This is an interior elevations drawing sheet (AE411) showing detailed wall elevations for various rooms in Building 1040 at Will Rogers Air National Guard Base. The drawing includes six elevation views showing dimensions, heights, and placement of fixtures, finishes and equipment for rooms 134, 103, and 145.

The sheet contains comprehensive general notes and keynotes detailing specifications for interior finishes, clearances, and installations. Key requirements include: all interior dimensions measured from face of wall finish to face of wall finish, no exposed tile edges permitted, contractor responsibility for field verification of dimensions, and government-furnished/contractor-installed items like paper towel dispensers, soap dispensers and toilet paper dispensers. Specific material callouts include porcelain wall tile, high pressure laminate, paint, acoustical wall panels, and solid surface countertops. The drawing also indicates ADA compliance requirements with specific clearances and fixture heights noted. This sheet is part of a larger renovation project dated September 12, 2024, with Addendum 01 issued February 17, 2025.

View the file

Other files

File Type Posted
Abstract (Final).pdf PDF
Amendment 3 Attachment 1 - Bldg 1040 Reno Questions and Answers.docx DOCX document
Solicitation Amendment 3 W50S8T25BA0110003.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 1.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 2.pdf PDF
Amendment 2 Attachment 2 - 09 72 00.pdf PDF
Amendment 2 Attachment 5 - IN600 - INTERIORS MATERIALS LEGEND.pdf PDF
Amendment 2 Attachment 3 - A-002 - PARTITION TYPES.pdf PDF
Amendment 2 Attachment 6 - Bldg 1040 Reno Questions and Answers.xlsx XLSX spreadsheet
Amendment 2 Attachment 1 - Addendum 02 Narrative.docx DOCX document
Solicitation Amendment 2 W50S8T25BA0110002.pdf PDF
Amendment 2 Attachment 4 - 08 11 16.pdf PDF
06 20 00.pdf PDF
21 13 13.pdf PDF
IN101 - FLOOR FINISH PLAN - SECTOR A.pdf PDF
Bldg 1040 Reno Questions and Answers - FSB and GOV Reponses.xlsx XLSX spreadsheet
EL101 - ELECTRICAL INTERIOR LIGHTING PLAN - SECTOR A.pdf PDF
AE102 - FLOOR PLAN - SECTOR A.pdf PDF
AE502 - DETAILS.pdf PDF
AE403 - ENLARGED PLANS.pdf PDF
10 21 13.pdf PDF
10 51 13.pdf PDF
08 41 13.pdf PDF
AE103 - FLOOR PLAN - SECTOR B.pdf PDF
08 81 00.pdf PDF
AE402 - ENLARGED PLANS.pdf PDF
AE601 - DOOR SCHEDULE AND DETAILS.pdf PDF
26 05 73.pdf PDF
08 11 16.pdf PDF
AE602 - OLI 1 - EXTERIOR WINDOW FRAMES.pdf PDF
Addendum 01 Narrative.docx DOCX document
08 71 00.pdf PDF
IN102 - FLOOR FINISH PLAN - SECTOR B.pdf PDF
Solicitation Amendment 1 W50S8T25BA0110001 SF 30.pdf PDF
06 41 16.00 10.pdf PDF
AE201 - BUILDING ELEVATIONS.pdf PDF
TABLE OF CONTENTS.pdf PDF
A-002 - PARTITION TYPES.pdf PDF
01 45 35.pdf PDF
FA601 - FIRE ALARM - MASS NOTIFICATION RISER DIAGRAM.pdf PDF
AE151 - REFLECTED CEILING PLAN - SECTOR A.pdf PDF
AE600 - ROOM FINISH SCHEDULE.pdf PDF
10 51 16.pdf PDF
30 Jan 25 Site Visit Sign In Sheet.pdf PDF
BLDG 1040 Renovation Site Visit Slides 30 January 25.pptx PPTX presentation
ATTACHMENT 3 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 2.pdf PDF
Solicitation - W50S8T25BA011.pdf PDF
ATTACHMENT 2 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 1.pdf PDF
Bidders Checklist.docx DOCX document
ATTACHMENT 1 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_DRAWINGS.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

A. ALL INTERIOR DIMENSIONS ARE FROM FACE OF

WALL FINISH TO FACE OF WALL FINISH - U.N.O.

B. REFER TO SHEETS AE600 ROOM FINISH

SCHEDULE AND IN600 INTERIOR MATERIALS

LEGEND FOR BASIS OF DESIGN INTERIOR

FINISHES, MATERIALS, PATTERNS AND COLORS.

C. THERE SHALL BE NO EXPOSED TILE EDGES.

EXPOSED TILE EDGES SHALL HAVE A SATIN

ANODIZED ALUMINUM FINISH TRIM.

D. USE GRIDS PROVIDED FOR BASIS OF WALL TILE

INSTALLATION.

E. CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFICATION OF ALL DIMENSIONS AND MUST

NOTIFY ARCHITECT IMMEDIATELY OF ANY

DISCREPANCIES BETWEEN FIELD CONDITIONS

AND THESE DRAWINGS.

F. REFER TO MECHANICAL, ELECTRICAL, AND

PLUMBING DRAWINGS FOR INFORMATION

RELATING TO DEVICES AND FIXTURES.

G. CORNER GUARDS ARE NOT SHOWN IN INTERIOR

ELEVATIONS FOR GRAPHIC CLARITY, PROVIDE AT

OUTSIDE CORNERS OF GYPBOARD WALLS.

H. CONTRACTOR SHALL VERIFY ALL REQUIRED

CLEARANCES FOR FIXTURES AND/OR EQUIPMENT

SHOWN AND ENSURE CORRECT FIT.

I. GF/GI = GOVERNMENT FURNISHED /

GOVERNMENT INSTALLED. REFER TO SHEET IF

101 AND IF102 FURNITURE PLANS WHERE THE

FURNITURE SCHEDULE INDICATES ITEMS THAT

ARE GF/GI.

J. TOILET ACCESSORIES ARE CONTRACTOR

FURNISHED / CONTRACTOR INSTALLED, EXCEPT

FOR GOVERNMENT PROVIDED DISPENSERS,

INCLUDING PAPER TOWEL DISPENSERS, SOAP

DISPENSERS AND TOILET PAPER DISPENSERS.

THESE WILL BE INSTALLED BY THE CONTRACTOR.

COORDINATE INSTALLATION OF THESE WITH THE

GOVERNMENT.

K. CENTER FIRST ACOUSTICAL WALL PANEL ON

WALL. CUT SUBSEQUENT PANELS TO FIT.

L. CENTER TV MOUNT ON WALL IN BREAK ROOM.

CUT ACOUSTICAL PANELS TO FIT TV MOUNT

BRACKET. ENSURE DATA AND POWER ARE

INSTALLED WITHIN CUTOUT.

M. IN BREAK ROOM 103, INSTALL AWP1 FROM

FLOOR TO CELING..

SHEET KEYNOTES

1. TOILET PARTITION, TYP.

2. GRAB BARS - 36" BACK WALL, 42" SIDE WALL

3. TOILET PAPER DISPENSER, GF/CI

4. NOT USED

5. SANITARY NAPKIN DISPOSAL.

6. ADA URINAL

7. URINAL SCREEN

8. ROBE HOOKS (2)

9. ADA WATER CLOSET, WALL MOUNTED

10. ADA SHOWER W/GRAB BAR AND SHOWER SEAT

11. ADA DRINKING FOUNTAIN

12. RECESSED CELL PHONE LOCKER

13. SINK AND FAUCET

14. MANUAL PAPER TOWEL DISPENSER, GF/CI

15. UTILITY SHELF

16. MOP SINK (NOT SHOWN)

17. MIRROR (18" X 30") CENTER OVER SINK

18. WATER HEATER

19. SHOWER CURTAIN AND ROD

20. SHOWER INSERT, SOLID SURFACE WALLS AND

PREFORMED TERRAZZO BASE. REFER SHEET IF600

FOR MATERIALS.

21. 30" X 48" ADA CLEARANCE

22. 5'-0" ADA CLEARANCE

23. URINAL

24. SOAP DISPENSER, GF/CI

25. SOLID SURFACE COUNTERTOP

26. WALL MTD TOILET, NON-ADA

27. LOCKER BENCH,42" W X 20" D

28. CLEAN OUT

29. PORCELAIN WALL TILE

30. HIGH PRESSURE LAMINATE

31. PAINT

32. CEILING AS SCHEDULED

33. WALL BASE AS SCHEDULED

34. TILED HIDDEN ACCESS PANEL (SYSTEM)

CONCEALED ACCESS FOR WATER ARRESTOR

HAMMER

35. FLOOR DRAIN FOR ICE MAKER.

GROUND FLOOR

100'-0"

5'-7 7/8" 3'-6" 2'-9" 2'-9"

3" MIN

2'-6"2'-6" 2'-7"

2'-0"

2' -3

1'

-1 0"

2' -1

0"

AE420

C4

SIM

AE420

A2

SIM

AE420

A4

SIM

SSM1

RB1

PLAM1

PT1

IM1

REF1

PTD2 CM1

MC1SD1

PLAM1

14 24

GROUND FLOOR

100'-0"

3'-6"

2' -3

1'

-1 0"

2' -1

0"

2'-0"

3" MIN

SSM1

RB1

PLAM1

PT1

CM1 MC1

AD

A

H

EI

G H

T

2' -1

0"

ACOUSTICAL

WALL PANEL

TV2

4' -6

1' -8

GROUND FLOOR

100'-0"

2' -1

0"

EQEQEQEQ

AE420

C2

PAINT AS

SCHEDULED

4'-0"4'-0"4'-0"

AWP1 AWP1

4'-0" 4'-0" 4'-0"

PT1

TV2

4' -6

GROUND FLOOR

100'-0"

2'-0"2'-9" 2'-6"

3" MIN

2' -3

1'

-1 0"

2' -1

0"

AE420

A4

SIM

SSM1

RB1

PLAM1

PT1

MC1

CM1

GROUND FLOOR

100'-0"

3'-6"

2' -3

1'

-1 0"

TO

R

IM

O

F

SI

N K

2' -1

0"

2'-9"

3" MIN

2'-0"

AE420

C4

SIM

AE420

A2

SIM

AE420

A4

SIM

PLAM1

SSM1

RB1

PLAM1

PT1

REF1 IM1

PTD2

CM1

MC1 SD1

2'-6"2'-6"

GROUND FLOOR

100'-0"

2' -1

0" 1'

-1 0"

2' -3

3'-0"3'-0"

3'-0" 3'-0" 3'-6" 1'-10" 3'-7"

AE420

C4

SIM

AE420

B4

SIM

AE420

A2

SIM

AE420

A4

SIM

MC1

SECURITY

CONSOLE

PLAM1

SSM1

PT1

RB1

CM1 PTD2

SD1

REF1

14 24

FILLER

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

2020-484-00

NDM

Re pa ir/ Co nv er t S qu ad O ps Ok lah om a C ity

, O K

NG

BJ

V/

OK

A

NG

PN: YZEU142025

C :\U sers\bkg\D o cum ents\M y R evit\048400_AR C

H

_BG

allagher5SB23.rvt

2/14/2025 8:31: 16 AM

12 SEPTEMBER 2024

INTERIOR ELEVATIONS

AE411

MJT

MRT

JO

0 1' 2' 4'

1/2" = 1'-0"SCALE: 1/2" = 1'-0"

RM 145 - ELEVATIONA3SCALE: 1/2" = 1'-0"

RM 145 - ELEVATIONA2

SCALE: 1/2" = 1'-0"

RM 145 - ELEVATIONB3SCALE: 1/2" = 1'-0"

RM 103 - ELEVATIONB2

SCALE: 1/2" = 1'-0"

RM 103 - ELEVATIONC3SCALE: 1/2" = 1'-0"

RM 134 ELEVATIONC2

2 ADDENDUM 01 02/17/2025

File details come from the government source that posted it. Updated .