Attachment 9 - AF Form 3052 (Proposal cost sheet).xlsx

XLSX spreadsheet 45 KB Posted

Attached to
MACC Barksdale AFB (Solicitation) Federal contract opportunity
Solicitation number
FA4608-22-R-0001
Issued by
Department of the Air Force Global Strike Command

About this file

This document contains a construction cost estimate breakdown sheet and details of a related federal contract opportunity. The construction cost estimate breakdown sheet provides a line item breakdown of estimated costs for a design/construct project to build a west gate visitor center at Barksdale Air Force Base in Louisiana. It includes estimated material, labor, and other direct costs for various construction divisions such as site work, concrete, metals, and mechanical systems.

The related federal contract opportunity is a solicitation for an Indefinite Delivery/Indefinite Quantity multiple award construction contract to satisfy diverse construction and design-build projects at Barksdale Air Force Base. It is an 8(a) and socio-economic set-aside being conducted by the Department of the Air Force Global Strike Command.

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RECAP

FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.1OF3
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Design/Construct west gate visitor center B1512$ - 0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
RFP# FA4608-21-R-0005Barksdale AFB, Louisiana
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMAN-HOURSAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1Design EstimateLS1
2Division 1 - General RequirementsLS1
3Division 2 - SiteworkLS1
4Division 3- ConcreteLS1
5Division 5- MetalsLS1
6Division 6- Wood & PlasticsLS1
7Division 7- Thermal & MoistureLS1
8Division 8- Doors & WindowsLS1
9Division 9- FinishesLS1
10Division 10- SpecialtiesLS1
11Division 22- PlumbingLS1
12Division 23- Heating, Ventilating, and Air-ConditioningLS1
13Division 26- ElectricalLS1
SUBTOTAL
(AF Form 3052., AUG 93)
$ - 0
ERROR:#REF!

FA460822R0001

Attachment9

R1

FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.2OF3
CONTRACTORADDRESS
Barksdale AFB, Louisiana
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Design/Construct west gate visitor center B1512$ - 0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
RFP# FA4608-21-R-0005
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALQUANTITYAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Design Estimate
135% to 100% DesignLS

2 Design Total

Division 01 - General Requirements
3Project ManagerWeek
4SuperintendentWeek
5Mobilization/DemobilizationEA
6Gas/TravelWeek
7DumpstersLS
8TruckMONTH
9Temporary FacilitiesMONTH
10Tools and RentalLS
11General clean up during const. and Final CleanLS

12 Division 1 Total

Division 02 - Existing conditions
13Construction Barricades and MarkingsLS
14Site DemolitionLS
15Clearing and GrubbingLS
16Sitework Grading and EmbankmentSY
17Concrete PavingSY
18Aggregate Base CourseSY
19New CurbLF
20Geotextile FabricSY
21Concrete SidewalkSY
22New Pavement MarkingsLS
23sanitary Sewer Service (4 inch)LF
24Potable Water Service ConnectionLF
25Relocate ExistingDecorative FenceLF
26New Decorative FenceLF
27sodSF
28Temporary Erosion ControlLS

29 Division 2 Total

Division 3- Concrete
30Foundation and slab-on-gradeSF

31 Division 3 Total

Division 5- Metals
32Load bearing metal studs (exterior wall)SF
33Metal RoofingSF
34Metal FlashingLF

35 Division 5 Total

Division 6- Wood & Plastics
36Rough Carpentry (blocking, plates, ect..)LS
372x8 rafter framing and 2x10 clg. JoistsLS
38Plywood SheathingLS
39Hardi Board soffit and fascia'sLS
40Millwork lower & quartz counter tops (special)LF
41Millwork upperLF

42 Division 6 Total

Division 7- Thermal & Moisture
43Acoustical InsulationSF
44Spray Foam Insulation underside of roof w/ ignition barrierSF
45EIFSSF

46 Division 7 Total

Division 8- Doors & Windows
47Doors (New) with frameEA
48Finish HardwareEA
49Windows (New)EA
50Aluminum Storefront doorEA

51 Division 8 Total

Division 9- Finishes
52Lay in Ceiling tile and gridSF
53Porcelain TileSF
54Stained Wood Base and wainscotLF
55Install Gyp. Bd. Walls (includes mtl. studs)LF
56Install Gyp. Bd. Ceilings (includes mtl. studs)SF
57Paint all existing and new walls after touch upSF

58 Division 9 Total

Division 10- Specialties
59Transition Strips (aluminum)EA
60Toilet Acc. (Allowance)LS
61SignageLS

62 Division 10 Total

Division 22- Plumbing
63PlumbingLS

64 Division 22 Total

Division 23- Heating, Ventilating, and Air-Conditioning
65HVAC/ DuctworkLS
66ControlsLS

67 Division 23 Total

Division 26- Electrical
68Fire Alarm and Mass Notification SystemsLS
69Wiring DevicesLS
70Branch circuit wiringLS
71LightingLS
72Comm/ Data Raceway and GroundingLS
73New Secondary Conduit/ConductorsLS
74New Electrical PanelLS

75 Division 26 Total

Sub Total of Quantity Take Off
76Overhead - %
77Permits/Bond/Insurance - %
Sub Total
78Profit - %

Total Construction Cost

Total Design & Construction Cost

SUMMARY

3 of 3
INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square
feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be
furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will
be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of man-hours or man days needed to perform the work listed in column 1.
Enter in Col 7 the average rate per man-hour (man-day) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows.
`

FOR OFFICIAL USE ONLY

Design/Construct west gate visitor center B1512 TOTAL

TOTAL DESIGN COSTS

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

PROFIT

BOND

TOTAL

DATE : FIRM NAME :

TITLE :By:
(Signature)

(Gov. Signature)

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3(e) and 3-807.4)
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection
with any negotiations prior to contract award.

(Reverse of AF Form 3052., AUG 93)