Atch_20_-_Sample_Project_AF_Form_3052_-_1_Jun_15.xlsx

Air Force Form Jun 1, 2015 XLSX spreadsheet 26 KB Posted

Attached to
MACC-FOUR-POINT-OH - FA4690-15-R-0005, Solicitation
Solicitation number
FA4690-15-R-0005
Issued by

About this file

Atch 20 - Sample Project AF Form 3052 - 1 Jun 15

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
FA4690-15-R-0005_Amend_0002.pdf PDF
Atch_18_-_Sample_Project_GIPR_-_19_Jan_16.docx DOCX document
Amend_2_-_Addl_Questions.docx DOCX document
Amend_1_-_Site_Visit_Minutes.pdf PDF
FA4690-15-R-0005_Amend_01_MACC-FOUR-POINT-OH.pdf PDF
Atch_18_-_Sample_Project_GIPR_-_13_Jan_16.docx DOCX document
Atch_16c_-_Wage_Determination_SD1-_Heavy-Highway_-_SD_-_9_Oct_15.docx DOCX document
Atch_15_Non-Nuclear_Intrusion_Detection_-_22_Sep_14.pdf PDF
Atch_18_-_Sample_Project_GIPR_-_1_Jun_15.docx DOCX document
Atch_4_Sepc_Section_01000_-_20_Aug_15.doc DOC document
Atch_10__Electrical_Systems_-_15_Jan_15.pdf PDF
Atch_25_Pricing_Matrix_for_Evaluation_of_Options_-_17_Dec_15.xlsx XLSX spreadsheet
Atch_12_General_Provisions_-_10_Feb_15.doc DOC document
Atch_16e_-_Wage_Determination_SD35_-_Building_-_Penn_-_31_Jul_15.docx DOCX document
Atch_3_Submittal_Schedule_-_20_Aug_15.xls XLS spreadsheet
Atch_9_Material_Approval_Submittal_Form_3000_-_1_Sep_03.xfd —
Atch_8_Exterior_Signs_-_10_Jun_05.pdf PDF
Atch_14_Contractor_Guide_-_16_Jun_15.doc DOC document
Atch_1_Utility_Outages.doc DOC document
Atch_23_Historical_Data_-_21_Aug_2015.xls XLS spreadsheet
Atch_16a_-_Wage_Determination_SD2_-_Residential_-_Penn_-_2_Jan_15.docx DOCX document
Atch_21_1_of_3_Sample_Project_Drawing_-_1_Jun_15.pdf PDF
Atch_16d_-_Wage_Determination_SD33_-_Building_-_Mead_-_31_Jul_15.docx DOCX document
Atch_11_Ellsworth_AFB_Underground_Electrical_Rqmts_-_20_Aug_15.pdf PDF
Atch_22_Past_Performance_Questionnaire_-_25_Aug_15.doc DOC document
Atch_21_2_of_3_Sample_Project_Drawings_-_1_Jun_15.pdf PDF
Atch_21_3_of_3_Sample_Project_Drawing_-_1_Jun_15.pdf PDF
Atch_24_Determination_of_Responsibility_-_9_Dec_15.doc DOC document
Atch_17_-_Sample_Project_SOW_-_1_Jun_15.docx DOCX document
Atch_13_NAF_General_Provisions_-_21_Jan_2015.docx DOCX document
Atch_19_-_Sample_Project_Contractor_Bid_Sched_-_1_Jun_15.doc DOC document
Atch_16b_-_Wage_Determination_SD6_-_Residential_-_Mead_-_31_Jul_15.docx DOCX document
Atch_6_Design_Compatibility_Standards_-_20_Aug_15.pdf PDF
Atch_2_AF_Form_103_Work__BCE_Clearance_Request_-_1_Aug_94.xfdl XFDL file
Atch_7_Ellsworth_AFB_Fire_Protection_Standards_-_20_Aug_15.pdf PDF
Atch_21_2_of_3_Sample_Project_Drawings_-_1_Jun_15.pdf PDF
Atch_6_Design_Compatibility_Standards.pdf PDF
Atch_22_Past_Performance_Questionnaire_-_25_Aug_15.doc DOC document
Atch_24_Determination_of_Responsibility_-9_March_2012.doc DOC document
Atch_14_Contractor_Guide_-_16_Jun_15.doc DOC document
Atch_16c_-_Wage_Determination_SD1_-_Heavy_ _Highway_-_SD.docx DOCX document
Atch_16d_-_Wage_Determination_SD33_-_Building_-_Mead.docx DOCX document
Atch_2_AF_Form_103_Work__BCE_Clearance_Request.xfdl XFDL file
Atch_18_-_Sample_Project_GIPR_-_31_Jan_11.docx DOCX document
Atch_11_Ellsworth_AFB_Underground_Electrical_Rqmts.pdf PDF
Atch_21_3_of_3_Sample_Project_Drawing_-_1_Jun_15.pdf PDF
Atch_23_Historical_Data_-_21_Aug_2015.xls XLS spreadsheet
Atch_17_-_Sample_Project_SOW.docx DOCX document
Atch_13_NAF_General_Provisions_-_21_Jan_2015.docx DOCX document
Atch_3_Submittal_Schedule.xls XLS spreadsheet
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER

CONSTRUCTION COST ESTIMATE BREAKDOWNAttach 20
CONTRACTORADDRESSPage 1 of 2
1-Jun-15
CONTRACT FOR:PROPOSED TOTAL CONTRACT PRICE
MACC Sample Project
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
FXBM 01-1000Ellsworth AFB, SD Bld'g 5025
LINE #ITEMUNIT OF MEASURE (2)QTY (3)UNITTOTALMAN HOUR\ DAYSAVG RATETOTALOTHER DIRECT COSTSLINE TOTAL
1General Conditions$0.00$0.00$0.00
2Investigative Services$0.00$0.00$0.00
3Design Services$0.00$0.00$0.00
4Site Demolition$0.00$0.00$0.00
5Building Demolition$0.00$0.00$0.00
6Site Utilities$0.00$0.00$0.00
7Excavation and Backfill$0.00$0.00$0.00
8Cast-in-place Concrete$0.00$0.00$0.00
9Paving$0.00$0.00$0.00
10Landscaping$0.00$0.00$0.00
11Masonry$0.00$0.00$0.00
12Struct Steel & Metal Decking$0.00$0.00$0.00
13Roofing$0.00$0.00$0.00
14Insulation$0.00$0.00$0.00
15Specialities$0.00$0.00$0.00
16Finishes$0.00$0.00$0.00
17Doors$0.00$0.00$0.00
18Electrical$0.00$0.00$0.00
19Mechanical$0.00$0.00$0.00
20Fire Detection & Suppression$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
Page Totals$0.00$0.00

&"MS Sans Serif,Bold"&6AF Form 3052 JAN 88 (Computer Generated)

LABOR COST

MATERIAL COST

BACK

Attachment 20
Page 2 of 2

TOTAL MATERIAL COSTS $0.00

TOTAL LABOR COSTS $0.00

TOTAL OTHER DIRECT COSTS $0.00

TOTAL DIRECT COSTS $0.00

OVERHEAD $0.00

SUBTOTAL $0.00

PROFIT $0.00

TOTAL PRICE$0.00
DATEFIRM NAME
TITLE
(Signature)

INSTRUCTIONS FOR COMPLETING AF FORM 3052

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all costs

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples-squareyards-SY, cubic yards-CY, Square feet-SF, linear feet-LF, board feet-BF, each-EA, Pound-LB).

Col 3 Quantity. Contractors estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7, and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows.

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summery of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3-807.4)

2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of

a. The existing, verifiable data

b. The judgmental factors applied in projecting from known data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

(reverse of AF Form 3052, Jan 88 Computer Generated)