This is a Room Finish Schedule detailing interior finishes and fixtures for Building 1040 renovation project at Will Rogers Air National Guard Base. The document provides comprehensive specifications for flooring, wall, ceiling and other finishes across approximately 70 rooms including offices, corridors, data centers, restrooms, and multi-use spaces.

The schedule includes detailed material specifications such as carpet tiles (CPT1-3), porcelain tiles (PRC1-4), paint finishes (PT1-4), acoustical ceiling panels (ACP1), and various other finishes with corresponding abbreviations defined in a legend. Key general notes specify that all finishes are basis of design, require government interior designer color approval, must meet sustainable product requirements, and include specific installation requirements like 30/70% running bond pattern for porcelain tile. Special considerations are noted for certain spaces, such as electrostatic dissipative flooring in technical areas, acoustical wall panels in break rooms, and coordinated carpet installation on raised access floors in multi-use spaces. The document includes room-by-room specifications detailing finish requirements for floors, walls, ceilings and any special notes or requirements.

View the file

Other files

File Type Posted
Abstract (Final).pdf PDF
Amendment 3 Attachment 1 - Bldg 1040 Reno Questions and Answers.docx DOCX document
Solicitation Amendment 3 W50S8T25BA0110003.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 1.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 2.pdf PDF
Amendment 2 Attachment 2 - 09 72 00.pdf PDF
Amendment 2 Attachment 5 - IN600 - INTERIORS MATERIALS LEGEND.pdf PDF
Amendment 2 Attachment 3 - A-002 - PARTITION TYPES.pdf PDF
Amendment 2 Attachment 6 - Bldg 1040 Reno Questions and Answers.xlsx XLSX spreadsheet
Amendment 2 Attachment 1 - Addendum 02 Narrative.docx DOCX document
Solicitation Amendment 2 W50S8T25BA0110002.pdf PDF
Amendment 2 Attachment 4 - 08 11 16.pdf PDF
06 20 00.pdf PDF
21 13 13.pdf PDF
IN101 - FLOOR FINISH PLAN - SECTOR A.pdf PDF
Bldg 1040 Reno Questions and Answers - FSB and GOV Reponses.xlsx XLSX spreadsheet
EL101 - ELECTRICAL INTERIOR LIGHTING PLAN - SECTOR A.pdf PDF
AE102 - FLOOR PLAN - SECTOR A.pdf PDF
AE502 - DETAILS.pdf PDF
AE403 - ENLARGED PLANS.pdf PDF
10 21 13.pdf PDF
10 51 13.pdf PDF
08 41 13.pdf PDF
AE103 - FLOOR PLAN - SECTOR B.pdf PDF
08 81 00.pdf PDF
AE411 - INTERIOR ELEVATIONS.pdf PDF
AE402 - ENLARGED PLANS.pdf PDF
AE601 - DOOR SCHEDULE AND DETAILS.pdf PDF
26 05 73.pdf PDF
08 11 16.pdf PDF
AE602 - OLI 1 - EXTERIOR WINDOW FRAMES.pdf PDF
Addendum 01 Narrative.docx DOCX document
08 71 00.pdf PDF
IN102 - FLOOR FINISH PLAN - SECTOR B.pdf PDF
Solicitation Amendment 1 W50S8T25BA0110001 SF 30.pdf PDF
06 41 16.00 10.pdf PDF
AE201 - BUILDING ELEVATIONS.pdf PDF
TABLE OF CONTENTS.pdf PDF
A-002 - PARTITION TYPES.pdf PDF
01 45 35.pdf PDF
FA601 - FIRE ALARM - MASS NOTIFICATION RISER DIAGRAM.pdf PDF
AE151 - REFLECTED CEILING PLAN - SECTOR A.pdf PDF
10 51 16.pdf PDF
30 Jan 25 Site Visit Sign In Sheet.pdf PDF
BLDG 1040 Renovation Site Visit Slides 30 January 25.pptx PPTX presentation
ATTACHMENT 3 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 2.pdf PDF
Solicitation - W50S8T25BA011.pdf PDF
ATTACHMENT 2 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 1.pdf PDF
Bidders Checklist.docx DOCX document
ATTACHMENT 1 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_DRAWINGS.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATION LEGEND

INTERIOR FINISHES & FIXTURES MARK LEGEND

ACP ACOUSTICAL CEILING PANEL

AWP ACOUSTICAL WALL PANEL

CG CORNER GUARD

CONC CONCRETE

CPT CARPET

ESD ELECTROSTATIC DISSIPATIVE

RESILIENT TILE

ETR EXISTING TO REMAIN

EXP EXPOSED STRUCTURE

FP FOLDING PARTITION

FRP FIBER REINFORCED PANEL

GF/CI GOVERNMENT FURNISHED /

CONTRACTOR INSTALLED

GL GLAZING

GRT GROUT

GYP BD GYPBOARD

HDW HARDWARE

J NOT USED

K NOT USED

LB LOCKER - DRESSING BENCH

LK LOCKER

LVR LOUVER

MP METAL PANEL

MI MIRROR

N NOT USED

O NOT USED

PLAM PLASTIC LAMINATE

PRC PORCELAIN TILE

PRCB PORCELAIN TILE WALL BASE

PT PAINT

PTE PAINT (EPOXY)

EXAMPLE: PT1E

PT-SG PAINT (SEMI-GLOSS FINISH)

PUL BAR PULL (CABINET HARDWARE)

RAF RAISED ACCESS FLOOR

RB RESILIENT BASE

RH ROBE HOOK

RF RESILIENT FLOORING

SC SHOWER CURTAIN

SG SIGNAGE

SHW SHOWER BASE AND SURROUND

SS STAINLESS STEEL

SSM SOLID SURFACE MATERIAL

TA TOILET ACCESSORIES

TP TOILET PARTITION

TPD TOILET PAPER DISPENSER

TR TRANSITION (OR) TRIM

U NOT USED

V NOT USED

WWC WRITEABLE WALLCOVERING

WD WOOD

WOC WALK-OFFF CARPET

WPF WINDOW PRIVACY FILM

WT WINDOW TREATMENT

X NOT USED

Y NOT USED

Z NOT USED

GENERAL NOTES

A. ALL SPECIFIED FINISHES ARE BASIS OF DESIGN

AND DO NOT EXCLUDE APPROVED FINISHES OF

EQUAL OR GREATER QUALITY.

B. SPECIFIED PRODUCTS ARE INTENDED TO SHOW

MINIMUM LEVEL OF PRODUCT MANUFACTURE AND

PRODUCT SALIENT CHARACTERISTICS, AS WELL

AS COLOR. SUBJECT TO COMPLIANCE WITH

SPECIFICATION REQUIREMENTS, PROVISION OF A

PRODUCT NOT NAMED IN THIS SCHEDULE IS NOT

CONSIDERED A SUBSTITUTION.

C. WHEN DELIVERING A PRODUCT OR COLOR

VARIATION FOR APPROVAL, THE CONTRACTOR

WARRANTS THAT THIS CONTRACT HAS BEEN

REVIEWED TO ESTABLISH THAT THE VARIATION, IF

INCORPORATED, WILL BE COMPATIBLE WITH

OTHER ELEMENTS OF THE WORK.

D. WHERE A COLOR IS SPECIFIED, SUBMIT PRODUCTS

WITH A VISUAL MATCH TO THE PRODUCT

SPECIFIED, OR COMPLEMENTARY TO THE PROJECT

AS A WHOLE. COLOR MUST BE APPROVED BY

GOVERNMENT INTERIOR DESIGNER.

E. WHERE SPECIFICATIONS REQUIRE PRODUCT TO

MEET SUSTAINABLE PRODUCT CHARACTERISTICS,

SELECT PRODUCTS COMPLYING WITH INDICATED

REQUIREMENTS. COMPLY WITH REQUIREMENTS IN

DIVISION 01 SUSTAINABILITY REQUIREMENTS

SECTION AND INDIVIDUAL SPECIFICATION

SECTIONS.

F. SCHEDULES SHOULD BE CONSIDERED AS

COMPLEMENTARY TO THE CONSTRUCTION

DOCUMENTS AS A WHOLE. ANY QUESTIONS OR

CONFLICTS SHOULD BE BROUGHT TO THE

ARCHITECTS ATTENTION.

G. INSTALL ALL PORCELAIN TILE IN 30/70% RUNNING

BOND PATTERN, ALLOWING FOR A 1/3RD LAP PER

TCNA RECOMMENDATIONS.

H. TILED WALLS: THERE SHALL BE NO EXPOSED TILE

EDGES. PROVIDE A STAINLESS STEEL TRIM STRIP.

I. REFER TO FLOORING TRANSITION SCHEDULE FOR

TRANSITIONS BETWEEN DISSIMILAR MATERIALS.

PROVIDE A SMOOTH TRANSITION BETWEEN ALL

DIFFERENT FLOORING MATERIALS.

J. PROVIDE MINIBLINDS AT ALL EXTERIOR WINDOWS.

K. PROVIDE PRIVACY WINDOW FILM AT WINDOWS

INDICATED ON IN102.

L. PROVIDE MAGNETIC, WRITEABLE WALL COVERING

IN ROOM 118 ON WEST WALL AS INDICATED.

INSTALL FROM 36" AFF TO 84" AFF.

ACP1

CEILING

PT4

CEILING PAINT

ACOUSTICAL CEILING

PANELS IN 15/16"

GRID, TEGULAR

EDGE

DRYFALL PAINT, FLAT

FINISH

MODULAR CARPET

TILE 24" X 24"

ELECTROSTATIC

DISSIPATIVE

CPT1

FLOORING

MODULAR CARPET

TILE, 24" X 24" -

ACCEPTED FOR

FACTORY

INSTALLATION ON

RAISED ACCESS

FLOORS

CPT2

FLOORING

MODULAR CARPET

TILE 18" X 36"

GENERAL FIELD

CARPET

CPT3

FLOORING

RUBBER TILE,

24" X 24"

ELECTROSTATIC

DISSIPATIVE

ESD1

FLOORING

PRC1

AND

PRCB1

FLOORING

PORCELAIN FLOOR

TILE, 12" X 24"

FIELD TILE

PRC2

AND

PRCB2

FLOORING

PORCELAIN FLOOR

TILE, 12" X 24"

ACCENT TILE (REFER

FINISH PLANS FOR

LOCATIONS)

ENTRANCE CARPET

TILE, 24" X 24"

(ENTRIES) - WALK-

OFF CARPET TILE

WOC1

FLOORING

FOLDING

PARTITIONS - TYPE II

VINYL

WALLCOVERING

FP1

WALLS

PORCELAIN TILE 12"

X 24" WALL FIELD

TILE

PRC3

WALLS

PRC4

WALLS

PORCELAIN TILE 3" X

12" WALL ACCENT

TILE, GLOSSY

PT1

WALLS

GENERAL WALL

PAINT COLOR - AS

SCHEDULED,

EGGSHELL FINISH

PT2

WALLS

PT2-SG - DOOR

FRAMES IN SEMI-

GLOSS

GENERAL WALL

PAINT COLOR - AS

SCHEDULED,

EGGSHELL FINISH

PT3

WALLS

GENERAL WALL

PAINT COLOR - AS

SCHEDULED,

EGGSHELL FINISH

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

2020-484-00

NDM

Re pa ir/ Co nv er t S qu ad O ps Ok lah om a C ity

, O K

NG

BJ

V/

OK

A

NG

PN: YZEU142025

C :\U sers\tw ood\ O neD rive - FS

B Architects + Engineers\D ocu m ents\048400_A

R C

H _tw oodD

XX

EM

.rvt

2/14/2025 3:17: 13 PM

12 SEPTEMBER 2024

ROOM FINISH SCHEDULE

AE600

MJT

TLW

JO

ROOM FINISH SCHEDULE

ROOM

NUMBER ROOM NAME Area

FLOOR

FINISH

BASE

FINISH

WALL FINISHES

NORTH CEILING FINISH

CEILING

HEIGHT NOTESSOUTH EAST WEST

100 VEST 97 SF WOC1 RB1 PT1 PT1 PT1 PT1 GYP BD - PT4 8' - 1"

101 CORR 773 SF PRC1/PRC

PRCB1 PT2 PT2 PT2 PT2 ACP1 8' - 0"

102 CLIENT SVC CTR. 300 SF CPT3 RB1 PT1 PT1 PT3 PT1 ACP1 8' - 2" PASS-THRU WINDOW COUNTER

103 BREAK RM 120 SF PRC2 RB1 PT1 /

AWP1

PT1 PT1 PT1 ACP1 8' - 0" ACOUSTICAL WALL PANELS TO REDUCE NOISE. INSTALL

AWP1 FROM FLOOR TO CEILING.PROVIDE TRIM FOR

EXXPOSED EDGES.

104 T&T 230 SF CPT3 RB1 PT1 GL PT1 PT1 ACP1 8' - 0"

105 CMDR 171 SF CPT3 RB1 PT1 GL PT1 PT1 ACP1 8' - 0"

106 1ST SGT 147 SF CPT3 RB1 PT1 PT1 PT1 PT1 ACP1 8' - 0"

107 VEST 30 SF WOC RB1 PT1 PT1 PT1 PT1 GYP BD - PT4 8' - 2"

108 CORR 223 SF CPT3 RB1 PT2 PT2 PT2 PT2 ACP1 8' - 0"

109 CORR. 244 SF CPT3 RB1 PT2 PT2 PT2 PT2 ACP1 8' - 0"

110 DATA CENTER 883 SF ETR ETR ETR ETR ETR ETR ACP1 8' - 0"

111 CRYPTO VAULT 258 SF ETR ETR ETR ETR ETR ETR ACP1 8' - 0"

112 P&R CHIEF 143 SF CPT3 RB1 PT1 PT1 GL PT1 ACP1 8' - 0"

113 OFFICE 166 SF ESD1 RB1 PT1 PT1 PT1 PT1 ACP1 8' - 0"

114 VAULT 100 SF ESD1/ ETR

RAF

RB1 PT1 PT1 PT1 PT1 EXP STRUCT -

PT4

8' - 0"

115 TEL/SWITCH 339 SF ESD1 RB1 PT1 PT1 PT1 EXIST/PT

ETR 10' - 0"

116 DATA 71 SF ESD1 RB1 PT1 PRC3/PR

C4

PT1 EXIST ETR 10' - 0"

117 PRINT SUPPLY 69 SF CPT3 RB1 PT1 PT1 PT1 PT1 ACP1 8' - 0"

118 MISSION DEF

TEAM (S.O.S.)

530 SF CPT3 RB1 PT1 PT1/WW

C1

PT1 PT1 ACP1 8' - 0"

119 P&R 993 SF CPT3 RB1 PT2 PT2 GL PT2 ACP1 8' - 0"

120 UNISEX 66 SF PRC2 TR2 PRC3 PRC3/PR

C4

PRC3 PRC3 GYP BD - PT4 8' - 0"

120.1 SHOWER 48 SF PRC2 TR2 PRC3 PRC3 PRC3 PRC3/SH

W2

GYP BD - PT4 8' - 0"

121 MECH 121 SF CONC1 RB1 PT1 PT1 PT1 PT1 ETR 10' - 0"

122 ELEC 45 SF CONC1 RB1 PT1 PT1 PT1 PT1 ETR 8' - 0"

123 FIRE RISER/FACP 54 SF CONC1 RB1 PT1 PT1 PT1 PT1 ETR 10' - 0"

124 VEST 32 SF WOC1 RB1 PT1 PT1 PT1 PT1 GYP BD - PT4 8' - 0"

125 RADIO SHOP 630 SF ETR RB1 PT1 PT1 PT1 PT1 EXP STRUCT -

PT4

10' - 0" NO WORK INSIDE THE FENCE

126 ITE 341 SF CONC2 RB1 PT1 PT1 PT1 GL EXP STRUCT -

PT4

10' - 0"

126.1 ELEC. 48 SF CONC1 - PT1 PT1 PT1 PT1 EXP STRUCT -

PT4

10' - 0"

127 CORR 324 SF PRC1/PRC

PRCB1 PT2 PT2 PT2 PT2 ACP1 10' - 0"

128 WOMEN 132 SF PRC2 TR2 PRC3 PRC3 PRC3 PRC3/PR

C4

GYP BD - PT4 8' - 0"

129 VEST. 53 SF CPT3 RB1 PT1 PT1 PT1 PT1 ACP1 8' - 0"

130 MEN 211 SF PRC2 TR2 PRC3 PRC3 PRC3 PRC3/PR

C4

GYP BD - PT4 8' - 0"

131 EA/ADMIN 477 SF CPT3 RB1 PT1 PT1 PT1 PT1 ACP1 8' - 0"

132 C.A.T. 391 SF CPT2 RB1 PT1 PT1 PT1 PT1 ACP1 8' - 0" ELECTROSTATIC DISSAPATIVE CARPET TILE

133 CORR. 199 SF CPT3 RB1 PT1 PT1 PT1 PT1 ACP1 8' - 0"

134 BREAK RM 100 SF PRC2 RB1 PT1 PT1 PT1 AWP1 ACP1 8' - 0" ACOUSTICAL WALL PANELS TO REDUCE NOISE. INSTALL

AWP1 FROM FLOOR TO CEILING.PROVIDE TRIM FOR

EXXPOSED EDGES.

135 OFF/TRAIN. 125 SF CPT3 RB1 PT1 PT1 PT1 PT1 ACP1 8' - 0"

136 CP MGR. 125 SF CPT3 RB1 PT1 PT1 PT1 PT1 ACP1 8' - 0"

137 FRAME 128 SF CONC2 RB1 PT1 PT1 PT1 PT1 ACP1 8' - 0"

138 OPER TEAM 1,572

SF

CPT3 RB1 PT2 PT2 PT2/GL PT2 ACP1 8' - 0"

139 OPS CHF. 116 SF CPT3 RB1 PT1 PT1 PT1 PT1 ACP1 8' - 0"

140 VEST 58 SF WOC RB1 PT1 PT1 PT1 PT1 GYP BD - PT4 8' - 0"

141 OPEN OFFICE 1,670

SF

CPT3 RB1 PT2 PT2 PT2 PT2 ACP1 8' - 0"

142 VEST. 39 SF WOC1 RB1 PT1 PT1 PT1 PT1 ACP1 8' - 0"

143 SHOP 215 SF CONC2 RB1 PT1 PT1 PT1 PT1 ACP1 8' - 1"

144 OPEN OFFICE 1,158

SF

CPT3 RB1 PT2 PT2 PT2 PT2 ACP1 8' - 0"

145 BREAK RM 232 SF PRC2 RB1 PT1/AWP1 PT1 PT1 PT1 ACP1 8' - 0" ACOUSTICAL WALL PANELS TO REDUCE NOISE. INSTALL

FROM COUNTER BACKSPLASH TO CEILING..

146 JANITOR 33 SF CONC1 RB1 PT1/FRP1 PT1/FRP

PT1/FRP

PT1/FRP1 EXP STRUCT -

PT4

10' - 0"

147 ELEC. 29 SF CONC1 - PT1 PT1 PT1 PT1 EXP STRUCT -

PT4

10' - 0"

148 OFFICE 162 SF CPT3 RB1 PT1 PT1 PT1 PT3 ACP1 8' - 2"

149 CMNDR. 222 SF CPT3 RB1 PT2 PT2 PT2 GL ACP1 8' - 0"

150 CHF. 122 SF CPT3 RB1 PT1 PT1 PT1 GL ACP1 8' - 0"

151 1ST SGT. 122 SF CPT3 RB1 PT1 PT1 PT1 GL ACP1 8' - 0"

152 OFFICE 248 SF CPT3 RB1 PT1 PT3 PT1 PT1 ACP1 8' - 0"

153 VEST 33 SF WOC1 RB1 PT1 PT1 PT1 PT1 GYP BD - PT4 8' - 0"

154 MECH 188 SF CONC1 RB1 PT1 PT1 PT1 PT1 ETR 10' - 0"

155 ELEC 45 SF CONC1 RB1 PT1 PT1 PT1 PT1 ETR 8' - 0"

156 CORR 413 SF PRC1/PRC

PRCB1 PT2 PT2 PT2 PT2 ACP1 8' - 0"

157 UNISEX 67 SF PRC2 TR2 PRC3 PRC3 PRC4 PRC3 GYP BD - PT4 8' - 0"

158 SHOWER 48 SF PRC2 TR2 PRC3 PRC3 PRC3 PRC3 GYP BD - PT4 8' - 0"

159 AFM 243 SF CPT3 RB1 PT1/GL PT1 PT1 PT1 ACP1 8' - 1"

160 WX 197 SF CPT3 RB1 PT1 PT1 PT1 PT2 ACP1 8' - 0"

161 SERE 200 SF CPT3 RB1 PT1 PT1 PT1 PT2 ACP1 8' - 0"

162 HARM 384 SF CPT3 RB1 PT1 PT1 PT1 PT2 ACP1 8' - 0"

163 BRIEFING 104 SF CPT3 RB1 PT1 PT3 PT1 PT1 ACP1 8' - 0"

164 BRIEFING 108 SF CPT3 RB1 PT1 PT3 PT1 PT1 ACP1 8' - 0"

165 SPECIAL OPS

(S.O.S.)

2,180

SF

CPT3 RB1 PT2 PT2 PT2 PT2 ACP1 10' - 0"

166 MISSION

PLANNING

333 SF CPT3 RB1 PT2 PT2 PT2 PT2 ACP1 8' - 0"

167 VEST. 19 SF WOC RB1 PT1 PT1 PRC PT1 GYP BD - PT4 8' - 0"

168 OFFICE 226 SF CPT3 RB1 PT3 PT1 PT1 PT1 ACP1 8' - 0"

169 OFFICE 767 SF CPT3 RB1 PT1 PT3 PT3 PT1 ACP1 8' - 0" PROVIDE WPF1 AT EXTERIOR WINDOWS 170 SEC COMM 267 SF ETR EXIST ETR ETR ETR ETR EXP STRUCT 9' - 10" PATCH EXISTING FLOOR AND PAINT EXISTING WALLS AS

NEEDED. MATCH EXISTING FNISHES AS CLOSELY AS

POSSIBLE AS ALL NEW FINISHES ARE NOT EXPECTED.

CEILING TO BE OPEN TO STRUCTURE.

171 VEST 76 SF WOC1 RB1 PT1 PT1 PT1 PT1 GYP BD - PT4 8' - 1"

172 A/V ROOM 21 SF CPT1 RB1 PT1 PT1 PT1 PT1 GYP BD - PT4 8' - 0"

173 A/V ROOM 21 SF CPT1 RB1 PT1 PT1 PT1 PT1 GYP BD - PT4 8' - 0"

174A MULTI-USE 780 SF RAF/CPT2 RB1 PT1 PT1 PT3 PT1 ACP1 10' - 0" FOLDING PARTITION FINISHES AS SHOW ON MATERIAL

LEGEND. CARPET WILL BE INSTALLED ON THE RAISED

ACCESS FLOOR AT THE RAF FACTORY. PURCHASE CPT

FOR RAISED ACCESS FLOOR AND STAGE FROM SAME

DYELOT SO THERE IS NO CHANGE OF COLOR..

174B MULTI-USE 780 SF RAF/CPT2 RB1 PT1 PT1 PT3 PT1 ACP1 10' - 0" FOLDING PARTITION FINISHES AS SHOWN ON MATERIAL

LEGEND. CARPET WILL BE INSTALLED ON THE RAISED

ACCESS FLOOR AT THE RAF FACTORY. PURCHASE CPT

FOR RAISED ACCESS FLOOR AND STAGE FROM SAME

DYELOT SO THERE IS NO CHANGE OF COLOR..