This document contains a construction cost estimate breakdown sheet and details of a related federal contract opportunity. The construction cost estimate breakdown sheet provides a line item breakdown of estimated costs for a design/construct project to build a west gate visitor center at Barksdale Air Force Base in Louisiana. It includes estimated material, labor, and other direct costs for various construction divisions such as site work, concrete, metals, and mechanical systems.
The related federal contract opportunity is a solicitation for an Indefinite Delivery/Indefinite Quantity multiple award construction contract to satisfy diverse construction and design-build projects at Barksdale Air Force Base. It is an 8(a) and socio-economic set-aside being conducted by the Department of the Air Force Global Strike Command.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECAP
| FOR OFFICIAL USE ONLY | |||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET NO. | 1 | OF | 3 | |||
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Design/Construct west gate visitor center B1512 | $ - 0 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | ||||||||
| RFP# FA4608-21-R-0005 | Barksdale AFB, Louisiana | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MAN-HOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE | UNIT COSTS | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | Design Estimate | LS | 1 | |||||||
| 2 | Division 1 - General Requirements | LS | 1 | |||||||
| 3 | Division 2 - Sitework | LS | 1 | |||||||
| 4 | Division 3- Concrete | LS | 1 | |||||||
| 5 | Division 5- Metals | LS | 1 | |||||||
| 6 | Division 6- Wood & Plastics | LS | 1 | |||||||
| 7 | Division 7- Thermal & Moisture | LS | 1 | |||||||
| 8 | Division 8- Doors & Windows | LS | 1 | |||||||
| 9 | Division 9- Finishes | LS | 1 | |||||||
| 10 | Division 10- Specialties | LS | 1 | |||||||
| 11 | Division 22- Plumbing | LS | 1 | |||||||
| 12 | Division 23- Heating, Ventilating, and Air-Conditioning | LS | 1 | |||||||
| 13 | Division 26- Electrical | LS | 1 |
| SUBTOTAL | |
| (AF Form 3052., AUG 93) |
| $ - 0 |
| ERROR:#REF! |
FA460822R0001
Attachment9
R1
| FOR OFFICIAL USE ONLY | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET NO. | 2 | OF | 3 | ||||||
| CONTRACTOR | ADDRESS | |||||||||
| Barksdale AFB, Louisiana | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Design/Construct west gate visitor center B1512 | $ - 0 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | ||||||||
| RFP# FA4608-21-R-0005 | ||||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | QUANTITY | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE | UNIT COSTS | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Design Estimate | ||
| 1 | 35% to 100% Design | LS |
2 Design Total
| Division 01 - General Requirements | ||
| 3 | Project Manager | Week |
| 4 | Superintendent | Week |
| 5 | Mobilization/Demobilization | EA |
| 6 | Gas/Travel | Week |
| 7 | Dumpsters | LS |
| 8 | Truck | MONTH |
| 9 | Temporary Facilities | MONTH |
| 10 | Tools and Rental | LS |
| 11 | General clean up during const. and Final Clean | LS |
12 Division 1 Total
| Division 02 - Existing conditions | ||
| 13 | Construction Barricades and Markings | LS |
| 14 | Site Demolition | LS |
| 15 | Clearing and Grubbing | LS |
| 16 | Sitework Grading and Embankment | SY |
| 17 | Concrete Paving | SY |
| 18 | Aggregate Base Course | SY |
| 19 | New Curb | LF |
| 20 | Geotextile Fabric | SY |
| 21 | Concrete Sidewalk | SY |
| 22 | New Pavement Markings | LS |
| 23 | sanitary Sewer Service (4 inch) | LF |
| 24 | Potable Water Service Connection | LF |
| 25 | Relocate ExistingDecorative Fence | LF |
| 26 | New Decorative Fence | LF |
| 27 | sod | SF |
| 28 | Temporary Erosion Control | LS |
29 Division 2 Total
| Division 3- Concrete | ||
| 30 | Foundation and slab-on-grade | SF |
31 Division 3 Total
| Division 5- Metals | ||
| 32 | Load bearing metal studs (exterior wall) | SF |
| 33 | Metal Roofing | SF |
| 34 | Metal Flashing | LF |
35 Division 5 Total
| Division 6- Wood & Plastics | ||
| 36 | Rough Carpentry (blocking, plates, ect..) | LS |
| 37 | 2x8 rafter framing and 2x10 clg. Joists | LS |
| 38 | Plywood Sheathing | LS |
| 39 | Hardi Board soffit and fascia's | LS |
| 40 | Millwork lower & quartz counter tops (special) | LF |
| 41 | Millwork upper | LF |
42 Division 6 Total
| Division 7- Thermal & Moisture | ||
| 43 | Acoustical Insulation | SF |
| 44 | Spray Foam Insulation underside of roof w/ ignition barrier | SF |
| 45 | EIFS | SF |
46 Division 7 Total
| Division 8- Doors & Windows | ||
| 47 | Doors (New) with frame | EA |
| 48 | Finish Hardware | EA |
| 49 | Windows (New) | EA |
| 50 | Aluminum Storefront door | EA |
51 Division 8 Total
| Division 9- Finishes | ||
| 52 | Lay in Ceiling tile and grid | SF |
| 53 | Porcelain Tile | SF |
| 54 | Stained Wood Base and wainscot | LF |
| 55 | Install Gyp. Bd. Walls (includes mtl. studs) | LF |
| 56 | Install Gyp. Bd. Ceilings (includes mtl. studs) | SF |
| 57 | Paint all existing and new walls after touch up | SF |
58 Division 9 Total
| Division 10- Specialties | ||
| 59 | Transition Strips (aluminum) | EA |
| 60 | Toilet Acc. (Allowance) | LS |
| 61 | Signage | LS |
62 Division 10 Total
| Division 22- Plumbing | ||
| 63 | Plumbing | LS |
64 Division 22 Total
| Division 23- Heating, Ventilating, and Air-Conditioning | ||
| 65 | HVAC/ Ductwork | LS |
| 66 | Controls | LS |
67 Division 23 Total
| Division 26- Electrical | ||
| 68 | Fire Alarm and Mass Notification Systems | LS |
| 69 | Wiring Devices | LS |
| 70 | Branch circuit wiring | LS |
| 71 | Lighting | LS |
| 72 | Comm/ Data Raceway and Grounding | LS |
| 73 | New Secondary Conduit/Conductors | LS |
| 74 | New Electrical Panel | LS |
75 Division 26 Total
| Sub Total of Quantity Take Off | |
| 76 | Overhead - % |
| 77 | Permits/Bond/Insurance - % |
| Sub Total | |
| 78 | Profit - % |
Total Construction Cost
Total Design & Construction Cost
SUMMARY
| 3 of 3 | |
| INSTRUCTIONS FOR COMPLETING AF FORM 3052 |
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | |
| permit itemizing of all direct costs. | |
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square | |
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). | |
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be | |
| furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will | |
| be issued. Otherwise, the contractor is responsible for determining quantity estimates. | |
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | |
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of man-hours or man days needed to perform the work listed in column 1. | |
| Enter in Col 7 the average rate per man-hour (man-day) and in Col 8 the total labor cost. | |
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract | |
| and of significant dollar value. | |
| Col 10 Line Total. Self-explanatory. | |
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |
| page as follows. | |
| ` |
FOR OFFICIAL USE ONLY
Design/Construct west gate visitor center B1512 TOTAL
TOTAL DESIGN COSTS
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
PROFIT
BOND
TOTAL
DATE : FIRM NAME :
| TITLE : | By: | |
| (Signature) |
(Gov. Signature)
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and |
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from |
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data |
| (see ASPR 3-807.3(e) and 3-807.4) |
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this |
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and |
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of |
| a. The existing, verifiable data. |
| b. The judgmental factors applied in projecting from known data to the estimate, and |
| c. The contingencies used by the offeror in his proposed price. |
| In short, the offeror's estimating process itself needs to be disclosed. |
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), |
| and made available to the contracting officer or his authorized representative upon request. |
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the |
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate |
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection |
| with any negotiations prior to contract award. |
(Reverse of AF Form 3052., AUG 93)