Blank Sample AF Form 3052.xls
XLS spreadsheet 41 KB Posted
- Solicitation number
- FA8501-20-B-0003
About this file
This file contains a construction cost estimate breakdown template and details of a related federal contract opportunity for Simplified Acquisition of Base Engineer Requirements II (SABER II) services at Robins Air Force Base in Georgia.
The federal contract opportunity is seeking bids for indefinite delivery/indefinite quantity SABER II services including planning, design, management, and performance of all work such as real property maintenance, repair, alteration and new construction. This is an 8(a) small business set-aside restricted to firms in SBA Region IV registered in NAICS code 236220. Bids are due by the specified time and must include the demonstration project attachment, bid schedule, bid bond, signed SF1442, and any acknowledgement of amendments. An optional site visit is available with RSVP required by the stated deadline and affidavit. Virtual bid opening details are provided for public viewing. The solicitation was issued by the Department of the Air Force Materiel Command Air Force Sustainment Center.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gen Cond 2
| CONSTRUCTION COST ESTIMATE BREAKDOWN | Page 1 | |||||||||
| CONTRACTOR: | GOVERNMENT ESTIMATE | ADDRESS | ||||||||
| CONTRACT FOR: | ||||||||||
| PROJECT NUMBER: | ||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | ||||||||
| Material Tax: | Labor Burden: | *Overhead: | *Profit: | |||||||
| UNIT | MATERIAL COST | LABOR COST | OTHER | |||||||
| LINE | OF | PER | MAN-HOURS | AVERAGE | DIRECT | LINE | ||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MAN-DAYS | RATE | TOTAL | COSTS | TOTAL |
| GENERAL CONDITIONS (PRIME CONTRACTOR)* | ||||||||||
| 1.0 | ||||||||||
| 2.0 | ||||||||||
| 3.0 | ||||||||||
| 4.0 | ||||||||||
| 5.0 | ||||||||||
| 6.0 | ||||||||||
| 7.0 | ||||||||||
| 8.0 | ||||||||||
| 9.0 | ||||||||||
| 10.0 | ||||||||||
| 11.0 | ||||||||||
| 12.0 | ||||||||||
| 13.0 | ||||||||||
| 14.0 | ||||||||||
| 15.0 | ||||||||||
| 16.0 | ||||||||||
| 17.0 | ||||||||||
| 18.0 | ||||||||||
| 19.0 | ||||||||||
| 20.0 | ||||||||||
| 21.0 | ||||||||||
| 22.0 | ||||||||||
| 23.0 | ||||||||||
| 24.0 | ||||||||||
| 25.0 | ||||||||||
| *NOTE: ITEMS ABOVE DO NOT SHOW LATEST MARKET PRICES, BUT THEY ARE GIVEN TO ENSURE THE DESIGNERS CONSIDER THEM ON EACH PROJECT. Edit/Delete for your Project. | $0 | $0 | $0 | $0 | ||||||
| Sales Tax | $0 | Labor Burden | $0 | |||||||
| Subtotal | $0 | Subtotal | $0 | $0.00 | $0 | |||||
| OverHead | $0 | |||||||||
| SubTotal | $0 | |||||||||
| Profit | $0 | |||||||||
| P&P Bonds | ||||||||||
| Grand Total | $0 | |||||||||
| AF Form 3052 Gen Conditions Page 1 |
&L&D &T&C&F
File details come from the government source that posted it. Updated .