Sheet1
| Award Description | Total Cost |
| Renovate BDOC B4400 | $156,600.00 |
| K, Rpr Airfield Pave Markings | $157,777.00 |
| Fitness Center Indoor Track | $165,192.00 |
| B, FY12 Replace Hangar Door Seals South Docks | $169,473.00 |
| Repair Airfield Pavement Markings | $176,800.00 |
| B, CA, Repair CATM Water Loop | $179,888.23 |
| Replace Deep Well Turbine Pumps | $184,257.00 |
| DO Repair Blast Booth DK 92 | $192,000.00 |
| B-FY13-CES; Maintain Water S | $202,068.00 |
| B, FAMCAMP Expansion, Phase II | $205,516.00 |
| B-FY14-CDC Playground Equip- 11-D-1005-5402 | $208,197.75 |
| B, NAF ADAL Golf Course Irrigation | $209,272.50 |
| B FY13 Repair DRMO FAC | $236,897.00 |
| K, FY11, NAF Repair Mens Locker Room | $240,818.00 |
| B-FY13-28 CES, Install CATM Sound Attenuation | $246,595.00 |
| Multi Use Park | $275,300.00 |
| 12- Rpr Hangar Tail Door Seals | $277,000.00 |
| FAMCAMP Expansion - Phase III | $291,462.88 |
| K, FY11 Repair Floor Systems Dock 70/73 | $299,338.00 |
| B, EOY Rpr AntiSkid Floor, Dock 71 | $301,209.63 |
| K, Rpr Parking Lot 4 Locations | $310,034.00 |
| Repair Air Field Paint | $317,015.53 |
| K, Airfield Pavement Markings | $322,000.00 |
| K, Maintain Pave Paint Fac 1/3920/4022/12701 | $352,868.00 |
| B-FY12-CES; Repair Kitchens in Dorms (4) | $359,229.00 |
| B, Repair Center Line and Taxiway Cans | $372,147.00 |
| K, SB-B Repair Perimeter Fence | $374,410.00 |
| B, FY13 Repair Back Flow Prevention Devices | $397,300.00 |
| Repair Fire Suppression Dock 71 | $476,269.77 |
| B-12-CES, Rpr Anti Slip Floor Coverng | $513,023.47 |
| Rpr Drainage Areas Phase 6 | $567,042.50 |
| Rpr Sewer (Sub Basin 1, 2, and 3) | $581,495.00 |
| 11-D-1008-5202 Repair Fitness Center Interior | $620,325.00 |
| K, SB-B Construct Alternate Water Supply | $638,380.00 |
| B, Repair Water Leaks | $641,666.47 |
| Repair CDC Flooring-Walls-PG | $658,380.00 |
| B, CA, Rpr Fire Protection OG HQ 7918 | $670,500.00 |
| K, Rpr Dock Waterlines 60 Row | $740,675.00 |
| 11-D-1008-5302, Rpr Sewer System Sub-Basin 3 | $741,251.00 |
| B, FY14, Install Exhaust System Bldg 100 | $771,491.54 |
| 11-D-1005-5106 Repair Sanitary Sewer Mains | $892,000.00 |
| B, Rpr Fire Suppression Systems Mult Docks | $901,332.00 |
| B-FY14-CES-11-D-1005-5405; M | $934,098.00 |
| B, Repair I&I Sanitary Sewer Main | $959,157.00 |
| Construct PMATS Bldg 6010/43 | $1,106,700.00 |
| K, Rpr Airfield Lighting Distribution | $1,207,100.00 |
| B-FY13,Repair S Dock/Ryan water lines | $1,245,935.00 |
| B, SB-B, Rpr Elec Distro MUNS Area | $1,326,610.00 |
| Repair PMATS Bldg 1011 | $1,613,850.00 |
| B, Repair 70-80-90 Row Parking Spots | $1,784,242.00 |
| K, SB-B Rpr Gas Valves Ph3 | $2,225,156.00 |