SABER RFI 5.pdf
PDF 39 KB Posted
- Solicitation number
- FA8501-20-B-0003
About this file
This document contains a government file and related federal contract opportunity. The government file discusses a Request for Information (RFI) for maintenance and repair work at Robins Air Force Base in Georgia. It clarifies that while drawings are provided for reference, the scope of work (SOW) generated for this specific project should be used to determine the required work.
The related federal contract opportunity is a solicitation for the Simplified Acquisition of Base Engineer Requirements II (SABER II) at Robins Air Force Base. Under this Indefinite Delivery/Indefinite Quantity contract, the contractor will plan, design, manage and perform real property maintenance, repair, alteration and new construction required by delivery orders. This is an 8(a) small business set-aside restricted to firms in Region IV registered under NAICS Code 236220. Bids are due by the time specified and must include the demonstration project attachment, bid schedule, bid bond, signed SF1442, and any amendments. Site visits are by RSVP only using the contact information provided, and bid openings will be virtual with viewing details in Section B. The soliciting agency is the Department of the Air Force Materiel Command Air Force Sustainment Center.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Is this contract proposal SOW generated or drawings generated? SOW generated The reason for asking is item 2xxvii has replacement of the exhaust fan, with disconnect. In drawing E03 (power and electrical plan) it show a combination starter to be installed as well (10). Also, in the drawing item 4 and 9 show work on the water heater and there no mention of any work on the water heater in the SOW. The additional cost of this item could make the difference in award and possible change order if this is a requirement for the Gov. and the two contradict one another. Please advise ASAP on these finding.
Drawings that are provided for this project are products from previous projects. Since this is not a design build, the only drawings available are those from previous projects. The drawings are provided simply as reference for things like distance of piping, HVAC ducting, wiring distances and overall room layout and size. Use the SOW requirements to determine the work that needs to be accomplished for this specific project.