Attachment 4 - Material submittals.xls

XLS spreadsheet 54 KB Posted

Attached to
MACC Barksdale AFB (Solicitation) Federal contract opportunity
Solicitation number
FA4608-22-R-0001
Issued by
Department of the Air Force Global Strike Command

About this file

This document contains a schedule of material submittals template for a federal construction contract. The template requires contractors to provide information including the item description and contract reference, type of submittal such as shop drawings or test reports, the number of copies, and dates for submission, receipt, review, resubmittal, and final approval. It is to be used for contract number FA460821R0005 for an unspecified project.

A related solicitation seeks proposals for an IDIQ multiple award construction contract with the Air Force Global Strike Command at Barksdale AFB. Offerors will compete for both 8(a) and unrestricted task orders for construction and design-build projects over the life of the contract. Proposals are due under solicitation number FA4608-22-R-0001.

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
[ enter here ]Project Title:
[ enter here ]Solicitation / Contract Number: FA460821R0005 Attachment 4 Page 1 of 1

[ enter here ]

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).

&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)