Additional Questions and answers to solicitation

View the file

Other files

File Type Posted
FA4690-15-R-0005_Amend_0002.pdf PDF
Atch_18_-_Sample_Project_GIPR_-_19_Jan_16.docx DOCX document
Amend_1_-_Site_Visit_Minutes.pdf PDF
FA4690-15-R-0005_Amend_01_MACC-FOUR-POINT-OH.pdf PDF
Atch_18_-_Sample_Project_GIPR_-_13_Jan_16.docx DOCX document
Atch_16c_-_Wage_Determination_SD1-_Heavy-Highway_-_SD_-_9_Oct_15.docx DOCX document
Atch_15_Non-Nuclear_Intrusion_Detection_-_22_Sep_14.pdf PDF
Atch_18_-_Sample_Project_GIPR_-_1_Jun_15.docx DOCX document
Atch_20_-_Sample_Project_AF_Form_3052_-_1_Jun_15.xlsx XLSX spreadsheet
Atch_4_Sepc_Section_01000_-_20_Aug_15.doc DOC document
Atch_10__Electrical_Systems_-_15_Jan_15.pdf PDF
Atch_25_Pricing_Matrix_for_Evaluation_of_Options_-_17_Dec_15.xlsx XLSX spreadsheet
Atch_12_General_Provisions_-_10_Feb_15.doc DOC document
Atch_16e_-_Wage_Determination_SD35_-_Building_-_Penn_-_31_Jul_15.docx DOCX document
Atch_3_Submittal_Schedule_-_20_Aug_15.xls XLS spreadsheet
Atch_9_Material_Approval_Submittal_Form_3000_-_1_Sep_03.xfd —
Atch_8_Exterior_Signs_-_10_Jun_05.pdf PDF
Atch_14_Contractor_Guide_-_16_Jun_15.doc DOC document
Atch_1_Utility_Outages.doc DOC document
Atch_23_Historical_Data_-_21_Aug_2015.xls XLS spreadsheet
Atch_16a_-_Wage_Determination_SD2_-_Residential_-_Penn_-_2_Jan_15.docx DOCX document
Atch_21_1_of_3_Sample_Project_Drawing_-_1_Jun_15.pdf PDF
Atch_16d_-_Wage_Determination_SD33_-_Building_-_Mead_-_31_Jul_15.docx DOCX document
Atch_11_Ellsworth_AFB_Underground_Electrical_Rqmts_-_20_Aug_15.pdf PDF
Atch_22_Past_Performance_Questionnaire_-_25_Aug_15.doc DOC document
Atch_21_2_of_3_Sample_Project_Drawings_-_1_Jun_15.pdf PDF
Atch_21_3_of_3_Sample_Project_Drawing_-_1_Jun_15.pdf PDF
Atch_24_Determination_of_Responsibility_-_9_Dec_15.doc DOC document
Atch_17_-_Sample_Project_SOW_-_1_Jun_15.docx DOCX document
Atch_13_NAF_General_Provisions_-_21_Jan_2015.docx DOCX document
Atch_19_-_Sample_Project_Contractor_Bid_Sched_-_1_Jun_15.doc DOC document
Atch_16b_-_Wage_Determination_SD6_-_Residential_-_Mead_-_31_Jul_15.docx DOCX document
Atch_6_Design_Compatibility_Standards_-_20_Aug_15.pdf PDF
Atch_2_AF_Form_103_Work__BCE_Clearance_Request_-_1_Aug_94.xfdl XFDL file
Atch_7_Ellsworth_AFB_Fire_Protection_Standards_-_20_Aug_15.pdf PDF
Atch_21_2_of_3_Sample_Project_Drawings_-_1_Jun_15.pdf PDF
Atch_6_Design_Compatibility_Standards.pdf PDF
Atch_22_Past_Performance_Questionnaire_-_25_Aug_15.doc DOC document
Atch_24_Determination_of_Responsibility_-9_March_2012.doc DOC document
Atch_14_Contractor_Guide_-_16_Jun_15.doc DOC document
Atch_16c_-_Wage_Determination_SD1_-_Heavy_ _Highway_-_SD.docx DOCX document
Atch_16d_-_Wage_Determination_SD33_-_Building_-_Mead.docx DOCX document
Atch_2_AF_Form_103_Work__BCE_Clearance_Request.xfdl XFDL file
Atch_18_-_Sample_Project_GIPR_-_31_Jan_11.docx DOCX document
Atch_11_Ellsworth_AFB_Underground_Electrical_Rqmts.pdf PDF
Atch_21_3_of_3_Sample_Project_Drawing_-_1_Jun_15.pdf PDF
Atch_23_Historical_Data_-_21_Aug_2015.xls XLS spreadsheet
Atch_17_-_Sample_Project_SOW.docx DOCX document
Atch_13_NAF_General_Provisions_-_21_Jan_2015.docx DOCX document
Atch_3_Submittal_Schedule.xls XLS spreadsheet
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

28TH CONTRACTING SQUADRON (AFGSC)

ELLSWORTH AIR FORCE BASE, SOUTH DAKOTA

19 January 2016

MEMORANDUM FOR MACC 4.0 OFFERORS

FROM: 28 CONS/LGCB

SUBJECT: Amendment 2, Additional Questions and Clarifications

1. This Amendment is the result of additional questions received after Amendment 1 distribution. The questions with answers and clarifications are listed as follows.

Question 1: Re: Q & A #8 from Amendment 1: The question and answer allude to a requirement to provide submittals for the steel bar joists and steel decking. This is not the requirement as described in paragraph 16 of the Sample Project GIPR. Paragraph 16 references the requirement for a Submittal Schedule (AF Form 66) with specific submittals “included” (in the schedule), as a minimum. The double asterisks following “A. Concrete mix design”, “B. Masonry units and mortar mix”, “E. Unit heaters and baseboard heaters”, and “F. Electrical panel” then further indicate the submittal items for which “submittal packages” are required as part of the sample project portion of the proposal. Based on this, can the original GIPR requirements be re-instated and clarification provided that the “submittals” identified in paragraph 16 (items “A” through “F”) are the minimums expected to be listed on the Submittal Schedule (AF Form 66) as stated and that only items “A”, “B”, “E”, and “F” require “submittal packages”? The current answer to this question appears to contradict the requirements as defined in paragraph 16.

Answer 1: The GIPR has been revised to reflect the following change. GIPR item #16 C. Bar Joists ** and GIPR item #16 D. Roof Decking **.

Question 2: Re: Paragraph 15 in Revised GIPR dated 13 Jan ’16: This paragraph was revised to require the Sample Project specifications to be provided “…in Unified Facilities Construction Standards (UFCS)” format in lieu of Master Spec short form as previously indicated. Are we correct in assuming that the requested format is actually Unified Facilities Guide Specifications (UFGS) as stated in paragraph 5.b. of the General Provisions? Also, since the UFGS is not a specification format typically used by many design professionals, and given the short timeframe for proposal preparation, can the more familiar Master Spec or SpecLink be allowed for preparation of the Sample Project only? Our team has already prepared some specification sections based on the Master Spec format initially required by the RFP and switching at this point would result in re-accomplishment of that effort.

Answer 2: For the purposes of evaluating the Sample Project, the use of Master Spec is allowed. However, after the MACC 4.0 awards have been completed and the contract is in effect, UFGS will only be utilized.

Question 3: Clarification regarding Past Performance consent letter, L-1.16.3.1. B.

Answer 3: The consent letter, referenced in the question 3 statement above, should be submitted with your proposal if Past Performance information is submitted from significant subcontractor, teaming partner, and/or joint venture partner for evaluation. The intent of this requirement is to allow the Government the opportunity for further investigation of any adverse or negative information which may be communicated from Past Performance Questionnaires received from the offeror’s selected list of evaluators. Although evaluation/questionnaires received which are adverse are somewhat rare, a release from the significant subcontractor, teaming partner, and/or joint venture partner is necessary in order for the Government to address any adverse information directly with the offeror.

2. Any questions may be referred to me at MACC.FOURPOINTOH@us.af.mil or via phone at 605-385-1734.

DAVID M. GOFF
Contracting Officer

Deter…Assure…Strike!

image1.png

File details come from the government source that posted it. Updated .