Bldg 1040 Reno Questions and Answers - FSB and GOV Reponses.xlsx
XLSX spreadsheet 31 KB Posted
- Solicitation number
- W50S8T25BA011
- Issued by
-
Department of the Army National Guard
About this file
This document is a Questions and Answers file related to renovations of Building 1040 at Will Rogers Air National Guard Base in Oklahoma City. The Q&A addresses technical clarifications about fire protection systems, secure areas, hardware specifications, telecommunications requirements, and mechanical/electrical systems.
Key technical points include: no hazardous materials abatement is required, ICD-705 SCIF requirements are not applicable, roof drains only need cleaning not replacement, and telecommunications cabling will be owner-furnished with contractor providing rough-in only. Specific clarifications cover fire zone control valve locations, hardware requirements for doors, corner guard installations, secure boundary specifications, and BACnet control system requirements. The document also addresses questions about window specifications, millwork details, ceiling requirements, lighting controls, and generator specifications. Notable deadline information includes a pre-bid conference on January 27, 2025 at 10:00 CST and bid submission deadline of February 27, 2025 at 10:00 CST, with no electronic or fax bids accepted.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| TITLE: Renovate Bldg 1040 | |
| QUESTIONS | ANSWERS |
| Drawing F-001 Zone 3 Hatching excludes: |
a. 129 Vestibule – Included in FX101 Fire Protection Schedule – Sector A , Note 7
b. 130 Men – Included in FX102 Fire Protection Schedule – Sector B, Note 5b.
| Please clarify Zone of these two rooms. | Room 129 and 130 are not inside the secure boundary of Zone 3. See sheet AE150 for secure boundary locations. |
| Drawing F-001 Zone 1, 2, 3 & 4 Zone Control Valve Assemblies. |
a. Are Zone control valve assemblies to be installed inside or outside of the hazard areas?
b. Are zone control valve assemblies to be installed above ceiling, or along wall below seven feet above finished floor?
| c. | If zone control valve assemblies are installed above ceiling, will portable ladder access be acceptable, or will special access be required to reach valves? | Zone control valves are to be installed above the ceiling outside of the secure area. |
| Specification 21 13 13 § 2.3.4.2 requires check valves to meet the requirement of MSS SP-71 for Type 3 or 4. This requires check valves to be flanged connection, with no ports for drains. There are a limited number of manufacturers (1 or 2) for these type check valves. These type check valves are not economical. May check valves that are UL listed for Fire Protection or FM approved for fire protection that do NOT meet the requirement of MSS SP-71 for Type 3 or 4 be utilized? | The UFGS requires check valves to meet the requirements of MSS SP-71 type 3 & 4. MSS SP-71 type 3 listed valves have a “clear” waterway, meaning that with full flow the hangar assembly will clear the waterway entirely. This must be met unless there are no products available. | |
| Plan Sheet AE602 shows an Aluminum Storefront “E”. Please advise us of the location that this storefront is to be installed. | Storefront 'E' is an extra elevation and not included in the project. Sheet AE602 has been modified to eliminate Storefront 'E'. See Addendum 01. | |
| In the hardware schedule the x-10 lock is not listed in hardware set #14, but door #169A is listed as getting then x-10 lock. | Hardware set #14 is revised to show an X-10 lock. See Addendum 01. | |
| Hardware set #15 is listed as getting the x-10, but door #129A is not listed as getting the x-10 lock on the door schedule. | Hardware set #14 is revised to show an X-10 lock. See Addendum 01. | |
| In set #16, the x-10 lock is not listed in the individual parts but is listed in the operational section. | Hardware set #16 is revised to show an X-10 lock. See Addendum 01. | |
| Section 8 11 13 page 5. |
2.5.1 Hardware for Secure Doors
a. Secure rated doors must have all hardware prepared and installed on the door at the factory, and shipped to the site as part of the door assembly.
| b. Which doors would be considered "Secure Doors"? | Doors with required STC ratings should be a sound-rated door and arrive on site as a pre-assembled factory unit with hardware that is integral to the sound performance of the scheduled door assembly. |
| I have noticed that there is a disparity between the specifications and drawings in terms of the number of doors that require access control. The specifications call for 33 and the drawings call for 29. |
| a. Which number would you like to differ? | Refer to sheets TY-101 and TY-102 for doors that require access control. This should be the 33. See Addendum 01. | |
| Where are the Corner Guards Specified in Division 10 26 00 to be installed? | Corner Guards are to be installed at all outside corners of gypsum board walls per General Note G Sheets AE401, AE402, AE403, AE410 and AE411 and Interior Material Legend (Basis-of-Design/Equivalent) under Miscellaneous CG1. | |
| Will there be any asbestos abatement, LBP removal, or mold remediation within the scope of work? | No known hazards | |
| Sheet AE102 & AE103 Keynote 12 instructs the contractor to verify the existing conditions of the walls at the vault area, and repair to 1 hour rated fire assembly. ICD-705 limits the suitable methods of construction for vault walls, floor and ceiling to a higher standard. For pricing purposes, should the contractor assume that a 1 hour rated wall will meet the CTTA requirements for the space? | The walls in question are not required to meet ICD-705, but they will need to be upgraded (if needed) to meet a 1-hour rating. | |
| Compliance with ICD-705 is noted only in the fire alarm sheets. The word “Secure” along with items typical of a SCIF are noted in the architectural sheets. Countermeasures relevant to radio frequency in ICD-705 and ICS-705-1 are not referenced in contract documents. Other divisions (eg. HVAC, Electrical, Plumbing, etc) do not minimize penetrations into and out of the secure areas as required by ICD-705 and or ISC-705-1. For pricing purposes, is it acceptable for the contractor to assume that countermeasures not shown in the documents are not applicable to the project? | ICD-705 is not a requirement for any of the secure boundary walls. | |
| Per spec section 230923.02 BACNET Direct Digital Control for HVAC and other Building Control Systems, please approve AuomatedLogic as a manufacturer. | Provide conrol systems as specified in 230923.02. Pre-approvals shall not be given. | |
| Drawing FA601 references ICD 705 for secure penetrations. |
a. Specification 21 13 13 § 1.1 references ICS 705-1.
b. Are SCIF requirements applicable to any trade other than Fire Alarm?
| c. If so, please identify which trades other than fire alarm are required to comply with SCIF penetration requirements. | Will remove all mentions of ICD 705 from documents. All requirements are shown in detail as needed at secure perimeters. No SCIF is indicated for the project. See Addendum 01. | |
| Section 01 45 35, 1.2 General Requirements – This section indicates required Special Inspections are list on Sheets G-003 and G-004 of the drawings. These sheets are not included in the drawings issued. Please confirm that the Special Inspections listed on Sheets G-201 and G-202 are the only special inspections required on this project. | Specification updated to correct sheet numbers to G-201 and G-202. See Addendum 01. | |
| Section 11 94 10 Rooftop Fall Protection Anchors, 1.3 System Description indicates quantities and locations are shown on the drawings. A roof plan indicating this information is not found in the documents. Please provide a Roof Plan indicating the quantity and locations for the fall protection anchors. | Rooftop fall protection is not part of this scope and will be removed from the project specifications. See Addendum 01. | |
| Sections 10 51 13 and 10 51 16 appear to be specifications for the Cell Phone Lockers. Which takes precedent. | Specification 10 51 13 has been modified to remove the cell phone lockers section. See Addendum 01. | |
| Sheet AE102 Floor Plan Sector A - please confirm that the two (2) exterior windows near Column Line D between Column Line 2 and 4 are Type “A” windows. | This is correct. The two exterior storefront systems near grid 'D' are type 'A; windows. Sheet AE102 has been revised with the correct window tags. See Addendum 01. | |
| Please provide the location of exterior window Type “E”. | Exterior window type 'E' does not exist on the project and has been eliminated from sheet AE602. See Addendum 01. | |
| Please provide information related to glazing Key Note “4” shown on Sheets AE601 and AE602. | Keynote '4' on sheet AE601 and AE602 have been revised to show glass types. See revised sheets AE601 and AE602 with revised glazing notes.See Addendum 01. | |
| Please clarify if the “STAINLESS STL (STL)” note on Sheet AE601 is relevant. | The stainless Steel note on sheet AE601 is irrelevant and has been removed. See Addendum 01. | |
| Sheet AE151 Room 111 shows Accoustic Ceiling Tiles and suspended lighting fixtures. | ||
| Please clarify. | Sheet AE151 has been revised to show the correct lighting. See Addendum 01. | |
| Sheet AE601 Door Schedule - Please confirm for all doors with “Existing to Remain” notes that all existing items, doors, frames and hardware are to remain. | Correct. All doors listed as existing to remain are not to have changed hardware or other systems. | |
| Please clarify in doors Mark 126A and 166A should be marked “Existing to Remain” or if a new door and hardware should be installed in the existing frame. | Doors 126A and 166A are to be new doors. | |
| Sheet A-002, Wall Series Legend – “A” Series indicates an acoustic partition, STC is a priority. No STC rating is shown on the “A” Series details. Also, no STC rating is shown in the Door Schedule for doors located within “A” Series walls. Please clarify. | Wall types 'A' and 'I' have been revised to clarify the intent of the construction. Wall types 'A' are not considered priority STC rated and will not require an STC door or hardware. | |
| Will the sensitivity and value of the assets in any of the following rooms require supplemental fire protection such as an NFPA-2001 Clean Agent System or NFPA-770 Hybrid Fire Suppression Systems to protect the assets prior to the wet-pipe sprinkler system discharging water into these rooms in the event of a fire? |
| a. | 110 Data Center | ||
| b. | 111 Crypto Vault | ||
| c. | 115 Tel / Switch | ||
| d. | 116 Data | ||
| e. | 125 Radio Shop | ||
| f. | 126 ITE | ||
| g. | 126.1 Elec | ||
| h. | 147 Elec | ||
| i. | 170 SEC Comm | ||
| j. | 172 A/V Room | ||
| k. | 173 A/V Room | No, per the TSFPEWG G 3-600-01.01-18 these rooms will be protected with a Very Early Smoke Detection as they are classified as MACII. Please refer to sheet FA101 & FA102 for Air Sampling Control Panel locations. Additionally the TSFPEWG requires wet pipe system coverage for these rooms with control valves outside of the room for system isolation. | |
| What is the basis of design that can install the type of windows being called out in alternate for Line Item 002? | See specification section 08 41 13 Aluminum Framed Entrances and Storefronts. | ||
| Who is the manufacturer for the roofing system in regards to the roof hatch being installed? | |||
| See specification section 05 50 13 Miscellaneous Metal Fabrications, Section 2.6 Roof Hatches (Scuttles). | |||
| Could we get an inspection report or anything that references where the asbestos is located and what is the AB containing material (joint compound, flooring), also quantities. | See response to comment #5. | ||
| Pre-bid Meeting Question | |||
| Will there be any Abatement on the project? | See response to comment #5. | ||
| Pre-bid Meeting Question | |||
| Will this project be required to follow ICD 705 for secure areas? | See response to comment #25. | ||
| Pre-bid Meeting Question | |||
| What are the permits required for the project? | Only for water taps (fire & main) | ||
| Pre-bid Meeting Question | |||
| Are there any CUI documents? If so, how do we handle the transfer & control of those documents? | See response to comment #24. | ||
| Pre-bid Meeting Question | |||
| Where will the laydown & crane access areas be located? | TBD during precon meeting after bid award. Easily coordinated with base as needed. | ||
| Pre-bid Meeting Question | |||
| How are bids being submitted? | Hard copies only. Deadline is 10:00 CST on February 27th, 2025. All mailed bids must be in CE hands before time, not in the mail to be accepted. Contractors responsibility to confirm bids received on time. | ||
| Pre-bid Meeting Question | |||
| Is there exsiting roof access, i.e. roof hatch & ladder? | Yes | ||
| Pre-bid Meeting Question | |||
| Will this comm vault need to be operational during construction? If so, will we need escorted? | Yes & Yes. All work in the area will require an escort & supervision. | ||
| Pre-bid Meeting Question | |||
| Will there be any other areas other than the comm with will need coordination for access? | No, the rest of the building will be cleared for construction. | ||
| Pre-bid Meeting Question | |||
| Will the sign-in sheet be made available? | Yes, sign-in sheet will be loaded onto the SAM.gov site. | ||
| Do you all have a manufacturer of choice for the data cable and connectivity? | There is no manufacturer of choice. Please refer to project specifications under Division 27 for cabling manufacturer performance and compliance requirements. | ||
| Both Cat6 and Cat6A are listed, are you needing both or was that just a typo? | CAT6 and CAT6A are intentionally listed based on the application requirements. | ||
| Do you have a manufacturer of choice for the fiber optic cable and connectivity? | There is no manufacturer of choice. Please refer to project specifications under Division 27 for cabling manufacturer performance and compliance requirements. | ||
| Are you needing SM and MM on the fiber? Again, both options are listed. | All telecommunications cabling by Owner. Contractor telecommunications rough in only. Contractor to coordinate with base to ensure rough-in match their needs. Refer to T-101 and T-102 General Note P. | ||
| Do you have a manufacturer of choice for the cable pathway materials? cable tray, j-hooks, etc… | There is no manufacturer of choice. Please refer to project specifications under Division 27 for cabling manufacturer performance and compliance requirements. | ||
| Millwork Material & Finish | |||
| The millwork drawings (Document: ATTACHMENT 1 - Drawings, Sheet AE420) reference laminate and wood veneer options, but the specifications (ATTACHMENT 2, Section 06 20 00) require NAAWS Custom Grade millwork. | |||
| Should all casework be fabricated to AWI Custom Grade standards, or are there any areas requiring Premium Grade? | Refer to Spec Section 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets for all cabinet requirements. See Addendum 01. | ||
| The wood finish specifications require a clear factory finish but do not specify whether stain, lacquer, or polyurethane should be used. | |||
| Can you confirm the required finish type and sheen level for exposed millwork? | Refer to Spec Section 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets for all cabinet requirements. See Addendum 01. | ||
| The cabinet hardware schedule (hinges, pulls, slides) is missing from the specifications. | |||
| Can the design team provide details on the required brand and model numbers? | We are unable to specify brand names due to ECB No. 2022-1 Issued 07 Jan. 22 Subject: Prohibitions in the Use of Brand Name (or Equal) references in solicitations. Refer to Spec Section 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets for all cabinet hardware requirements. | ||
| The millwork details (Document: ATTACHMENT 1 - Drawings, Sheet AE420) require field verification before fabrication. | |||
| Should all casework be fully shop-assembled before delivery, or can some be field-assembled? | Casework should be shop-assembled as much as possible. Some field assembly, including installation of filler panels (scribe) is to be expected. | ||
| The specifications state that cabinet edge banding must match the laminate color. | |||
| Can you confirm if 3mm PVC edge banding is required, or is thin laminate edge banding acceptable? | Refer to Spec Section 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets 2.5 Edge Banding for requirements. 0.125 inch thick PVC vinyl edgebanding is required per the specification. | ||
| Drawings mention cleaning existing roof drains, but do not specify if additional capacity or replacements are required. Can you confirm? | |||
| References: | |||
| Specifications Vol. 1 (Section 22 00 00, Pages 1-2) | |||
| Drawings (Sheet P-105 - Roof Plumbing Plan) | |||
| Roof drains are to be cleared and cleaned of any debris. They are not required to be replaced and no further roof drains are planned. If a roof drain is beyond repair it is to be brought to the attention of the base Contracting Officer. | |||
| Can you confirm the final exterior window and door specifications? Drawings indicate storefront, triple-pane, laminated glazing, but specifications lack clarity on frame materials, security ratings, and impact resistance. | |||
| References: | |||
| Solicitation Document (Section 00 00 00, Page 3) | |||
| Specifications Vol. 1 (Section 08 41 13, Pages 1-2) | |||
| Drawings (Sheet AE201 - Exterior Elevations) | Specification 08 41 13 requires storefront system to meet ASTM F162/F162M ratings for airblast. BKG | ||
| The door schedule (Document: ATTACHMENT 1 - Drawings, Sheet AE601) references security doors but lacks details on access control requirements. | |||
| Should all security doors be prepped for card readers, or will a separate contractor handle electronic hardware? | See door hardware schedule Specification section 08 71 00. BKG | ||
| The door hardware specification (Document: ATTACHMENT 2, Section 08 71 00) lists panic devices and closers but does not specify which doors require them. | |||
| Can you provide a door-by-door schedule confirming where panic hardware is required? | The doors that require panic devices (exit devices) are listed in the door hardware schedule at the end of Specification 08 71 00 Section 3.6. BKG | ||
| The aluminum-framed storefront system (Document: ATTACHMENT 2, Section 08 41 13) requires compliance with ASTM E330 for wind loads. | |||
| Has the structural analysis been completed for wind load calculations, or will the contractor be required to submit shop drawings for review? | No structural analysis has been done to determine the loading requirements of the storefront system due to wind loads. The new storefront systems are to be mounted with existing framing system provided with the old windows. Shop drawings will be required for review using the existing structural system. BKG | ||
| The storefront glazing system (Document: ATTACHMENT 2, Section 08 41 13) specifies thermal break aluminum frames but does not clarify if low-e glazing is required. | |||
| Can you confirm the glass type, U-factor, and SHGC requirements for storefronts? | Glazing requirements for Insulated Glazing at Alum Storefront systems are described in Specification Section 08 81 00 Glazing, Section 2.2. BKG | ||
| The door frame protection requirements (Document: ATTACHMENT 2, Section 08 34 73) mention sound-rated door frames but do not specify the STC rating. | |||
| Can you confirm the minimum STC rating required for all acoustically rated doors? | The STC ratings are listed on the Door Schedule sheet AE601. BKG | ||
| The specifications call for Level 5 finish on all walls receiving eggshell or gloss paint but do not define critical lighting conditions. | |||
| Can the design team provide a reflected ceiling plan to determine where Level 5 finishing is required? | Level 5 finishing is required in all occupied spaces, corridors, offices, assembly/conference rooms, etc. | ||
| The suspended ceiling specifications (Document: ATTACHMENT 2, Section 09 51 00) require a minimum NRC of 0.80 but do not specify tile dimensions. | |||
| Should all acoustic ceiling tiles be 2' x 2', or are 2' x 4' tiles acceptable? | Refer to Specification 2.2 Acoustical Units; 2.2.1.6 Nominal Size 24 by 24 inch. Also refer to drawings, Reflected Ceiling Plans AE150-AE152 Typical Ceiling Legend indicates 2' x 2' ceiling grid. Interior Materials Legend IN600 ACP1 Size: 24" x 24" x 1" | ||
| The ACT system is required to meet ASTM E84 for flame spread. | |||
| Will the Government accept alternate ceiling tiles that meet Class A but have different texture or color? | Alternate Ceiling Tiles that meet all salient characteristics indicated in specification and basis-of-design will be considered. In addition to meeting flame spread, alternates must meet all characteristics listed in 2.2.1.1 Type ACP1. Color must be white | ||
| Fire-Rated Wall (R6) Heights |
Reference Documents: (Attachment 1 – Drawings (Provide specific sheet numbers if available), Attachment 2 – Specifications (Section 09 29 00, Section 07 84 00, and applicable details)
| The drawings indicate that R6 fire-rated walls must extend to the roof deck, but exact floor-to-deck heights are not clearly stated in all locations. | |
| Please confirm the specific heights for all R6 walls | |
| Any specific UL-listed head-of-wall firestopping details that need to be followed | The wall to deck heights throughout the building are generally just over 12'-0" high per as-built drawings. These heights are not consistent and should be field verified. The wall to deck heights in the Multi-use Room 174 are generally 14'-0" and will also be required to be field verified. UL head of wall firestopping details will be added to the wall partitions drawing A-002. |
| The toilet partition specifications (Document: ATTACHMENT 2, Section 10 21 13) require HDPE partitions but do not confirm mounting methods. | |
| Should partitions be floor-mounted or ceiling-hung? | Partitions to be floor mounted overhead braced per specification. See 2.4 Overhead- Braced Partitions. Also refer to Interior Elevations C1/AE410 and C3/AE410 for depictions of partitions which show partition mounting styles. |
| The grab bars and toilet accessories (Document: ATTACHMENT 2, Section 10 21 13) must comply with ADA requirements, but exact mounting heights are missing. | |
| Can the team confirm the required heights for grab bars, mirrors, and dispensers? | Refer to A-001 Mounting Heights |
| Acoustical Wall Panels | |
| The Room Finish Schedule (Document: ATTACHMENT 1 - Drawings, Sheet AE600) states that Break Room 145 is to receive Acoustical Wall Panels (AWP1). However, the Enlarged Plan AE403 does not specify which wall should receive the panels. | |
| Can the design team confirm which wall in Break Room 145 should receive AWP1? | Refer to Refer to Elevation B3/AE411 and Floor Finish Plans IN101 and IN102 for extent of AWP1. See Addendum 01. |
| The specifications for Acoustical Wall Panels (AWP1) (Document: ATTACHMENT 2, Section 09 72 00) indicate 1-inch-thick fiberglass panels with a minimum NRC of 0.80, but there is no mention of required manufacturers or acceptable alternatives. | |
| Can the design team confirm whether specific manufacturers are pre-approved or if substitutions are permitted? | Substitutions are permitted that meet the salient features of the basis-of-design product. Substitutions must meet characteristics listed in specification. See 2.2 Acoustical Wall Panel (AWP1) |
| The interior signage specifications (Document: ATTACHMENT 2, Section 10 14 00.20) require tactile letters and Braille, but do not specify font and character height. | |
| Can you confirm the required font type, letter size, and mounting height for room identification signs? | Refer to sheet IG501 signage details, which include font style and text height. Refer to Sheet IG502 for Signage Mounting details, which include mounting heights. |
| The signage specification mentions cybersecurity compliance, but there are no details on what this entails. | |
| Does the signage system require network integration or electronic displays, or is this a reference to general facility security? | No signs are currently identified to require integration. Spec will maintain in the event if directed to incorporate from the base. |
| Are there any areas that require special fire protection systems (e.g., clean agent suppression for data rooms/security vaults)? |
References:
| Specifications Vol. 2 (Section 21 13 13, Pages 1-5) | |
| Drawings (Sheet FX101 - Fire Suppression Plan) | See response to comment #43. |
| The specifications mention that a makeup water analysis is required for boiler water treatment, but it does not explicitly state whether a water softener is required for makeup water. | |
| Please confirm if a water softener is required for the makeup water supply. |
Reference:
| Document: Attachment 3 - Specifications Volume 2 | |
| Section: 23 64 26 – Chilled, Chilled-Hot, and Condenser Water Piping Systems | |
| Page: 23 64 26-2 | Provide makeup water analysis and treatment as specified. |
| Chilled Water Treatment – Is It Required? | |
| The boiler loop requires chemical treatment, but no specifications were found for chilled water treatment. | |
| Please confirm whether chilled water treatment is required, or if treatment is only necessary for the boiler loop. |
Reference:
| Document: Attachment 3 - Specifications Volume 2 | |
| Section: 23 64 26 – Chilled, Chilled-Hot, and Condenser Water Piping Systems | |
| Page: 23 64 26-2 | Chilled water treatment is not required Section 23 64 26. |
| Heating or Chilled Water Loop Volumes – Available? | |
| The documents provide flow rates for pumps and equipment, but they do not specify loop volumes for the heating or chilled water systems. | |
| Can you provide the total system volume for both heating and chilled water loops? If unavailable, should the contractor estimate and provide this information as part of the submittals? |
Reference:
| Document: Attachment 3 - Specifications Volume 2 | |
| Section: 23 21 23 – Hydronic Pumps | |
| Page: 23 21 23-3 | |
| Drawing: M-701 – Mechanical Schedules | Heating and chilled water loop volumes are unavailable. |
| The specifications confirm that the system is designed for glycol, but it is unclear whether the contractor is responsible for filling it or if it will be maintained by base personnel. | |
| Please confirm if filling the chilled water system with a 50/50 glycol mixture is within the contractor’s scope, or if base maintenance personnel will handle this. |
Reference:
| Document: Attachment 3 - Specifications Volume 2 | |
| Section: 23 64 26 – Chilled, Chilled-Hot, and Condenser Water Piping Systems | |
| Page: 23 64 26-3 | The specifications do not confirm or require any hydronic system is designed for 50/50 glycol water mixture. |
| AHU-3 & AHU-4 – Are They Properly Sized for 50/50 Glycol? | |
| The specifications confirm that AHU-3 and AHU-4 require a 50/50 glycol mixture, but the AHU schedule does not explicitly confirm whether they were sized for glycol. | |
| Please confirm if AHU-3 and AHU-4 were selected and sized for operation with 50/50 glycol. |
Reference:
| Document: Attachment 3 - Specifications Volume 2 | |||
| Section: 23 81 00 – Decentralized Unitary HVAC Equipment | |||
| Page: 23 81 00-5 | |||
| Drawing: M-701 – Mechanical Schedules | The specifications do not confirm any hydronic system is designed for 50/50 glycol water mixture. AHU-3 and AHU-4 are not designed for or require a glycol water mixture. | ||
| Will substitutions be allowed for specified HVAC units if an equivalent model meets performance requirements? | |||
| If so, what is the approval process for alternate equipment that complies with Section 23 81 00 of the specifications (ATTACHMENT 2 - VOL 1, Page 320)? | No specific products are identifieid. HVAC units shall meet the requirements of Section 23 81 00. | ||
| The mechanical specifications (Section 23 07 00) reference insulation requirements, but details on duct vapor barriers are unclear. | |||
| Could you confirm the type and thickness of insulation required for supply and return ductwork in unconditioned spaces? | |||
| (ATTACHMENT 2 - VOL 1, Page 290)? | Vapor barriers shall meet the requirements of Section 23 07 00. Specification begins on page 99. | ||
| Are there specific balancing criteria for Testing, Adjusting, and Balancing (TAB) of HVAC systems beyond the general requirements listed in Section 23 05 93? | |||
| If so, are there any additional TAB reports or acceptance standards required? (ATTACHMENT 2 - VOL 1, Page 275) | Testing, adjusting, and balancing of HVAC systems shall be in accordance with Section 23 05 93. | ||
| The specifications indicate the use of BACnet Direct Digital Controls (DDC) and reference ASHRAE 135 compliance. Johnson Controls Inc. (JCI) is mentioned in some areas. Will other control manufacturers be allowed to bid, provided they meet BACnet interoperability, are BTL listed, and comply with the project requirements (ATTACHMENT 3 - VOL 2, Section 23 09 23.02, Page 45)? | Johnson Controls is not mentioned anywhere in the specifications. Manufacturers shall provide controls that are BACnet, BTL listed and comply with Section 23 09 23.02. | ||
| The panel schedules (Attachment 1 - Drawings, Sheets EP701-EP703) indicate estimated demand and connected loads but do not specify spare capacity. | |||
| Can you confirm the required spare capacity for each panel? | Per UFC 3-520-01, minimum spare capacity to be provided is minimum 15% empty space and 15% spare ampacity. | ||
| Certain existing loads are not shown in the panel schedules (Attachment 1 - Drawings, Sheet EP701). | |||
| Should we assume all existing loads will remain, or will an updated panel schedule be provided? | All existing loads to remain unless noted otherwise on panel schedules or floor plans. | ||
| The electrical one-line diagram does not specify the AIC rating required for the main service panel disconnect (Attachment 1 - Drawings, Sheet EP601). | |||
| Can you confirm the fault current rating for this disconnect? | Main service panel (HDP) has integral main circuit breaker for the service disconnect rated at 35 kAIC per one-line and panel schedule. | ||
| What is the maximum allowable voltage drop for feeders and branch circuits? (Attachment 2 - Specifications Vol. 1, Section 26 20 00, Page 341 | Per UFC-3-501-01 permitted voltage drop for feeders and service conductors must be limited to 3%, branch circuits must be limited to 3%, with no greater than 5% total. | ||
| Is the contractor responsible for providing a short circuit coordination study and confirming proper breaker settings? | |||
| (Attachment 2 - Specifications Vol. 1, Section 26 20 00) | Yes, see new specification section 26 05 73 provided in Addendum 01. | ||
| The electrical one-line diagram and plan views show conflicting generator and transfer switch locations. | |||
| Can you confirm the intended placement? | |||
| References: Specifications Vol. 1 (Section 26 32 15, Pages 1-3) ….&….Drawings (Sheet EP601 - Electrical One-Line Diagram & EP110 - Roof Power Plan) | EP110, EP601 and Specifications Section 26 32 15 do not show generator and transfer switch locations. Refer to ES101 and EP101 for generator and ATS locations. One-line diagram depicts connections between electrical equipment and not locations. | ||
| What is the generator’s fuel source (diesel or natural gas) and the required fuel storage capacity? | |||
| (Attachment 2 - Specifications Vol. 1, Section 26 32 15, Page 360) | Generator fuel source is diesel fuel. Provide 24 hours of run time fuel storage tank. | ||
| The specifications do not state if load bank testing is required for the generator. | |||
| If required, what duration and percentage load should be tested? | |||
| (Attachment 2 - Specifications Vol. 1, Section 26 32 15) | The generator specifications reference testing in accordance with ISO 3046, IEEE 115, and NEMA MG1. These standards outline performance testing for the engine and generator but do not specifically require load bank testing. | ||
| Will the ATS be open-transition or closed-transition? (Attachment 2 - Specifications Vol. 1, Section 26 36 23, Page 365) | ATS to be open-transition per Section 26 36 23 page 5. | ||
| What are the default factory settings for the ATS time delays? | |||
| (Attachment 2 - Specifications Vol. 1, Section 26 36 23, Page 368) | Default factory settings will be provided by the ATS manufacturer. | ||
| Will there be separate ATS units for life safety, critical loads, and mechanical loads? | |||
| (Attachment 1 - Drawings, Sheet EP601) | NEC 700 compliant ATS is not required. All egress lighting and FA are battery backed up. | ||
| Should we assume that all loads will transfer to emergency power during an outage, or will there be specific circuits that remain off? | |||
| (Attachment 2 - Specifications Vol. 1, Section 26 36 23) | All circuits connected downstream of ATS will transfer to emergency power during outage. | ||
| Some LED fixtures are listed as MVOLT 120-277V. | |||
| Should we assume 277V as the standard, or are 120V circuits required? (Attachment 1 - Drawings, Sheet EL601) | LED fixtures and exit signs vary in voltage throughout the building. Refer to reflected ceiling plans and lighting fixture schedule on EP601 . | ||
| Emergency lighting fixtures have a 90-minute battery backup, but the panel schedules do not indicate emergency circuits. | |||
| Should these be connected to generator-backed circuits? (Attachment 1 - Drawings, Sheet EP601) | Battery-Equipped Emergency luminaires do not require to be connected to generator circuits. | ||
| The lighting control schedule references occupancy sensors and daylight harvesting but does not specify placement details. | |||
| Can you confirm sensor placement? (Attachment 2 - Specifications Vol. 1, Section 26 09 23, Page 314) | Refer to reflected ceiling plans EL101 and EL102 for occupancy and daylighting sensor locations. | ||
| Will lighting controls be standalone, or will they be integrated into the Building Automation System (BAS)? (Attachment 1 - Drawings, Sheet EL601) | Lighting controls will be standalone. | ||
| The specifications discuss control strategies but do not confirm if the system is networked. | |||
| Will the lighting controls be fully integrated with BAS or function independently? (Attachment 2 - Specifications Vol. 1, Section 26 09 23) | Lighting control system is not networked. | ||
| The demolition drawings (ED101 & ED102) do not specify a detailed phasing plan. | |||
| Can the design team provide a phased demolition sequence to ensure office areas remain operational? (Attachment 1 - Drawings, Sheet ED101-ED102) | General office areas should be vacant during construction. Coordination with base required. | ||
| If existing panels feeding critical areas are to be demolished, is the contractor responsible for providing temporary power solutions to maintain ongoing operations? (Attachment 1 - Drawings, Sheet EP601) | Contractor is responsible for providing temporary power solutions to maintain ongoing operations in critical areas. | ||
| The specifications require no disruption to data server power. | |||
| Can the design team confirm if redundant UPS systems are in place for continuous operation? (Attachment 2 - Specifications Vol. 1, Section 27 10 00, Page 400) | UPS systems are not in place for continuous operation. | ||
| Can you confirm whether the entire existing data system (wiring, servers, trays, etc.) is to be fully replaced, or are portions being retained? | |||
| References: | |||
| Specifications Vol. 2 (Section 27 10 00, Pages 1-5) | |||
| Drawings (Sheet T-101 - Telecommunications Floor Plan) | All telecommunications cabling by Owner. Contractor telecommunications rough in only. Contractor to coordinate with base to ensure rough-in match their needs. Refer to T-101 and T-102 General Note P. | ||
| Can you confirm the required shielded vs. unshielded twisted-pair cabling? | |||
| (Ref: ATTACHMENT 2 - Project Specifications, Section 27 10 00) | All telecommunications cabling by Owner. Contractor telecommunications rough in only. Contractor to coordinate with base to ensure rough-in match their needs. Refer to T-101 and T-102 General Note P. | ||
| What are the firestopping and conduit pathway requirements for secure data cables? (Ref: ATTACHMENT 2 - Project Specifications, Division 7 & ATTACHMENT 1 - Project Drawings) | Firestopping and conduit pathways to comply with Division 7, 27 and 28 specifications. In addition to NIST SP 800-53, UFC 3-580-01 and UFC 4-010-06 | ||
| Are specific brand-name networking components required, or will equivalent alternatives be accepted? | There is no manufacturer of choice. Please refer to project specifications under Division 27 for manufacturer performance and compliance requirements. | ||
| What are the cybersecurity compliance requirements (e.g., DoD STIG, NIST 800-53, UFC 4-010-06)? | Comply with specifications section 25 05 11.01 | ||
| Will data infrastructure require dedicated surge protection and grounding? | |||
| (Ref: ATTACHMENT 2 - Project Specifications, Section 27 05 26) | Refer to T-601 for grounding requirements and specifications section 27 10 00 for surge protection requirements. | ||
| Are there network security equipment mounting requirements specified? | Refer to specifications section 27 10 00 for equipment mounting requirements. | ||
| Backbone cabling type conflict - ATTACHMENT 2 - Project Specifications (Section 27 13 23) states all backbone cabling must be single-mode fiber, but ATTACHMENT 1 - Project Drawings (T-601) references multimode fiber in certain locations. | |||
| Which is correct? | All telecommunications cabling by Owner. Contractor telecommunications rough in only. Contractor to coordinate with base to ensure rough-in match their needs. Refer to T-101 and T-102 General Note P. | ||
| Cable tray material conflict - ATTACHMENT 2 - Project Specifications (Section 27 05 28.36) specifies aluminum trays, while ATTACHMENT 1 - Project Drawings (T-501) shows steel trays. | |||
| Please clarify. | Spec section 27 05 28.36 specifies steel, T-501 does not indicate steel or aluminum trays. | ||
| ATTACHMENT 2 - Project Specifications (Section 27 10 00) references shielded cabling, but ATTACHMENT 1 - Project Drawings specify unshielded. | |||
| Which is correct? | All telecommunications cabling by Owner. Contractor telecommunications rough in only. Contractor to coordinate with base to ensure rough-in match their needs. Refer to T-101 and T-102 General Note P. | ||
| Data rack placements discrepancy - ATTACHMENT 1 - Project Drawings (T-101) shows different placements than TY-102 (ATTACHMENT 1 - Project Drawings). | |||
| Which location is correct? | TY-102 does not show any rack placement/location. | ||
| Firewall penetration sealants are mentioned in ATTACHMENT 2 - Project Specifications (Division 7), but no reference exists in ATTACHMENT 3 - Project Specifications (Volume 2) for data scope | |||
| should they be included? | Yes, firestop is required to be installed where appropriate and the installation must be done by an approved fire stop installer with labels and shop drawings. See specification 07 84 00. Firestopping and conduit pathways to comply with Division 7, 27 and 28 specifications. In addition to NIST SP 800-53, UFC 3-580-01 and UFC 4-010-06 | ||
| What is the required cable tray weight capacity? (Ref: ATTACHMENT 2 - Project Specifications, Section 27 10 00) | Refer to specifications section 27 05 28.36 40 NEC and NEMA VE1 for cable tray weight capacity. | ||
| Should junction boxes for data terminations be included (marked in ATTACHMENT 1 - Project Drawings, but absent in ATTACHMENT 2 - Project Specifications)? | Junction boxes to be included for data terminations. | ||
| Are there clear directives on grounding and surge protection for network cabinets? (Ref: ATTACHMENT 2 - Project Specifications, Section 27 05 26) | Refer to T-601 for grounding requirements and specifications section 27 10 00 for surge protection requirements. Referenced spec section not included. | ||
| How should patch panels be labeled and terminated to comply with standards? (Ref: ATTACHMENT 2 - Project Specifications, Section 27 10 00) | Per 27 10 00 provide a labeling system for cabling as required by TIA-606 and UL969. | ||
| Does this project require compliance with FIPS 140-2 for encryption and access controls? | Yes, refer to specifications section 25 05 11.01 | ||
| What are the encryption and access control requirements for the installed systems? | Refer to specifications section 25 05 11.01 | ||
| Are secure cabling pathways and data separation methods required? | Dedicated pathway for communications backbone from main telecommunications room to telecommunications room 170. Follow conduit requirements per sheet EP102 keynote 2. | ||
| Are there specific telecommunications space environmental requirements (HVAC, humidity, power backup)? | Telecommunication rooms HVAC equipment existing to remain. | ||
| Are there any known underground utilities or obstructions that could impact excavation for new utility tie-ins? |
References:
Drawings (Sheet CU101 - Overall Utility Plan)
| Specifications Vol. 1 (Section 01 11 00, Page 2) | Not that hasn't already been addressed. | ||
| There is no clear tie-in detail for existing utilities. Should we assume they are sufficient for the new loads, or will testing determine necessary upgrades? | |||
| References: Drawings (Sheet CU101 - Overall Utility Plan & CU102 - Enlarged Utility Plan) | The Water & Comm are on separate plans with pp sheets | ||
| For OLI #1 (replacement of all existing windows), The specs are pretty vague about what is wanted. Prints say, “Aluminum Store Front System”. Is standard storefront aluminum acceptable? (metal profile would be 2” X 4 1/2” or 2” X 6”) Will this be center set? Specs lead me to believe these windows will be a kynar color, can you confirm? Prints also show the removal of what appears to be operable windows, replacing them with complete fixed windows, is this accurate? Window Elevations show all new windows to not be divided at all height wise, and be one full glass unit, this accurate? Does the store front aluminum and glass here require engineered calculations? | The storefront elevations are to match existing. The color is a kynar bronze. The existing windows are not operable. No engineered calculations are required unless part of the AT/FP requirements. | ||
| Interior window ‘IN3’ shows on page AE601 to be a standard pass-through window with both sides operable (sliding left and right), using standard 1/4” clear temp. Detail B1 on page AE502 says “Stainless Seal Transaction Window”. Please confirm which it is. | Transaction window note has been changed. Transaction window can be any metal material. | ||
| Same questions for the two new exterior aluminum door frames and glass for doors 101A and 171A, do these need engineered calculations? Exterior Elevations show doors 101A and 171A to have drawn hatch lines on the bottom sidelights of the door frame where glass would go. What is this representing? Mapes paneling? Please clarify. | Alum doors do not require calculations. See revised door elevations on sheet AE601. | ||
| Page AE103 shows four windows marked ‘D’ that are to receive “vision obscuring film”. Is there an exact 3M product and color shade I can quote? Specs focus mainly on impact clear film and doesn’t specify anything specific. | See previous response to #34. | ||
| The plumbing drawing are missing labels for the Sanitary Sewer fixtures that are called for on the schedule. Therefore, a proper fixture count cannot be done, please provide labeling. | Fixtures called for on P-103/P-104/P-401. | ||
| General Note E on AD101 states the following: “ The drawings do not contain the information concerning location or procedures for abatement of existing hazardous materials such as asbestos, lead based paint, or mold.” Please provide this information. | |||
| See response to comment #5. | |||
| Plan sheets T-101 and T-102 General Note P states “All Telecommunications cabling by owner. Telecommunications Rough in only.” Is telecommunications cabling required for this project? | All telecommunications cabling by Owner. Contractor telecommunications rough in only. Contractor to coordinate with base to ensure rough-in match their needs. Refer to T-101 and T-102 General Note P. | ||
| Plan sheet T-601 Telecommunications riser diagram shows new OSP cabling coming in from outside the building. What OSP cabling is required and where does it come from? | All telecommunications cabling by Owner. Contractor telecommunications rough in only. Contractor to coordinate with base to ensure rough-in match their needs. Refer to T-101 and T-102 General Note P. | ||
| Plans sheet T-601 Telecommunications riser diagram shows existing High Count Copper OSP and Existing SM and MM Fiber OSP. Will these cables stay in place, or will they need to be moved to new racks? If moved, will they require new terminations? | Existing cables will stay in place. Coordinate with base if requirements differ. | ||
| Plans show to install brick around new windows / doors and says to match existing. The existing, per the site visit, is actually a fluted block, not brick. |
The fluted block may or may not be able to be found to match the existing.
| Please clarify if brick or block is required. | Preference is for a fluted block product to match existing. Block is the most likely product that will offer a match. |
| The existing controls system is JCI Metasys on the entire base. On page 18 of the specs section 230900 (2.1) the general requirements state “The complete building direct digital control system shall be fully integrated to the base wide control system” |
| It does not however, state that this is Johnson Controls Metasys. Please clarify if it is the intent for the building automation controls in this project to be an extension of the existing building automation system on campus and tie into the Metasys front end. | Bidders must comply with specification Section 23 09 00. | ||
| What are the types of the two exterior windows located between grid lines E and F, and between grid lines 2 and 4? | See previous response to #34. | ||
| Sec. 096913-1.2-SD 02 calls for “detailed installation drawings” to be included in the submittal. The below items under Sec. 096913-2.2.2 aren’t applicable. Can the following please be removed? | |||
| Typical cutout details. No cutouts are shown on the plans. | |||
| Gasketing, return air grilles, supply air registers, etc…. None of these items are detailed on the plans. | |||
| Location of connection to building grounding electrode. This is outside the scope of a raised access floor install. | No items may be removed from the spcifications. Refer to EP101 and EP102 for locations of floor boxes requiring cutouts. See keynote 5 on EP101 and Keynote 4 on EP102 | ||
| Sec. 096913-1.2-SD 02 calls for “fabrication drawings” to be included in the submittal. The manufacturer does not furnish drawings or assembly details of how the panels are manufactured, as these are for internal use only. Can this item be removed from the spec? | No items may be removed from the specifications. Cut-sheets, manufacturer's product data, and shop drawings for installation will be required for review. | ||
| Sec. 096913-2.1.1-a calls for 1,000lb concentrated load. This is the lightest capacity panel. Please confirm this is correct. | Verify with the base Contracting Officer that this is the correct concentrated load. | ||
| Sec. 096913-2.1.1-g calls for a safety factor of 5x the uniform load. The system is designed and tested to meet a 2x safety factor. The access floor manufacturer will provide test reports and confirmation that the system will meet the ICC-ES AC 300 (2015 and 2018) IBC. Will this be acceptable? | Manufacturer's load testing data are acceptable but must meet minimum requirements per the specifications. | ||
| Sec. 096913-2.2.4.1 lists HPL finish for the rooms 110,111,114. Per the plans and finish schedule these rooms are to be “ETR”. Please confirm that no additional raised access floor will be needed for rooms 110,111,114. | Raised Access Flooring in rooms 110, 111, and 114 is existing to remain. Repair flooring as needed. See Sheet Keynote 10 on floor plan A1/AE102 and note pointing to room 110 on floor plan A3/IN101. | ||
| Sec. 096913-2.2.4.2 calls for static control carpet tile. Per IN600-CPT1, the selected carpet appears to be a standard carpet tile with no specific static control properties. Please clarify what carpet is needed. | See Addendum 01. | ||
| Sec. 096913-2.3.3 calls for “continuous gaskets on the stringers. The gaskets are not required for air tightness or panel alignment. Additionally, these gaskets typically fall off and capture dirt/debris not allowing the panels to sit properly. Are the gaskets required? | Acceptable to not use gaskets as long as panel alignment is achieved. | ||
| Sec. 096913-2.6 calls for anodized aluminum railings. Plan AE401 calls for wood railings. What type of railing is needed? | Use railing that are compatable with the manufacturer. | ||
| Sec. 096913-3.1.1calls for floor coatings for dust and vapor control to be applied to the structural floor surfaces. Is this coating required? If so, please specify what coating is needed. | Yes it is required, provide a liquid penetrating sealer approved by the raised access flooring manufacturer. | ||
| Sec. 096913-3.2 calls for “field testing from an approved testing lab. Field testing the access floor requires destroying the access floor. This is not a feasible request, and we haven’t been able to find a testing company to perform these tests due to the equipment required. Can this please be removed from the spec? | Base to answer. Does this not call for extisting access floor to be field load tested? | ||
| Sec. 096913-3.2.1 calls to conduct “acceptance tests”. What acceptance tests are required? | Perform all acceptance tests as identified by the manufacturer if applicable. Disregard if none identified. | ||
| Sec. 096913.3.2.2 calls to ground the access floor system. This is outside the scope of the raised access floor. Grounding the system needs to be performed by a licensed electrician. Can this please be removed from the spec? | Raised access flooring must be grounded per the specifications. The grounding may be completed by a qualified electrician to be determined by the general contractor. | ||
| Sec. 096913.3.2.3 calls for testing the electrical resistance of the completed system. This needs to be performed by an electrical contractor or testing agency. Can this please be removed from the spec? | Raised access flooring must be tested per the specifications. The testing may be completed by a qualified electrician to be determined by the general contractor. | ||
| Sec. 096913-3.2.4 calls for inspections and testing of seismic-resisting systems and components per Sec. 014535. It doesn’t appear that any of the items per Sec. 014535 applies to the seismic system of the access floor. Is this required? | Seismic testing results must be performed by the manufacturer on a standardized sample system and the test results provided for review. | ||
| Sec. 096913-3.4 calls to install a fire safety detection system below the raised flooring. This is outside the scope of the raised access floor and shouldn’t be in the spec. Can this please removed from the spec? | Raised access flooring must have an integrated under-floor fire safety detection system per the specifications. The fire safety detection system may be completed by a qualified fire safety and detection installer to be determined by the general contractor. | ||
| Plan Sheet CU102 references WF Plans, but there are no WF Project Numbers. Please provide WF Project #’s and/or plans so utility subcontractors can provide a comprehensive total proposal. | WF Project Number in progress. Number pending construction permit request per review comment from city. | ||
| Specification 27 51 16 and drawings TYPA-101 to 601 describes the Public Address System that is to be installed. |
a. Note P on the General Notes table of the telecommunications drawings says: "All Telecommunications Cabling by owner".
| b. Does this apply to all cabling for the Public Address System or is the contractor to supply and install this cabling? | TYPA-601 indicates 14 AWG speaker wire with conduit. |
| Drawing TYPA-601 shows a microphone as part of the system. |
a. None of the telecommunications drawings show the location of this microphone.
| b. Where is the microphone to be located? | Microphone is shown in room 102 Client SVC CTR. on sheet TYPA-101. |
This is the start of the file's text. The full file is on GovTribe.