Solicitation Amendment 2 W50S8T25BA0110002.pdf
PDF 2 MB Posted
- Solicitation number
- W50S8T25BA011
- Issued by
-
Department of the Army National Guard
About this file
This is Amendment 2 to solicitation W50S8T25BA011 which extends the bid due date and provides answers to RFIs for a renovation project at Building 1040 at the 137th SOW Will Rogers Air National Guard Base in Oklahoma. The amendment incorporates Addendum 2 narrative along with updated specifications and drawings related to partitions, interiors, and other building components.
The renovation project involves reconfiguring the interior layout to accommodate squadron operations, Command Post space, Intelligence Squadron support, and Communication Squadron administration and shop functional areas. The work includes upgrading interior finishes, repairing/replacing ceiling tiles, and replacing floor coverings. The bid due date has been extended from March 6, 2025 to March 10, 2025 at 1000 CST. This is a 100% small business set-aside with an estimated value between $5-10 million. A pre-bid conference is scheduled for January 30, 2025 at 1000 CST at Building 1007. Hand-carried bids must be delivered to 5624 Air Guard Dr Building 1009 Room 150, Oklahoma City, OK 73179. The project uses proprietary systems including Advantor security systems, Monaco fire alarm systems, and Johnson Controls METSYS systems.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
W50S8T25BA0110002
Page2 of8
Block 14 (Description of Amendment/Modification): The purpose of this amendment is as follows;
1. To provide answers to RFis received in regards to this solicitation.
2. To incorporate addendum 2 narrative with all of the updated documents included as attachments.
3. The bid due date has been extended as follows:
FROM: 6 Mar 25 @ lO00hrs CST.
TO: 10 Mar 25 @ lO00hrs CST.
4. All other terms and conditions remain the same.
Section 00 00 00 - Procurement and Contracting Requirements
The following changes have been made:
INFORMATION FROM TO
Response Due Date 06Mar 2025 10 Mar 2025
Section 00 01 10 - Table of Contents
Miscellaneous text in this section has been modified to:
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00 10 00 - BID SCHEDULE, NOTES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TOOFFERORS
SECTION 00 45 00 - REPRESENTATIONS & CERTIFICATIONS
SECTION 00 70 00 - CONTRACT CLAUSES
SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS
SECTION 01 00 00 - GENERAL REQUIREMENTS
ATTACHMENT 1 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_DRAWINGS.pdf
ATTACHMENT 2 - 2024.09.12_OK-ANG_SQUADOPS Bl040_TYPE B3_SPECIFICATIONS VOL. 1.pdf
ATTACHMENT 3 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 2.pdf
These attachments are now incorporated and shall be considered part of the contract requirements
AMENDMENT 1 ATTACHMENTS:
Amendment 1 Attachment 1 - TABLE OF CONTENTS
Amendment 1 Attachment 2 -Addendum 01 Narrative
Amendment 1 Attachment 3 -08 81 00
Amendment 1 Attachment 4 -08 71 00
Amendment 1 Attachment 5 -08 41 13
Amendment 1 Attachment 6 -08 11 16
Amendment 1 Attachment 7 -06 41 16.00 10
Amendment 1 Attachment 8 -06 20 00
Amendment 1 Attachment 9 -01 45 35
Amendment 1 Attachment 10 - Bldg 1040 Reno Questions and Answers
Amendment 1 Attachment 11 -26 05 73
Amendment 1 Attachment 12 -21 13 13
Amendment 1 Attachment 13 -10 51 16
Amendment 1 Attachment 14 -10 51 13
Amendment 1 Attachment 15 -10 21 13
Amendment 1 Attachment 16 -AE502-DETAILS
Amendment 1 Attachment 17 -AE411 -INTERIOR ELEVATIONS
Amendment 1 Attachment 18 -AE403 -ENLARGED PLANS
Amendment 1 Attachment 19 -AE402 -ENLARGED PLANS
Amendment 1 Attachment 20 -AE201 -BUILDING ELEVATIONS
Amendment 1 Attachment 21 - AE151 - REFLECTED CEILING PLAN - SECTOR A
T
W50S8T25BA0110002
Page3 of8
File details come from the government source that posted it. Updated .