DEMO PROJECT UHHZ260007 SUBMITTAL REGISTER.xls

XLS spreadsheet 36 KB Posted

Attached to
Robins AFB Paving Multi-Award IDIQ
Solicitation number
FA850126R0004
Issued by

About this file

This is a Schedule of Material Submittals register for a construction project at Robins Air Force Base under project number UHHZ260007. The document serves as a tracking template for the contractor to organize and submit required documentation throughout the project lifecycle, with submissions due at specified intervals relative to the Notice to Proceed (NTP).

Key submittal requirements include a project schedule due within seven days of NTP, monthly progress reports, a list of values with the first progress report, weekly daily reports, and a closeout report before final inspection. Additional mandatory submittals due within seven days of NTP include a health and safety plan, Air Force Forms 3064, 3065, and 3052, an environmental protection plan, a stormwater pollution prevention plan, and existing conditions documentation with photographs and field verification sign-off. Warranties are required within 60 days of NTP. The register provides columns for tracking submittal dates, receipt dates, return suspense dates, follow-up dates, contractor notifications, resubmittals, and final approvals with remarks indicating approved or disapproved status. The document references specification sections for possible additional submittal requirements and includes a legend directing contractors to include operations and maintenance manuals, warranty books, and color samples with specific line items.

View the file

Other files

File Type Posted
RobinsAFB_PavingIDIQ_FA850126R0004_UpdatedPage1.pdf PDF
WD_GA20260322.txt TXT text file
Attachment I - Blank Sample Form 911 xx Design Discipline Review.docx DOCX document
A - PROCEDURAL GUIDE FOR DESIGNERS INCLUDING AE FIRMS 2023.pdf PDF
Attachment T- UHHZ250030 SSR Document.pdf PDF
DEMO PROJECT UHHZ260007 Bid Schedule.pdf PDF
Attachment P- BLANK SAMPLE Schedule of Values Template_UNLOCKED.pdf PDF
Attachment M - App C UHHZ 250030.pdf PDF
Attachment L - Robins AFB Asbestos Management Plan - January 2015.pdf PDF
Attachment H - BLANK SAMPLE DD Form 1354 Transfer and Acceptance of DoD Real Property.pdf PDF
Attachment G - BLANK SAMPLE AF Form 3065.xlsx XLSX spreadsheet
Attachment C AFMAN 32-1084 Civil Engineering Facility Requirements.pdf PDF
Basewide Paving IDIQ SOW.pdf PDF
RobinsAFB_PavingIDIQ_FA850126R0004.pdf PDF
DEMO Project UHHZ260007 SOW.pdf PDF
Attachment U- UHHZ250030 _ DOT SSR Document_.pdf PDF
Attachment O- Bid Schedule.docx DOCX document
Attachment K - Master Utility Outage.pdf PDF
Attachment F BLANK SAMPLE AF Form 3064.xlsx XLSX spreadsheet
Attachment E - Blank Sample AF Form 3052.xls XLS spreadsheet
Attachment D AF Form 3000.pdf PDF
Attachment B AFMAN 31-116 Motor Vehicle Traffic Supervision (1).pdf PDF
Attachment R- Robins BFS 2024.pdf PDF
Attachment J - Blank Sample SUBMITTAL REGISTER.xls XLS spreadsheet
Attachment A - af2586_new.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALS
ROBINS AFBPROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
BEFORE CONSTRAFTER CONSTR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSCATALOG DATAOTHER MATERIAL OR DATACERTIFICATION OF COMPLIANCE AND CLOSEOUTCLOSEOUTMANUFACTURER'S WARRANTYOPERATING INSTRUCTIONSREQUIRED SUBMITTAL
DATEDATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGR. RETURN

SUSPENSE

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1time ScheduleNTP +7
2Progress reportsMonthly
3List of Valueswith first progress report
4Dailey reportsweekly
5Closeout ReportBefore final inspection
6health and safety planNTP +7
7AF Form 3064 & 3065 & 3052NTP +7
8Environmental protection planNTP +7
9Storm water Pollution Prvention planNTP +7
10Existing Conditions( Photographs and field Verification Sign-offNTP +7
11WarrantiesNTP+60
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
LEGEND:
A - Include with line 9 Operations and Maintenance Manual
B - Include with line 10 Warranty Book
C - Include with line 14 Color Samples

&LFA4600-11-B-0025

Attachment 3 Page &P &C1B-&P

File details come from the government source that posted it. Updated .