S02 - ATT 27 - 581-22-700 - Asbestos locations.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades Federal contract opportunity
- Solicitation number
- 36C77626R0025
About this file
This is an asbestos locations inventory spreadsheet documenting suspected and confirmed asbestos-containing materials (ACM) and presumed asbestos-containing materials (PACM) at the Hershel "Woody" Williams Veteran Affairs Medical Center in Huntington, West Virginia. The spreadsheet identifies asbestos locations across Building 1, Building 1A, and Building 1W, cataloging material types, sample IDs, locations, chrysotile content percentages where tested, AHERA categories, condition ratings, and quantities.
The inventory documents both sampled and unsampled materials, including vinyl floor tiles and mastics with confirmed 2-10% chrysotile content or positive results, asphalt roof shingles (10,000 SF in Building 1 and 8,000 SF in Building 1A), pipe insulation, fire doors, elevator brake shoes, and miscellaneous packings and gaskets. Notable entries include 16,949 SF of presumed asbestos debris in the crawlspace under concrete and concrete flooring, and 25,000 SF of black mastic under brown mottled vinyl floor tiles in Building 1W. All materials are rated in good condition or significantly damaged, with condition ratings of 5 assigned to most items. This inventory directly supports the EHRM Huntington VAMC Infrastructure Upgrades project (Solicitation 36C77626R0025), a $20-50 million Service-Disabled Veteran-Owned Small Business set-aside requiring contractors to address asbestos abatement and removal as part of the 690-calendar-day construction scope.
View the file
Other files for this federal contract opportunity
Show all 50
EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Material Type | Sample ID | Sample Location | Content | Type | AHERA Category | Condition | Quantity | Notes | Location |
| M - Asphalt Roof Shingle | Not Sampled | N/A | POS | N/A | 5 | Good | 10,000 SF | Exterior Roof Shingles Assumed ACM | Building 1 |
| M - Fire Doors | Not Sampled | N/A | POS | N/A | 5 | Good | Not Quantified | Metal Fire Doors Assumed ACM | Building 1 |
| M - Mastic Coating on Surface | Not Sampled | N/A | POS | N/A | 5 | Good | N/A | Miscellaneous Wall/Ceiling Mastics are Assumed ACM | Building 1 |
| M - Elevator Brake Shoes | Not Sampled | N/A | POS | N/A | 5 | Good | 2 Elevator Cabs | Elevator Brake Systems are Assumed to have ACM Brake Pads | Building 1 |
| M - Other, Not Listed (add description) | Not Sampled | N/A | POS | N/A | 5 | Good | N/A | Miscellaneous Packings and Gaskets are Assumed to be ACM | Building 1 |
| T - Pipe Insulation (Fittings, Elbows, Runs) | Not Sampled | N/A | POS | N/A | 5 | Good | N/A | Pipe Joint Insulation Compounds are Assumed to be Asbestos-Containing Based on prior Sample Data | Building 1 |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | Not Sampled | N/A | POS | N/A | 5 | Good | N/A | Pipe Insulation is Assumed to be Asbestos-Containing Based on Prior Sample Data | Building 1 |
| M - Mastic Coating on Surface | Not Sampled | N/A | POS | N/A | 5 | Good | 1,000 SF | Presumed ACM Floor Tile Mastics (including the non-acm Floor Tiles) in 2nd Floor Rear Hallway | Building 1 |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | Not Sampled | N/A | POS | N/A | 1 | Sig Damaged | 16,949 SF | Presumed Asbestos Debris in Floor of Crawlspace Encased Under Concrete and Presumed ACM PI/PJIC Remnant Debris found within a Trench under the Ground Floor Flooring | Building 1 |
| M - Vinyl Floor Tile | Huntington-102909-4-4-295 | Building 1, 4th Floor, Hallway | 2-10% | Chrysotile | 5 | Good | 250 SF | 9x9 grey w/ white streaks VFT | Building 1 |
| M - Vinyl Floor Tile | Huntington-102909-4-4-296 | Building 1, 4th Floor, Hallway | POS | Chrysotile | 5 | Good | 250 SF | 9x9 grey w/ white streaks VFT | Building 1 |
| M - Vinyl Floor Tile | Huntington-102909-4-4-297 | Building 1, 4th Floor, Hallway | 2-10% | Chrysotile | 5 | Good | 250 SF | 9x9 white mottled VFT | Building 1 |
| M - Floor Tile Mastic | Huntington-102909-4-4-297 | Building 1, 4th Floor, Hallway | 2-10% | Chrysotile | 5 | Good | 250 SF | black mastic assoc. w/ 9x9 white mottled VFT | Building 1 |
| M - Vinyl Floor Tile | Huntington-102909-4-4-298 | Building 1, 4th Floor, Hallway | POS | Chrysotile | 5 | Good | 250 SF | 9x9 white mottled VFT | Building 1 |
| M - Floor Tile Mastic | Huntington-102909-4-4-298 | Building 1, 4th Floor, Hallway | POS | Chrysotile | 5 | Good | 250 SF | black mastic assoc. w/ 9x9 white mottled VFT | Building 1 |
| M - Other, Not Listed (add description) | Huntington-102709-1A-1-191 | Ground Level, Stairwell 10 | 2-10% | Chrysotile | 5 | Good | 1,000 SF | Layer 1 - Brown Mottled Vinyl Stair Tread | Building 1A |
| M - Other, Not Listed (add description) | Huntington-102709-1A-1-192 | Ground Level, Stairwell 10 | POS | Chrysotile | 5 | Good | 1,000 SF | Layer 1 - Brown Mottled Vinyl Stair Tread | Building 1A |
| M - Vinyl Floor Tile | Huntington-102709-1A-1-193 | Ground Level, Stairwell 10 | 2-10% | Chrysotile | 5 | Good | 100 SF | Layer 1 - 12" x 12" Brown Floor Tile with White Streaks | Building 1A |
| M - Vinyl Floor Tile | Huntington-102709-1A-1-194 | Ground Level, Stairwell 10 | POS | Chrysotile | 5 | Good | 100 SF | Layer 1 - 12" x 12" Brown Floor Tile with White Streaks | Building 1A |
| M - Asphalt Roof Shingle | PACM - Not Sampled | N/A | POS | N/A | 5 | Good | 8,000 SF | Exterior Roofing Materials | Building 1A |
| M - Mastic Coating on Surface | PACM - Not Sampled | N/A | POS | N/A | 5 | Good | N/A | Miscellaneous Wall/Ceiling Mastics | Building 1A |
| M - Fire Doors | PACM - Not Sampled | N/A | POS | N/A | 5 | Good | N/A | Fire Doors | Building 1A |
| M - Elevator Brake Shoes | PACM - Not Sampled | N/A | POS | N/A | 5 | Good | One Elevator Cab | Brake Systems for Elevators | Building 1A |
| M - Other, Not Listed (add description) | PACM - Not Sampled | N/A | POS | N/A | 5 | Good | N/A | Miscellaneous Packings and Gaskets | Building 1A |
| M - Vinyl Floor Tile | PACM - Not Sampled | N/A | POS | N/A | 5 | Good | N/A | Multi-colored vinyl floor tiles (12”x12”) being utilized for directional purposes (i.e., arrows, etc.) | Building 1A |
| M - Floor Tile Mastic | PACM - Not Sampled | N/A | POS | N/A | 5 | Good | N/A | Mastic assoc. w/ multi-colored vinyl floor tiles (12”x12”) and the associated black mastic being utilized for directional purposes (i.e., arrows, etc.) | Building 1A |
| T - Pipe Insulation (Fittings, Elbows, Runs) | PACM - Not Sampled | N/A | POS | N/A | 5 | Good | N/A | Pipe Joint Insulation Compounds are presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 1A |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | PACM - Not Sampled | N/A | POS | N/A | 5 | Good | N/A | Pipe Insulation is Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 1A |
| T - Pipe Insulation (Fittings, Elbows, Runs) | PACM - Not Sampled | N/A | POS | N/A | 5 | Good | N/A | This remnant asbestos material is assumed to exist within the crawlspace of the building. | Building 1A |
| M - Mastic Coating on Surface | Huntington-0100109-1W-3-44 | Hallway Outside Room 3C150 | 2-10% | Chrysotile | 5 | Good | 25,000 SF | Layer 2 - Black Mastic Under 12" x 12" Brown Mottled Vinyl Floor Tile | Building 1W |
| M - Mastic Coating on Surface | Huntington-0100109-1W-3-45 | Hallway Outside Room 3C158 | POS | N/A | 5 | Good | N/A | Layer 2 - Black Mastic Under 12" x 12" Brown Mottled Vinyl Floor Tile | Building 1W |
| M - Carpet Glue/Mastic | Huntington-0100109-1W-3-48 | Room 3C143 | <1.0% | Chrysotile | N/A | Good | N/A | Yellow Carpet Mastic | Building 1W |
| M - Vinyl Floor Tile | Huntington-0100109-1W-G-80 | Room GC136 | 2-10% | Chrysotile | 5 | Good | 250 SF | Layer 1 - 12" x 12" Beige Vinyl Floor Tile with Brown Streaks | Building 1W |
| M - Vinyl Floor Tile | Huntington-0100109-1W-G-81 | Room GC136 | POS | N/A | 5 | Good | N/A | Layer 1 - 12" x 12" Beige Vinyl Floor Tile with Brown Streaks | Building 1W |
| M - Fire Doors | Not Sampled | N/A | POS | N/A | 5 | Good | Not Quantified | Fire Doors Assumed to be ACM | Building 1W |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | Not Sampled | N/A | POS | N/A | 1 | Significantly Damaged | 6,494 SF | Asbestos Debris in Floor of Crawlspace Encased Under Concrete | Building 1W |
| M - Asphalt Roof Shingle | Not Sampled | N/A | POS | N/A | 5 | Good | 10,000 SF | Exterior Roofing Materials | Building 1W |
| M - Mastic Coating on Surface | Not Sampled | N/A | POS | N/A | 5 | Good | Not Quantified | Miscellaneous Wall/Ceiling Mastics | Building 1W |
| M - Elevator Brake Shoes | Not Sampled | N/A | POS | N/A | 5 | Good | Two Elevator Cabs | Elevator Brake Systems are Assumed to Contain Asbestos Pads | Building 1W |
| M - Other, Not Listed (add description) | Not Sampled | N/A | POS | N/A | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets | Building 1W |
| T - Pipe Insulation (Fittings, Elbows, Runs) | Not Sampled | N/A | POS | N/A | 5 | Good | Not Quantified | Pipe Joint Insulation Compounds | Building 1W |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | Not Sampled | N/A | POS | N/A | 5 | Good | Not Quantified | Pipe Insulation | Building 1W |
| M - Fire Doors | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Fire Doors are Assumed to be Asbestos-Containing | Building 2 |
| S - Other, Not Listed (add description) | PACM - Not Sampled | N/A | POS | ND | 5 | Damaged | 875 SF | Aluminum Roof Coating is Presumed to be Asbestos-Containing | Building 2 |
| M - Mastic Coating on Surface | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Wall/Ceiling Mastics are Presumed to be Asbestos-Containing | Building 2 |
| M - Elevator Brake Shoes | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 1 Freight Elevator Cab | Brake Systems for Elevators are Presumed to have Asbestos-Containing Brqake Pads | Building 2 |
| M - Other, Not Listed (add description) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets are Presumed to be Asbestos-Containing | Building 2 |
| M - Floor Tile Mastic | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 5,648 SF | Black Floor Tile Mastic was Presumed to be Asbestos-Containing Based on Previous Sample Data | Building 2 |
| T - Pipe Insulation (Fittings, Elbows, Runs) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Previously Identified in the Facility, but not Observed by EFI. Remnants may still exist in Inaccessible Areas | Building 2 |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Previously Identified in the Facility, but not Observed by EFI. Remnants may still exist in Inaccessible Areas | Building 2 |
| M - Vinyl Floor Tile | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 5,648 SF | VFT was Presumed to be Asbestos-Containing Based on Previous Sample Data | Building 2 |
| S - Other, Not Listed (add description) | PACM - Not Sampled | N/A | POS | ND | 5 | Damaged | 875 SF | Aluminum Roof Coating is Presumed to be Asbestos-Containing | 2-3 Tunnels |
| M - Mastic Coating on Surface | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Wall/Ceiling Mastics are Presumed to be Asbestos-Containing | 2-3 Tunnels |
| M - Elevator Brake Shoes | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 1 Freight Elevator Cab | Brake Systems for Elevators are Presumed to have Asbestos-Containing Brake Pads | Building 3 |
| M - Other, Not Listed (add description) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets are Presumed to be Asbestos-Containing | Building 3 |
| M - Floor Tile Mastic | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 5,648 SF | Black Floor Tile Mastic was Presumed to be Asbestos-Containing Based on Previous Sample Data | Building 3 |
| T - Pipe Insulation (Fittings, Elbows, Runs) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Previously Identified in the Facility, but not Observed by EFI. Remnants may still exist in Inaccessible Areas | Building 3 |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Previously Identified in the Facility, but not Observed by EFI. Remnants may still exist in Inaccessible Areas | Building 4 |
| M - Vinyl Floor Tile | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 5,648 SF | VFT was Presumed to be Asbestos-Containing Based on Previous Sample Data | Building 4 |
| T - Pipe Insulation (Fittings, Elbows, Runs) | NA | Tunnel Between the Maintenance Building (Building #2) and the Boiler Plant Building (Building #3) | POS | Not Determined | 1 | Significantly Damaged | Not Quantified | Pipe Joint Insulation Compounds (PJIC) are presumed (based on previous reports and a visual inspection) to exist in various locations throughout the tunnel in pipe chases, above ceiling plenums and other in-accessible areas (i.e., chases, above ceilings, etc.) on active and abandoned pipe systems. These materials were identified to be in a significantly damaged condition. | Building 4 |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | NA | Tunnel Between the Maintenance Building (Building #2) and the Boiler Plant Building (Building #3) | POS | Not Determined | 1 | Significantly Damaged | Not Quantified | Pipe Insulation (PI) is presumed (based on previous asbestos reports and a visual inspection) to exist in various locations throughout the tunnel in pipe chases, above ceiling plenums and other in-accessible areas (i.e., chases, above ceilings, etc.) on active and abandoned pipe systems. These materials were identified to be in a significantly damaged condition. | Building 4 |
| M - Built-up Roofing | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 5,000 SF | Roof Surfacing Material is Presumed to be Asbestos-Containing | Building 4 |
| M - Mastic Coating on Surface | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Wall/Ceiling Mastics are Assumed to be Asbestos-Containing | Building 4 |
| M - Fire Doors | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Fire Doors Throughout the Facility are Presumed to be Asbestos-Containing | Building 4 |
| M - Other, Not Listed (add description) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets are Presumed to be Asbestos-Containing | Building 4 |
| M - Asphalt Roof Shingle | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 10,00 SF | Roof Shingles on Main Building are Presumed to be Asbestos-Containing | Building 4 |
| M - Mastic Coating on Surface | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Walll and Ceiling Mastics are Presumed to be Asbestos-Containing | Building 4 |
| M - Fire Doors | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Fire Doors Throughout the Facility are Presumed to be Asbestos-Containing | Building 4 |
| M - Elevator Brake Shoes | PACM - Not Sampled | N/A | POS | ND | 5 | Good | One Elevator Cab | Brake Systems for Elevators are Presumed to have Asbestos-Containing Brqake Pads | Building 5 |
| M - Other, Not Listed (add description) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets are Presumed to be Asbestos-Containing | Building 6 |
| M - Floor Tile Mastic | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 17,000 SF | The Black Floor Tile Mastic is Presumed to be Asbestos-Containing Based on Prior Sample Data | Building 6 |
| M - Vinyl Floor Tile | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 20,000 SF | Vinyl Floor Tiles were Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 6 |
| M - Joint Compound | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Joint Compound in one office and an adjacent wall in the Southwest Basement was Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 6 |
| T - Pipe Insulation (Fittings, Elbows, Runs) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Previously Identified in the facility, and is presumed to exist in various locations throughout the building | Building 6 |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Previously Identified in the facility, and is presumed to exist in various locations throughout the building | Building 6 |
| M - Other, Not Listed (add description) | PACM - Not Sampled | N/A | POS | ND | 1 | Sig. Damaged | Not Quantified | Assumed to exist in the Inaccessible Ground Level Debris Pit | Building 6 |
| M - Asphalt Roof Shingle | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 4,000 SF | Roofing Shingles and Associated Materials are Presumed to be Asbestos-Containing | Building 6 |
| M - Asphalt Roof Shingle | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 3,000 SF | Roof Shingles on Building are Presumed to be Asbestos-Containing | Building 6 |
| M - Mastic Coating on Surface | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Wall and Ceiling Mastics are Presumed to be Asbestos-Containing | Building 6 |
| M - Fire Doors | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Fire Doors Throughout the Facility are Presumed to be Asbestos-Containing | Building 6 |
| M - Other, Not Listed (add description) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets are Presumed to be Asbestos-Containing | Building 7 |
| M - Vinyl Floor Tile | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 600 SF | The Floor Tiles are Presumed to be Asbestos-Containing Based on Prior Sample Data | Building 7 |
| M - Floor Tile Mastic | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 600 SF | The Black Floor Tile Mastic is Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 7 |
| M - Floor Tile Mastic | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 100 SF | This Black Floor Tile Mastic is Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 7 |
| M - Vinyl Floor Tile | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 200 SF | The Floor Tiles are Presumed to be Asbestos-Containing Based on Prior Sample Data | Building 7 |
| M - Cove Base Mastic | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 160 LF | The Cove Base Mastic is Presumed to be Asbestos-Containing Based on Prior Sample Data | Building 7 |
| T - Pipe Insulation (Fittings, Elbows, Runs) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Previously Identified in the facility, and is presumed to exist in various locations throughout the building | Building 7 |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Previously Identified in the facility, and is presumed to exist in various locations throughout the building | Building 7 |
| M - Asphalt Roof Shingle | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 2,000 SF | Roof Shingles on Building are Presumed to be Asbestos-Containing | Building 7 |
| M - Mastic Coating on Surface | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Wall and Ceiling Mastics are Presumed to be Asbestos-Containing | Building 7 |
| M - Fire Doors | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Fire Doors Throughout the Facility are Presumed to be Asbestos-Containing | Building 8 |
| M - Other, Not Listed (add description) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets are Presumed to be Asbestos-Containing | Building 8 |
| M - Floor Tile Mastic | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 1,100 SF | The Black Floor Tile Mastic is Presumed to be Asbestos-Containing Based on Prior Sample Data | Building 8 |
| T - Mastic Coating on Thermal Pipe Jacket Cover | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Pipe Insulation Mastic is Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 8 |
| T - Pipe Insulation (Fittings, Elbows, Runs) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Previously Identified in the facility, and is presumed to exist in various locations throughout the building | Building 8 |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Previously Identified in the facility, and is presumed to exist in various locations throughout the building | Building 8 |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | PACM - Not Sampled | N/A | POS | ND | 1 | Damaged | Not Quantified | Residual Pipe Insulation is Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 8 |
| M - Vinyl Sheet Flooring | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 200 SF | The Linoleum is Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 8 |
| M - Asphalt Roof Shingle | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 1,500 SF | Roof Shingles on Building are Presumed to be Asbestos-Containing | Building 8 |
| M - Mastic Coating on Surface | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Wall and Ceiling Mastics are Presumed to be Asbestos-Containing | Building 8 |
| M - Fire Doors | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Fire Doors Throughout the Facility are Presumed to be Asbestos-Containing | Building 10 |
| M - Other, Not Listed (add description) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets are Presumed to be Asbestos-Containing | Building 12 |
| M - Vinyl Floor Tile | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 1,100 SF | These Floor Tiles are Presumed to be Asbestos-Containing Based on Prior Sample Data | Building 12 |
| M - Floor Tile Mastic | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 1,100 SF | The Black Floor Tile Mastic is Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 12 |
| M - Floor Tile Mastic | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 1,100 SF | The Black Floor Tile Mastic is Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 12 |
| M - Cove Base Mastic | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 1,380 LF | The Cove Base Mastic is Presumed to be Asbestos-Containing Based on Prior Sample Data | Building 12 |
| T - Pipe Insulation (Fittings, Elbows, Runs) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Pipe Joint insulation Compounds are Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 12 |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | The Pipe Insulation is Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 12 |
| M - Fire Brick | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Fire Bricks are Presumed to be Asbestos-Containing | Building 12 |
| M - Asphalt Roof Shingle | Not Sampled | N/A | POS | ND | 5 | Good | 9,000 SF | Exterior Roofing Materials | Building 12 |
| M - Mastic Coating on Surface | Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Wall/Ceiling Mastics | Building 12 |
| M - Fire Doors | Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Fire Doors Assumed to be ACM | Building 12 |
| M - Elevator Brake Shoes | Not Sampled | N/A | POS | ND | 5 | Good | One Elevator Cab | Elevator Brake Systems are Assumed to Contain Asbestos Pads | Building 12 |
| M - Other, Not Listed (add description) | Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets | Building 12 |
| M - Floor Tile Mastic | Not Sampled | N/A | POS | ND | 5 | Good | 2,000 SF | Black Floor Tile Mastic was found to be Asbestos-Containing by Previous Sampling | Building 15 |
| M - Vinyl Floor Tile | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 18,500 SF | These Floor Tiles are Presumed to be Asbestos-Containing Based on Prior Sample Data | Building 15 |
| M - Floor Tile Mastic | PACM - Not Sampled | N/A | POS | ND | 5 | Good | 18,500 SF | The Black Floor Tile Mastic is Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 16 |
| M - Cement Wallboard | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | The Cementitious Paneling is Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 16 |
| T - HVAC Duct Insulation | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | The Duct Insulation and Duct Wrap is Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 16 |
| T - Pipe Insulation (Fittings, Elbows, Runs) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | Pipe Joint insulation Compounds are Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 16 |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | PACM - Not Sampled | N/A | POS | ND | 5 | Good | Not Quantified | The Pipe Insulation is Presumed to be Asbestos-Containing Based on Prior Sampling Data | Building 23 |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | Not Sampled | N/A | POS | ND | 1 | Significantly Damaged | 8,617 SF | Asbestos Debris Presumed to be Present in Floor of Crawlspace Encased Under Concrete Based on Prior Sampling Data | Building 23 |
| M - Roofing Shingles | Identified in prior report. | NA | POS | ND | 5 | Good | 3,000 SF | Roofing Materials (i.e., roofing felt, tar, shingles, aluminum roof coating, roofing cement, etc.) were not sampled (at the request of the Health and Safety Officer for the Huntington, West Virginia Campus). Previous reports have identified the roofing cement found at each railing pitch pockets at the roof edge and the aluminum roof coating as asbestos-containing materials. | Building 23 |
| M - Fire Doors | Presumed | NA | POS | ND | 5 | Good | Not Quantified | Metal Fire Doors | Building 23 |
| M - Roofing Shingles | Presumed | NA | POS | Not Determined | 5 | Good | 700 SF | Roofing Materials (i.e., roofing felt, tar, shingles, etc.) were not sampled (at the request of the Health and Safety Officer for the Huntington, West Virginia Campus), therefore this material is presumed to be asbestos-containing. | Building 23 |
| M - Fire Doors | Presumed | NA | POS | Not Determined | 5 | Good | Not Quantified | Metal Fire Doors | Building 23 |
| M - Construction Mastics | Presumed | NA | POS | Not Determined | 5 | Good | Not Quantified | Miscellaneous Wall/Ceiling Mastics | Building 23 |
| M - Other, Not Listed (add description) | Presumed | NA | POS | Not Determined | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets related to the mechanical and plumbing systems. | Building 23 |
| T - Mastic Coating on Thermal Pipe Jacket Cover | Huntington-102809-23-PH-249 | Penthouse | 2-10% | Chrysotile | 5 | Good | Not Quantified | Layer 1 - White Endcap Mastic on Pipe Insulation | Building 23 |
| T - Mastic Coating on Thermal Pipe Jacket Cover | Huntington-102809-23-PH-250 | Penthouse | POS | Chrysotile | 5 | Good | Not Quantified | Layer 1 - White Endcap Mastic on Pipe Insulation | Building 23 |
| M - Floor Tile Mastic | Huntington-102809-23-2-265 | 2nd Floor Hallway | 2-10% | Chrysotile | N/A | Good | 25,500 SF | Layer 2 - Yellow and Black Floor Tile Mastic Associated with HA 10 | Building 23 |
| M - Floor Tile Mastic | Huntington-102809-23-2-266 | 2nd Floor Hallway | POS | Chrysotile | N/A | Good | 25,500 SF | Layer 2 - Yellow and Black Floor Tile Mastic Associated with HA 10 | Building 23 |
| M - Floor Tile Mastic | Huntington-102809-23-2-267 | 2nd Floor Hallway | POS | Chrysotile | N/A | Good | 25,500 SF | Layer 2 - Yellow and Black Floor Tile Mastic Associated with HA 10 | Building 23 |
| M - Floor Tile Mastic | Huntington-102809-23-2-268 | 2nd Floor Hallway | 2-10% | Chrysotile | N/A | Good | 25,500 SF | Layer 2 - Yellow and Black Floor Tile Mastic Associated with HA 12 | Building 23 |
| M - Floor Tile Mastic | Huntington-102809-23-2-269 | 2nd Floor Hallway | POS | Chrysotile | N/A | Good | 25,500 SF | Layer 2 - Yellow and Black Floor Tile Mastic Associated with HA 12 | Building 23 |
| M - Floor Tile Mastic | Huntington-102809-23-2-270 | 2nd Floor Hallway | POS | Chrysotile | N/A | Good | 25,500 SF | Layer 2 - Yellow and Black Floor Tile Mastic Associated with HA 12 | Building 23 |
| M - Asphalt Roof Shingle | Not Sampled | N/A | POS | Not Determined | 5 | Good | 18,000 SF | Exterior Roofing Materials | Building 25 |
| M - Mastic Coating on Surface | Not Sampled | N/A | POS | Not Determined | 5 | Good | Not Quantified | Miscellaneous Wall/Ceiling Mastics | Building 25 |
| M - Fire Doors | Not Sampled | N/A | POS | Not Determined | 5 | Good | Not Quantified | Fire Doors Assumed to be ACM | Building 25 |
| M - Elevator Brake Shoes | Not Sampled | N/A | POS | Not Determined | 5 | Good | Two Elevator Cabs | Elevator Brake Systems are Assumed to Contain Asbestos Pads | Building 25 |
| M - Other, Not Listed (add description) | Not Sampled | N/A | POS | Not Determined | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets | Building 26 |
| M - Laboratory Hoods/Table Tops | Not Sampled | N/A | POS | Not Determined | 5 | Good | Not Quantified | Laboratory Fume Hoods | Building 26 |
| M - Vinyl Floor Tile | Not Sampled | N/A | POS | Not Determined | 5 | Good | 100 SF | 12" x 12" Brown Vinyl Floor Tiles with Black and Orange Streaks | Building 26 |
| M - Floor Tile Mastic | Not Sampled | N/A | POS | Not Determined | 5 | Good | 100 SF | Black Floor Tile Mastic Associated with HA 35 | Building 26 |
| M - Roofing Shingles | Presumed | NA | POS | Not Determined | 5 | Good | 500 SF | Roofing Materials (i.e., roofing felt, tar, shingles, etc.) were not sampled (at the request of the Health and Safety Officer for the Huntington, West Virginia Campus), therefore this material is presumed to be asbestos-containing. | Building 27 |
| M - Fire Doors | Presumed | NA | POS | Not Determined | 5 | Good | 38 Doors | Metal Fire Doors and Elevator Doors | Building 27 |
| M - Construction Mastics | Presumed | NA | POS | Not Determined | 5 | Good | Not Quantified | Miscellaneous Wall/Ceiling Mastics | Building 27 |
| M - Elevator Brake Shoes | Presumed | NA | POS | Not Determined | 5 | Good | Two Elevator Cabs | Elevator Brake Systems are presumed to exist throughout the building. Since this material was unable to be confirmed due to the excessive amount of damage that would be caused to confirm or deny this material, this material is presumed to contain asbestos, until sampling warrants otherwise. | Building 34 |
| M - Asphalt Roof Shingle | Not Sampled | N/A | POS | Not Determined | 5 | Good | 1,300 SF | Exterior Roofing Materials | Building 34 |
| M - Mastic Coating on Surface | Not Sampled | N/A | POS | Not Determined | 5 | Good | Not Quantified | Miscellaneous Wall/Ceiling Mastics | Building 34 |
| M - Fire Doors | Not Sampled | N/A | POS | Not Determined | 5 | Good | 1 Door | Fire Doors Assumed to be ACM | Building 34 |
| M - Other, Not Listed (add description) | Not Sampled | N/A | POS | Not Determined | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets | Building 34 |
| M - Asphalt Roof Shingle | Not Sampled | N/A | POS | Not Determined | 5 | Good | 200 SF | Exterior Roofing Materials | Building 34 |
| M - Fire Doors | Not Sampled | N/A | POS | Not Determined | 5 | Good | 1 Door | Fire Doors Assumed to be ACM | Building 34 |
| M - Other, Not Listed (add description) | Not Sampled | N/A | POS | Not Determined | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets | Building 34 |
| M - Vinyl Floor Tile | Huntington-093009-34-01-04 | 1st Floor Office | 2-10% | Chrysotile | 5 | Good | 288 SF | Layer 1 - 12" x 12" White Vinyl Floor Tiles with Grey Streaks | Building 34 |
| M - Floor Tile Mastic | Huntington-093009-34-01-04 | 1st Floor Office | <1.0% | Chrysotile | N/A | Good | N/A | Layer 2 - Black Floor Tile Mastic Associated with HA 2 | Building 34 |
| M - Vinyl Floor Tile | Huntington-093009-34-01-05 | 1st Floor Office | 2-10% | Chrysotile | 5 | Good | 288 SF | Layer 1 - 12" x 12" White Vinyl Floor Tiles with Grey Streaks | Building 34 |
| M - Floor Tile Mastic | Huntington-093009-34-01-05 | 1st Floor Office | <1.0% | Chrysotile | N/A | Good | N/A | Layer 2 - Black Floor Tile Mastic Associated with HA 2 | Building 34 |
| M - Vinyl Floor Tile | Huntington-093009-34-01-06 | 1st Floor Office | 2-10% | Chrysotile | 5 | Good | 288 SF | Layer 1 - 12" x 12" White Vinyl Floor Tiles with Grey Streaks | Tunnels |
| M - Floor Tile Mastic | Huntington-093009-34-01-06 | 1st Floor Office | <1.0% | Chrysotile | N/A | Good | N/A | Layer 2 - Black Floor Tile Mastic Associated with HA 2 | Tunnels |
| M - Caulking/Putties | Huntington-093009-34-01-09 | Exterior | <1.0% | Chrysotile | N/A | Good | N/A | White Exterior Window Caulking | |
| M - Caulking/Putties | Huntington-093009-34-01-10 | Exterior | <1.0% | Chrysotile | N/A | Good | N/A | White Exterior Window Caulking | |
| M - Built-up Roofing | Not Sampled | N/A | POS | Not Determined | 5 | Good | 2,240 SF | Exterior Roofing Materials | |
| M - Mastic Coating on Surface | Not Sampled | N/A | POS | Not Determined | 5 | Good | Not Quantified | Miscellaneous Wall/Ceiling Mastics | |
| M - Fire Doors | Not Sampled | N/A | POS | Not Determined | 5 | Good | Not Quantified | Fire Doors Assumed to be ACM | |
| M - Other, Not Listed (add description) | Not Sampled | N/A | POS | Not Determined | 5 | Good | Not Quantified | Miscellaneous Packings and Gaskets | |
| T - Pipe Insulation (Fittings, Elbows, Runs) | PACM - Not Sampled | N/A | POS | Not Determined | 1 | Damaged | Not Quantified | Pipe Joint insulation Compounds are Presumed to be Asbestos-Containing Based on Prior Sampling Data | |
| T - Pipe Insulation (Corrugated Air-Cell, Block, etc.) | PACM - Not Sampled | N/A | POS | Not Determined | 1 | Damaged | Not Quantified | The Pipe Insulation is Presumed to be Asbestos-Containing Based on Prior Sampling Data |
File details come from the government source that posted it. Updated .