Atch_14_Contractor_Guide_-_16_Jun_15.doc

DOC document 52 KB Posted

Attached to
MACC-FOUR-POINT-OH - FA4690-15-R-0005, Solicitation
Solicitation number
FA4690-15-R-0005
Issued by

About this file

Atch 14 Contractor Guide - 16 Jun 15

View the file

Other files

File Type Posted
FA4690-15-R-0005_Amend_0002.pdf PDF
Atch_18_-_Sample_Project_GIPR_-_19_Jan_16.docx DOCX document
Amend_2_-_Addl_Questions.docx DOCX document
Amend_1_-_Site_Visit_Minutes.pdf PDF
FA4690-15-R-0005_Amend_01_MACC-FOUR-POINT-OH.pdf PDF
Atch_18_-_Sample_Project_GIPR_-_13_Jan_16.docx DOCX document
Atch_16c_-_Wage_Determination_SD1-_Heavy-Highway_-_SD_-_9_Oct_15.docx DOCX document
Atch_15_Non-Nuclear_Intrusion_Detection_-_22_Sep_14.pdf PDF
Atch_18_-_Sample_Project_GIPR_-_1_Jun_15.docx DOCX document
Atch_20_-_Sample_Project_AF_Form_3052_-_1_Jun_15.xlsx XLSX spreadsheet
Atch_4_Sepc_Section_01000_-_20_Aug_15.doc DOC document
Atch_10__Electrical_Systems_-_15_Jan_15.pdf PDF
Atch_25_Pricing_Matrix_for_Evaluation_of_Options_-_17_Dec_15.xlsx XLSX spreadsheet
Atch_12_General_Provisions_-_10_Feb_15.doc DOC document
Atch_16e_-_Wage_Determination_SD35_-_Building_-_Penn_-_31_Jul_15.docx DOCX document
Atch_3_Submittal_Schedule_-_20_Aug_15.xls XLS spreadsheet
Atch_9_Material_Approval_Submittal_Form_3000_-_1_Sep_03.xfd —
Atch_8_Exterior_Signs_-_10_Jun_05.pdf PDF
Atch_1_Utility_Outages.doc DOC document
Atch_23_Historical_Data_-_21_Aug_2015.xls XLS spreadsheet
Atch_16a_-_Wage_Determination_SD2_-_Residential_-_Penn_-_2_Jan_15.docx DOCX document
Atch_21_1_of_3_Sample_Project_Drawing_-_1_Jun_15.pdf PDF
Atch_16d_-_Wage_Determination_SD33_-_Building_-_Mead_-_31_Jul_15.docx DOCX document
Atch_11_Ellsworth_AFB_Underground_Electrical_Rqmts_-_20_Aug_15.pdf PDF
Atch_22_Past_Performance_Questionnaire_-_25_Aug_15.doc DOC document
Atch_21_2_of_3_Sample_Project_Drawings_-_1_Jun_15.pdf PDF
Atch_21_3_of_3_Sample_Project_Drawing_-_1_Jun_15.pdf PDF
Atch_24_Determination_of_Responsibility_-_9_Dec_15.doc DOC document
Atch_17_-_Sample_Project_SOW_-_1_Jun_15.docx DOCX document
Atch_13_NAF_General_Provisions_-_21_Jan_2015.docx DOCX document
Atch_19_-_Sample_Project_Contractor_Bid_Sched_-_1_Jun_15.doc DOC document
Atch_16b_-_Wage_Determination_SD6_-_Residential_-_Mead_-_31_Jul_15.docx DOCX document
Atch_6_Design_Compatibility_Standards_-_20_Aug_15.pdf PDF
Atch_2_AF_Form_103_Work__BCE_Clearance_Request_-_1_Aug_94.xfdl XFDL file
Atch_7_Ellsworth_AFB_Fire_Protection_Standards_-_20_Aug_15.pdf PDF
Atch_21_2_of_3_Sample_Project_Drawings_-_1_Jun_15.pdf PDF
Atch_6_Design_Compatibility_Standards.pdf PDF
Atch_22_Past_Performance_Questionnaire_-_25_Aug_15.doc DOC document
Atch_24_Determination_of_Responsibility_-9_March_2012.doc DOC document
Atch_14_Contractor_Guide_-_16_Jun_15.doc DOC document
Atch_16c_-_Wage_Determination_SD1_-_Heavy_ _Highway_-_SD.docx DOCX document
Atch_16d_-_Wage_Determination_SD33_-_Building_-_Mead.docx DOCX document
Atch_2_AF_Form_103_Work__BCE_Clearance_Request.xfdl XFDL file
Atch_18_-_Sample_Project_GIPR_-_31_Jan_11.docx DOCX document
Atch_11_Ellsworth_AFB_Underground_Electrical_Rqmts.pdf PDF
Atch_21_3_of_3_Sample_Project_Drawing_-_1_Jun_15.pdf PDF
Atch_23_Historical_Data_-_21_Aug_2015.xls XLS spreadsheet
Atch_17_-_Sample_Project_SOW.docx DOCX document
Atch_13_NAF_General_Provisions_-_21_Jan_2015.docx DOCX document
Atch_3_Submittal_Schedule.xls XLS spreadsheet
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor’s Guide Items Submitted for Construction Projects 16 Jun 15 Ellsworth AFB SD A. The following items are to be submitted to the base contracting office (as required) Located in the lower level, north end of the Rushmore Center

Mail address: 28 CONS/LGCB

1000 Ellsworth Street, Suite 1200

Ellsworth AFB, SD 57706 - 4904

1. Questions regarding the IFB or RFP package

2. Bids or proposals in response to IFB or RFP

3. Signed contract / delivery order

4. SF 1413 (Sub-contractor statement and acknowledgement)

5. Bonds and proof of insurance

6. Acknowledgement of NTP for interim stages of design (Design-Build; D-B)

7. Interim and final design packages (D-B)

8. Proposed change of scope during design or construction (D-B)

9. Progress schedule (if construction period exceeds 60 calendar days & cost is over $150K)

10. Payroll reports

11. Requests for airfield access

12. IEAL (Installation Entry Authorization List) approval request

13. Request for final inspection

14. Personnel and vehicle passes at the project conclusion

B. The following items are to be submitted to the base civil engineering office (as required)

Located in the Engineering Building

Mail address: 28 CES/CEPM 2125 Scott Drive

Ellsworth AFB, SD 57706 - 4711

1. Requests for clarification of requirements during design or construction (D-B)

2. Submittals - material, equipment, and test results

3. Draft copy of progress report for review prior to submitting with invoice in WAWF

4. Technical or logistical questions during construction

5. As-built drawings (draft and final)

6. Completed Real Property Checklist (Form 1354)

7. O & M Manuals The following are to be submitted to both the contracting office and the civil engineering office

1. Work start notification

2. Copy of completed “digging permit”

Other: Invoices – submit via Wide Area Work Flow (WAWF) Guide for Applying the 6 Percent Limit on Design Fee The portion of the contract price for A-E services for the preparation of designs, plans, drawings and specifications may not exceed 6 percent of the project's Estimated Construction Cost. This limitation is statutory (10 U.S.C. 4540(b), 7212, and 9540. The cost of preparation of plans and specifications is discussed in FAR 15.404-4(c)(4)(i)(B) and 36.606(a) and DFARS 236.606-70 .

The 6% fixed fee includes:

· Design development

· Working drawings & specifications

· Post design contract services (clarification drawings & specifications)

· Preparation of bid package including detailed estimate

· Drawings and specifications for demolition

· Travel related to preparation/approval of design documents with a pre set number of trips Exclusions to the Fixed Fee are:

· Pre-design programming

· Feasibility, functional, and economic studies

· Initial site visits

· Field, topographic, property, boundary, utility, and right-of-way surveys

· Subsurface explorations and borings, soils and materials testing, and resultant reports

· Flow gauging and model testing

· Reproduction of design documents for review purposes

· Preparation of construction cost estimates

· Comprehensive interior design (CID) services

· Preparation of general and feature design memoranda

· Models, renderings, or photographs of completed designs

· Construction-phase services

· Preparation or verification of as-built drawings during construction

· The services of consultants not specifically applied to the preparation of designs, plans, drawings, or specifications for a project

· Preparation of general and development criteria not specifically related to a military construction project

· Management and contract administration of A-E services contracts in connection with services excluded from the 6% limitation

· Document reproduction, travel, and per diem costs in connection with services excluded from the 6% limitation

· Preparation of environmental impact assessments, statements, and supporting data

FA4690-15-R-0005

Attachment 14

File details come from the government source that posted it. Updated .