Atch_23_Historical_Data_-_21_Aug_2015.xls

XLS spreadsheet 35 KB Posted

Attached to
MACC-FOUR-POINT-OH - FA4690-15-R-0005, Solicitation
Solicitation number
FA4690-15-R-0005
Issued by

About this file

Atch 23 Historical Data - 21 Aug 2015

View the file

Other files

File Type Posted
FA4690-15-R-0005_Amend_0002.pdf PDF
Atch_18_-_Sample_Project_GIPR_-_19_Jan_16.docx DOCX document
Amend_2_-_Addl_Questions.docx DOCX document
Amend_1_-_Site_Visit_Minutes.pdf PDF
FA4690-15-R-0005_Amend_01_MACC-FOUR-POINT-OH.pdf PDF
Atch_18_-_Sample_Project_GIPR_-_13_Jan_16.docx DOCX document
Atch_16c_-_Wage_Determination_SD1-_Heavy-Highway_-_SD_-_9_Oct_15.docx DOCX document
Atch_15_Non-Nuclear_Intrusion_Detection_-_22_Sep_14.pdf PDF
Atch_18_-_Sample_Project_GIPR_-_1_Jun_15.docx DOCX document
Atch_20_-_Sample_Project_AF_Form_3052_-_1_Jun_15.xlsx XLSX spreadsheet
Atch_4_Sepc_Section_01000_-_20_Aug_15.doc DOC document
Atch_10__Electrical_Systems_-_15_Jan_15.pdf PDF
Atch_25_Pricing_Matrix_for_Evaluation_of_Options_-_17_Dec_15.xlsx XLSX spreadsheet
Atch_12_General_Provisions_-_10_Feb_15.doc DOC document
Atch_16e_-_Wage_Determination_SD35_-_Building_-_Penn_-_31_Jul_15.docx DOCX document
Atch_3_Submittal_Schedule_-_20_Aug_15.xls XLS spreadsheet
Atch_9_Material_Approval_Submittal_Form_3000_-_1_Sep_03.xfd —
Atch_8_Exterior_Signs_-_10_Jun_05.pdf PDF
Atch_14_Contractor_Guide_-_16_Jun_15.doc DOC document
Atch_1_Utility_Outages.doc DOC document
Atch_23_Historical_Data_-_21_Aug_2015.xls XLS spreadsheet
Atch_16a_-_Wage_Determination_SD2_-_Residential_-_Penn_-_2_Jan_15.docx DOCX document
Atch_21_1_of_3_Sample_Project_Drawing_-_1_Jun_15.pdf PDF
Atch_16d_-_Wage_Determination_SD33_-_Building_-_Mead_-_31_Jul_15.docx DOCX document
Atch_11_Ellsworth_AFB_Underground_Electrical_Rqmts_-_20_Aug_15.pdf PDF
Atch_22_Past_Performance_Questionnaire_-_25_Aug_15.doc DOC document
Atch_21_2_of_3_Sample_Project_Drawings_-_1_Jun_15.pdf PDF
Atch_21_3_of_3_Sample_Project_Drawing_-_1_Jun_15.pdf PDF
Atch_24_Determination_of_Responsibility_-_9_Dec_15.doc DOC document
Atch_17_-_Sample_Project_SOW_-_1_Jun_15.docx DOCX document
Atch_13_NAF_General_Provisions_-_21_Jan_2015.docx DOCX document
Atch_19_-_Sample_Project_Contractor_Bid_Sched_-_1_Jun_15.doc DOC document
Atch_16b_-_Wage_Determination_SD6_-_Residential_-_Mead_-_31_Jul_15.docx DOCX document
Atch_6_Design_Compatibility_Standards_-_20_Aug_15.pdf PDF
Atch_2_AF_Form_103_Work__BCE_Clearance_Request_-_1_Aug_94.xfdl XFDL file
Atch_7_Ellsworth_AFB_Fire_Protection_Standards_-_20_Aug_15.pdf PDF
Atch_21_2_of_3_Sample_Project_Drawings_-_1_Jun_15.pdf PDF
Atch_6_Design_Compatibility_Standards.pdf PDF
Atch_22_Past_Performance_Questionnaire_-_25_Aug_15.doc DOC document
Atch_24_Determination_of_Responsibility_-9_March_2012.doc DOC document
Atch_14_Contractor_Guide_-_16_Jun_15.doc DOC document
Atch_16c_-_Wage_Determination_SD1_-_Heavy_ _Highway_-_SD.docx DOCX document
Atch_16d_-_Wage_Determination_SD33_-_Building_-_Mead.docx DOCX document
Atch_2_AF_Form_103_Work__BCE_Clearance_Request.xfdl XFDL file
Atch_18_-_Sample_Project_GIPR_-_31_Jan_11.docx DOCX document
Atch_11_Ellsworth_AFB_Underground_Electrical_Rqmts.pdf PDF
Atch_21_3_of_3_Sample_Project_Drawing_-_1_Jun_15.pdf PDF
Atch_17_-_Sample_Project_SOW.docx DOCX document
Atch_13_NAF_General_Provisions_-_21_Jan_2015.docx DOCX document
Atch_3_Submittal_Schedule.xls XLS spreadsheet
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Award DescriptionTotal Cost
Renovate BDOC B4400$156,600.00
K, Rpr Airfield Pave Markings$157,777.00
Fitness Center Indoor Track$165,192.00
B, FY12 Replace Hangar Door Seals South Docks$169,473.00
Repair Airfield Pavement Markings$176,800.00
B, CA, Repair CATM Water Loop$179,888.23
Replace Deep Well Turbine Pumps$184,257.00
DO Repair Blast Booth DK 92$192,000.00
B-FY13-CES; Maintain Water S$202,068.00
B, FAMCAMP Expansion, Phase II$205,516.00
B-FY14-CDC Playground Equip- 11-D-1005-5402$208,197.75
B, NAF ADAL Golf Course Irrigation$209,272.50
B FY13 Repair DRMO FAC$236,897.00
K, FY11, NAF Repair Mens Locker Room$240,818.00
B-FY13-28 CES, Install CATM Sound Attenuation$246,595.00
Multi Use Park$275,300.00
12- Rpr Hangar Tail Door Seals$277,000.00
FAMCAMP Expansion - Phase III$291,462.88
K, FY11 Repair Floor Systems Dock 70/73$299,338.00
B, EOY Rpr AntiSkid Floor, Dock 71$301,209.63
K, Rpr Parking Lot 4 Locations$310,034.00
Repair Air Field Paint$317,015.53
K, Airfield Pavement Markings$322,000.00
K, Maintain Pave Paint Fac 1/3920/4022/12701$352,868.00
B-FY12-CES; Repair Kitchens in Dorms (4)$359,229.00
B, Repair Center Line and Taxiway Cans$372,147.00
K, SB-B Repair Perimeter Fence$374,410.00
B, FY13 Repair Back Flow Prevention Devices$397,300.00
Repair Fire Suppression Dock 71$476,269.77
B-12-CES, Rpr Anti Slip Floor Coverng$513,023.47
Rpr Drainage Areas Phase 6$567,042.50
Rpr Sewer (Sub Basin 1, 2, and 3)$581,495.00
11-D-1008-5202 Repair Fitness Center Interior$620,325.00
K, SB-B Construct Alternate Water Supply$638,380.00
B, Repair Water Leaks$641,666.47
Repair CDC Flooring-Walls-PG$658,380.00
B, CA, Rpr Fire Protection OG HQ 7918$670,500.00
K, Rpr Dock Waterlines 60 Row$740,675.00
11-D-1008-5302, Rpr Sewer System Sub-Basin 3$741,251.00
B, FY14, Install Exhaust System Bldg 100$771,491.54
11-D-1005-5106 Repair Sanitary Sewer Mains$892,000.00
B, Rpr Fire Suppression Systems Mult Docks$901,332.00
B-FY14-CES-11-D-1005-5405; M$934,098.00
B, Repair I&I Sanitary Sewer Main$959,157.00
Construct PMATS Bldg 6010/43$1,106,700.00
K, Rpr Airfield Lighting Distribution$1,207,100.00
B-FY13,Repair S Dock/Ryan water lines$1,245,935.00
B, SB-B, Rpr Elec Distro MUNS Area$1,326,610.00
Repair PMATS Bldg 1011$1,613,850.00
B, Repair 70-80-90 Row Parking Spots$1,784,242.00
K, SB-B Rpr Gas Valves Ph3$2,225,156.00

&C&"Times New Roman,Regular"&12Historical Data&R&"Times New Roman,Regular"&12FA4690-15-R-0005 Attachment 23

File details come from the government source that posted it. Updated .