AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 69056725B000001
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Coffman Cove, Alaska, United States
- Points of contact
-
- Contracts G. Office wfl.contracts@dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Transportation Federal Highway Administration is soliciting sealed bids for the AK PFH 58(1) Neck Lake Road Reconstruction project located 45 miles northwest of Coffman Cove on Prince of Wales Island, Alaska. The procurement encompasses comprehensive roadway reconstruction services including excavation, sub-excavation, soft ground embankment construction, grading, rock blasting, riprap placement, drainage infrastructure installation, guardrail installation, erosion control, temporary traffic control, permanent signage, and turf establishment. This is a firm-fixed-price contract offered for full and open competition on an unrestricted basis with no set-aside designations. The solicitation documents, including specifications and plans, will be posted to SAM.gov in Winter 2024/2025, and interested vendors should register in SAM.gov and utilize the follow function to receive notification when documents become available. While specific evaluation criteria are not detailed in this pre-solicitation notice, vendors are encouraged to review the preliminary plans and project description available in electronic format to understand project requirements.
The contract structure includes three alternate bid schedules covering 1.6 miles, 2.0 miles, and 2.4 miles of road reconstruction respectively, with only one schedule selected for award. The estimated contract value ranges between $10,000,000 and $20,000,000, representing a significant infrastructure investment. The tentative project completion date is Fall 2026, providing contractors with approximately two years to execute the work. No incumbent contractor or potential competitor information is identified in this pre-solicitation notice. Interested vendors should monitor SAM.gov for the formal invitation for bids and associated technical documents to prepare competitive proposals for this Alaska transportation infrastructure project.
Notice text
PROJECT: AK PFH 58(1), Neck Lake Rd. Reconstruction: NPOWI Hwy.to Marine Access Facility Jct.
LOCATION: 45 miles NW of Coffman Cove, Hyder Census Area, Prince of Wales Island, Alaska
WORK: Work consists of roadway excavation, sub-excavation, soft ground embankment construction (surcharge), grading, rock blasting, riprap placement, rockery, drainage (including large Aquatic Organism Pipes), embankment (including settlement monitoring), placement of aggregate surface course, guardrail installation, erosion control, temporary traffic control, permanent signage, and turf establishment. See “Project Description” posted under attachments for additional details.
LENGTH:
Schedule A – 1.6 miles of road reconstruction
Schedule B – 2.0 miles of road reconstruction
Schedule C – 2.4 miles of road reconstruction
TENTATIVE COMPLETION DATE: Fall 2026
CONTRACT TYPE: Sealed Bid, Firm-Fixed-Price
ESTIMATED PRICE RANGE: Between $10,000,000 and $20,000,000
INTERESTED VENDORS LIST: To view the Interested Vendors List,you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.
THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS
This project is anticipated to be solicited Winter 2024/2025
This project will include 3 bid schedules. Only one schedule will be awarded.
PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this link.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. | Award Notice | |
| AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements | Federal Highway Administration | No set-aside | |
| WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 | Federal Highway Administration | No set-aside | |
| Acadia National Park | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity