UHHZ200017_Submittal_Register_Form_66.pdf
PDF 65 KB Posted
- Solicitation number
- FA8501-20-B-0003
About this file
This document contains a submittal register form and details of a federal contract opportunity notice. The submittal register form is for Project No. 200017 to renovate restrooms at a facility and lists various submittal items and due dates required from the contractor, including material submittals, close out documents, and a final approval schedule.
The federal contract opportunity is a simplified acquisition under the SABER II contract to provide base engineering requirements at Robins Air Force Base in Georgia. It is an 8(a) small business set aside for firms in specified states registered with NAICS code 236220. Bids are due by the date specified and must include the demonstration project attachment, bid schedule, bid bond, signed SF1442, and any acknowledgment of amendments. A site visit is required and details are provided in Section B for registration and affidavit submission. Section B also provides bid opening details and instructions for public viewing.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
200017
APPROVED DISAPPROVED
1 Material Submittals X X
CD X NLT + 30 days
BO
2 Close Out Documents X X
CD NLT + 90 days
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
SA
M
PL
ES
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O U
T
C
LO
SE
O
U T
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
ER
M
AT
ER
IA
L
O R
D
AT
A
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D
AT
IO
N
S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O
PE
R
AT
IN
G
IN
ST
R
U C
TI
O
N S
DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSE
DATE
SH
O
P D
R
AW
IN
G
S
BEFORE CONSTR AFTER CONSTR
M
AN
U
FA
C
TU
R
ER
'S
W
AR
R
AN
TY
SOLICITATION/CONTRACT NO.PROJECT TITLE
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66) RENOVATE RESTROOM, SHP ACFT GEN PURP, B169
File details come from the government source that posted it. Updated .