELF DRILLING SCREWS
CORIUM VENEER BRICK
SYSTEM
ALUMINUM BASE
FLASHING WITH
HEMMED EDGE OVER
R-GUARD FASTFLASH
PERFORATED ANGLE
1/2" SEALANT & BACKER
ROD
BACKER ROD &
SEALANT IN JOINT
SLOPE TO DRAIN
EPDM OR FOAMED
POLYETHYLENE SILL
SEALER
1/
4"ALUMINUM BASE FLASHING
M
IN
7/8"
R-10 RIGID INSULATION
CONT AIR &
WATER resistance
BARRIER
1/2" PLYWOOD SHEATHING
R-13 BATT INSULATION
CONT VAPOR RETARDER
5/8" GWB
1/2" FIRE TREATED
PLYWOOD SHEATHING
REINF CONC FLOOR
PER STRUCT
FLOOR FINISH AND
BASE PER FINISH
SCHEDULE, TYP
AIR & WATER resistance
BARRIER OVER BASE
FLASHING
FILL EXPANSION JOINT
WITH JOINT FILLER
WATER PROOFING
R-10 RIGID INSULATION
VAPOR BARRIER
3/4"x3/4" GALV
SHEET METAL TRIM
LEVEL 01
11' - 9"
AIR & WATER
RESISTANCE BARRIER
CONT Z-CHANNEL
FAST FLASH OVER
FLOOR JOINT
ALUMINUM BRACKET @
32" OC
STAINLESS STEEL HEX
HEAD SELF DRILLING
SCREWS
R-10 RIGID INSULATION
EXTRUDED ALUMINUM T-
PROFILE GRADE 6063T6
MILL FINISH
BACKER ROD &
SEALANT IN JOINT
EPDM OR FOAMED
POLYETHYLENE SILL
SEALER
R-13 BATT INSULATION
CONT VAPOR RETARDER 5/8" GWB
1/2" FIRE TREATED
PLYWOOD SHEATHING
CONCRETE TOPPING
OVER METAL DECK
PER STRUCT
FLOOR FINISH AND
BASE PER FINISH
SCHEDULE, TYP
SPRAY APPLIED
FIREPROOFING
FILL GAP WITH MINERAL
WOOL INSULATION
REFER TO STRUCTURAL
DETAIL
3/4"x3/4" GALV
SHEET METAL TRIM
FILL GAP WITH MINERAL
WOOL INSULATION
LEVEL 4
51' - 2 1/2"
1/2" COVER BOARD
TREATED WOOD NAILERS TO
MATCH HEIGHT OF INSULATION
AND COVER BOARD
FLASHING MEMBRANE
HOT-AIR WELD
ROOFING MEMBRANE
R-30ci RIGID INSULATION, MIN
PRE-FINISHED SHEET METAL
PARAPET CAP FLASHING
WITH WATERTIGHT JOINT
ROOF FLASHING
MEMBRANE WRAP OVER
TOP OF PARAPET WALL
VAPOR RETARDER
AIR & WATER
RESISTANCE BARRIER
CONT Z-CHANNEL
FAST FLASH OVER
FLOOR JOINT
ALUMINUM BRACKET @
32" OC
STAINLESS STEEL HEX
HEAD SELF DRILLING
SCREWS
VENTILATION GAP
PROTECTED WITH
INSECT MESH
3/
4"
3/
4"
2" 1/2" 8"
R-10 RIGID
INSULATION
EXTRUDED ALUMINUM
T-PROFILE GRADE
6063T6 MILL FINISH
CORIUM BRICK
CORIUM BRICK TRAY
SAND LAME / POLYMER
CEMENT POINTING
MORTAR
/2
3/4"
1/4"
LEVEL 4
51' - 2 1/2"
SURFACE MOUNTED CONT
REGLET
CONT BEAD OF SEALANT
EXISTING REINF CONC
ROOF PARAPET
EXISTING BUILDINGNEW ADDITION
/4
FIRE RETARDANT SPRAY FOAM
OVER STRUCTURAL STEEL
MEMBERS
SARNAFIL FLASHING
MEMBRANE, HOT-AIR WELD
NEW OPENING IN
EXISTING PRECAST
CONC PARAPET FOR
INSTALLATION OF NEW
SCUPPER
O P
N G
"x
INSTALL THRU-WALL
SCUPPER IN FULL BED
OF SEALANT
FLASHING MEMBRANE
HOT-AIR WELD
ROOFING MEMBRANE
O P
N G
5/
8" x
5"
LEVEL 00G
0' - 0"
2" 5/
8"
1 15/16" 5" 1 15/16"
1 HR FIRE RATED HM
DOOR AND FRAME,
TYP
PROVIDE NEW LOOSE
LINTEL AT NEW DOOR
OPENING, TYP
5/8" GWB OVER (E) STUDS @
AREA ABOVE NEW DOOR
OPENING
5/8" GWB OVER 2 1/2" STUDS
@ 16" OC ABOVE NEW DOOR
OPENING
PATCH AND REPAIR (E)
CEILING
SEALANT, TYP
CONCRETE PATCH
AND FILL @ (E) FLOOR
EDGE
EXISTING BUILDINGNEW ADDITION
BCSW PRE-
COMPRESSED
PRIMARY SEAL
5/8" GWB
1/2" FIRE TREATED
PLYWOOD SHEATHING
3/4"x3/4" GALV
SHEET METAL TRIM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0 /2
:0
:3 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /B
L D
G
W
T R
T O
W E
R
.r v t
01W-AE511
EXTERIOR DETAILS
01W
MA SR
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
3" = 1'-0"
TYPICAL DETAIL AT WALL BASE
3" = 1'-0"
TYPICAL DETAIL - FLOOR
3" = 1'-0"
TYPICAL PARAPET DETAIL
3" = 1'-0"
SECTION DETAIL - THRU-WALL SCUPPER
3" = 1'-0"
TYPICAL DETAIL - NEW DOOR HEAD AND SILL
09/03/20259/3/2025 124 OF 693
ICRA CLASS III
ICRA CLASS IV
FIRE EXTINGUISHER CABINETFEC
FIRE EXTINGUISHERFE
ICRA CLASS II
BUILDING BOUNDARY LINE
2 HR FIRE RATED WALL
1 HR FIRE RATED WALL
SHOWN AREA
PROJECT
NORTH
A7 A6
A5 A4
A3
A8
A11 A10
A9
A2 A1
164 SF
ELEC
BD102 331 SF
ELECTRIC
BD103
109 SF
STORAGE
BD107
167 SF
WATER INTAKE
BD108
497 SF
WATER
SOFTENER
BD106
86 SF
BD105
1206 SF
BIOMEDICAL
ENGINEERING
BD104
238 SF
BD100
718 SF
MAS MAIL ROOM
BD101
1074 SF
CORRIDOR
71 SF
ELEC
104 SF
SHREDDING
MAS
27 SF
STOR
19 SF
TLT
49 SF
ELEV
F8
775 SF
ENG. PLUMPING
SHOP
BD112
1061 SF
ENG. AIR
CONDITIONING
SHOP
BD110
238 SF
HOT WATER
HEATERS
ENG STORAGE
BD106A
809 SF
ENG.
ELECTRICAL
SHOP
72 SF
HVAC
BD104A
169 SF
LOCKSMITH
BD104B
501 SF
ENG. M&R
FOREMAN
1444 SF
CARPENTRY
SHOP
183 SF
M&O FOREMAN
BD102C
116 SF
PAINT
VAULT
87 SF
STORAGE
BD102D
108 SF
PAINT
BOOTH
BD102B
85 SF
TOILET
BD102A
55 SF
TLT
382 SF
PAINT SHOP
BUILDING 02
PHASE 1:
CONTRACTOR TO COMPLETE THE WORK OF THIS TR
AND ASSOCIATED DATA DROPS. COMPLETE ONE
SECTION AT A TIME AS DIRECTED TO COR.
BUILDING 02
SECTION 1A:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BUILDING 02
SECTION 1B:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BLDG. 01S
TR TOWER 3
T3-00B
175 SFFEC
NEW SEMI-RECESSED FEC, TO MATCH
OR EXCEED EXISTING EXTINGUISHER IN
ABC RATING AND SIZE. SEE DET 4/A-604.
01W
0223R 01S
TR TOWER 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:0
:5 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /B
L D
G
B A
S E
M E
N T
.r v t
02AS100B
BUILDING 02 - LEVEL 00B - PHASING PLAN
MA RB
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
KEY PLAN
LEGEND
1/16" = 1'-0"
BUILDING 02 - LEVEL 00B - PHASING PLAN
PROJECT
NORTH
09/03/20259/3/2025 125 OF 693