Amendment 2 Attachment 2 - 09 72 00.pdf

PDF 50 KB Posted

Attached to
137th SOW - Building 1040 Repair / Renovation Project
Solicitation number
W50S8T25BA011
Issued by

About this file

This is Section 09 72 00 Wallcoverings specification file for the 137th SOW Oklahoma ANG B-3 100% Repair Building 1040 project, with Addendum #2 dated 02/27/2025. The specification details requirements for three main types of wallcoverings: acoustical wall panels (AWP1), presentation dry erase wallcovering (WWC1), and standard wallcoverings with accessories.

The acoustical wall panels must be 1-1/6" thick impact resistant fiberglass board faced with acoustically perforated vinyl wallcovering, have a minimum NRC rating of 0.80, and contain 70% recycled content. The presentation dry erase wallcovering must be magnetic, accept dry erase markings, have a minimum weight of 20 ounces/square yard, 48-inch width, and include clear satin anodized aluminum trim and accessories. All wallcoverings must meet strict indoor air quality certifications (UL 2818 Greenguard Gold or SCS Global Services Indoor Advantage Gold), fire testing requirements, and use non-mercury based primers and adhesives. The specification includes detailed requirements for surface preparation, installation methods, and clean-up procedures. Color, texture and pattern selections are to be made according to the Interior Material Legend in the drawings.

View the file

Other files

File Type Posted
Abstract (Final).pdf PDF
Amendment 3 Attachment 1 - Bldg 1040 Reno Questions and Answers.docx DOCX document
Solicitation Amendment 3 W50S8T25BA0110003.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 1.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 2.pdf PDF
Amendment 2 Attachment 5 - IN600 - INTERIORS MATERIALS LEGEND.pdf PDF
Amendment 2 Attachment 3 - A-002 - PARTITION TYPES.pdf PDF
Amendment 2 Attachment 6 - Bldg 1040 Reno Questions and Answers.xlsx XLSX spreadsheet
Amendment 2 Attachment 1 - Addendum 02 Narrative.docx DOCX document
Solicitation Amendment 2 W50S8T25BA0110002.pdf PDF
Amendment 2 Attachment 4 - 08 11 16.pdf PDF
06 20 00.pdf PDF
21 13 13.pdf PDF
IN101 - FLOOR FINISH PLAN - SECTOR A.pdf PDF
Bldg 1040 Reno Questions and Answers - FSB and GOV Reponses.xlsx XLSX spreadsheet
EL101 - ELECTRICAL INTERIOR LIGHTING PLAN - SECTOR A.pdf PDF
AE102 - FLOOR PLAN - SECTOR A.pdf PDF
AE502 - DETAILS.pdf PDF
AE403 - ENLARGED PLANS.pdf PDF
10 21 13.pdf PDF
10 51 13.pdf PDF
08 41 13.pdf PDF
AE103 - FLOOR PLAN - SECTOR B.pdf PDF
08 81 00.pdf PDF
AE411 - INTERIOR ELEVATIONS.pdf PDF
AE402 - ENLARGED PLANS.pdf PDF
AE601 - DOOR SCHEDULE AND DETAILS.pdf PDF
26 05 73.pdf PDF
08 11 16.pdf PDF
AE602 - OLI 1 - EXTERIOR WINDOW FRAMES.pdf PDF
Addendum 01 Narrative.docx DOCX document
08 71 00.pdf PDF
IN102 - FLOOR FINISH PLAN - SECTOR B.pdf PDF
Solicitation Amendment 1 W50S8T25BA0110001 SF 30.pdf PDF
06 41 16.00 10.pdf PDF
AE201 - BUILDING ELEVATIONS.pdf PDF
TABLE OF CONTENTS.pdf PDF
A-002 - PARTITION TYPES.pdf PDF
01 45 35.pdf PDF
FA601 - FIRE ALARM - MASS NOTIFICATION RISER DIAGRAM.pdf PDF
AE151 - REFLECTED CEILING PLAN - SECTOR A.pdf PDF
AE600 - ROOM FINISH SCHEDULE.pdf PDF
10 51 16.pdf PDF
30 Jan 25 Site Visit Sign In Sheet.pdf PDF
BLDG 1040 Renovation Site Visit Slides 30 January 25.pptx PPTX presentation
ATTACHMENT 3 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 2.pdf PDF
Solicitation - W50S8T25BA011.pdf PDF
ATTACHMENT 2 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 1.pdf PDF
Bidders Checklist.docx DOCX document
ATTACHMENT 1 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_DRAWINGS.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

137TH SOW OKLAHOMA ANG B-3 100% REPAIR BUILDING 1040

OKLAHOMA CITY, OK 12 SEPTEMBER, 2024

SECTION 09 72 00

WALLCOVERINGS

08/17, CHG 1: 08/18

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C423 (2023) Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method

ASTM E84 (2023) Standard Test Method for Surface Burning Characteristics of Building Materials

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)

CDPH SECTION 01350 (2017; Version 1.2) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers

GREEN SEAL (GS)

GS-36 (2013) Adhesives for Commercial Use

GYPSUM ASSOCIATION (GA)

GA 214 (2010) Recommended Levels of Gypsum Board Finish

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2021) International Building Code

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 265 (2023; ERTA 1 2023) Standard Methods of Fire Tests for Evaluating Room Fire Growth Contribution of Textile or Expanded Vinyl Wall Coverings on Full Height Panels and Walls

NFPA 286 (2024) Standard Methods of Fire Tests for Evaluating Contribution of Wall and Ceiling Interior Finish to Room Fire Growth

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS) Indoor Advantage

SECTION 09 72 00 Page 1

Gallagher, Brad K.

Text Box

ADDENDUM #2 - 02/27/2025

Wood, Tracy L.

Cloud

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)

SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications

UNDERWRITERS LABORATORIES (UL)

UL 723 (2020) UL Standard for Safety Test for Surface Burning Characteristics of Building Materials

UL 2818 (2022) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings

1.2 SUBMITTALS

Government approval is required for submittals with a "G" classification.

Submittals not having a "G" classification are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Wallcoverings and Accessories; G

Primer and Adhesive

Recycled Content for vinyl wallcovering; S

SD-04 Samples

Wallcoverings and Accessories; G

SD-07 Certificates

Indoor Air Quality; S

SD-08 Manufacturer's Instructions

Wallcoverings and Accessories

SD-10 Operation and Maintenance Data

Wallcoverings and Accessories; G

1.3 CERTIFICATIONS

1.3.1 Indoor Air Quality Certifications

Submit required indoor air quality certifications and validations in one submittal package.

1.3.1.1 Fabrics and Wallcoverings

Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or

SECTION 09 72 00 Page 2 provide certification or validation by other third-party program that products meet the requirements of this Section. Provide current product certification documentation from certification body.

1.3.1.2 Primers and Adhesives

Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.

1.4 DELIVERY, STORAGE, AND HANDLING

Deliver the material to the site in manufacturer's original wrappings and packages and clearly label with the manufacturer's name, brand name, pattern and color name and number, dye lot number, size, and other related information. Store in a safe, dry, clean, and well-ventilated area at temperatures not less than 50 degrees F and within a relative humidity range of 30 to 60 percent. Store wallcovering material in a flat position and protected from damage, soiling, and moisture. Do not open containers until needed for installation, unless verification inspection is required.

1.5 ENVIRONMENTAL REQUIREMENTS

Comply with wallcovering manufacturer's printed installation instructions for minimum temperature of area to receive requirements for conditioning adhesive and wallcovering. Provide a minimum 50 degrees F area temperature, 72 hours prior to installation, during installation, and until the adhesive dries. Observe ventilation and safety procedures.

1.6 WARRANTY

Provide manufacturer's standard performance guarantees or warranties that extend beyond a one-year period. Presentation dry erase wallcovering shall hve a 10-year warranty.

1.7 EXTRA MATERIALS

Provide one linear foot of full-width wallcovering of each pattern and color for each 100 linear feet of wallcovering installed. Provide the same manufacturer, type, pattern, color, and lot number of extra stock as the installed wallcovering. Provide full rolls, packed for storage and marked with content, manufacturer's name, pattern and color name and number and dye lot number. Leave extra stock at the site at a location as directed by the Contracting Officer.

PART 2 PRODUCTS

2.1 WALLCOVERINGS AND ACCESSORIES

Provide wall coverings and accessories material designed specifically for the specified use. Provide vinyl wallcovering and borders with a mercury, cadmium, lead, and chromium free base. Protect wallcoverings with bactericides and mildew inhibitors against microbiological and mildew growth.

SECTION 09 72 00 Page 3

2.1.1 Product Data

a. Wallcovering: Submit manufacturer's descriptive data, documenting physical characteristics, flame resistance, mildew and germicidal characteristics for wallcovering.

b. Accessories: Submit manufacturer's descriptive data for corner guard and wainscot cap.

c. Primer and Adhesive: Submit manufacturer's descriptive data, documenting physical characteristics, mildew and germicidal characteristics.

2.1.2 Samples

2.1.2.1 Wallcovering

Submit three samples of each indicated type, pattern, and color of wallcovering. Provide minimum 5 by 7 inch samples of wallcovering to show pattern repeat of sufficient size.

2.1.2.2 Accessories

Submit three samples of each indicated type corner guard and wainscot cap;

provide samples a minimum of 3 inchlong.

2.1.2.3 Wallcovering

Provide three samples, 3 yards long by the width specified, of each type to be installed in the work, as required to illustrate material weight, color, shade, decorative design, and embossing when required.

2.1.3 Certificates

Submit manufacturer's statement attesting that the product furnished meets or exceeds specification requirements. Date the statement after the award of the contract, state Contractor's name and address, name the project and location, and list the requirements being certified. Include these certificates:

(1) Certified laboratory test reports of the physical properties for vinyl wallcovering, as specified.

(2) Certificates of Compliance for UL fire hazard classification listing, as specified.

(3) Certificates of Compliance for contact adhesive.

2.1.4 Manufacturer's Instructions

Submit preprinted installation instructions for wallcovering and accessories, adhesives and primers. Include substrate preparation and material application in the instructions.

2.1.5 Operations and Maintenance Data

a. Submit Data Package 1 in accordance with Section 01 78 23 OPERATION

AND MAINTENANCE DATA.

SECTION 09 72 00 Page 4

b. Submit three copies of manufacturer's maintenance instructions for each type of vinyl wallcovering and accessory describing recommended type of cleaning equipment and materials, spotting and cleaning methods, and cleaning cycles. Instructions to also include preventative maintenance, recommended cleaning materials and precautions in the use of cleaning materials that may be detrimental to the wallcovering surface and accessories when improperly applied.

2.2 ACOUSTICAL WALL PANEL (AWP1)

Provide acoustical wall panel fabricated of 1-1/6" inch thick impact re-sistant fiberglass board faced with acoustically perforated vinyl wall-covering.transparent membrane. The edges of the panels are square cut, protective sheet is fully bonded to the surface of the panel and edges are fully wrapped. and are not fabric covered. Panels are held in place by Z-Clip full width of panel. viny "C" and "H" channels that are 8 feet in length and used to attach the panels to the wall surface. Face of panel is cleanable.washable, scratch-resistant, and soil-resistant..

Meet the requirements of Class A when tested in accordance with ASTM E84 or UL 723. Comply with or exceed the following for textile wallcovering:

Width 48 inch

NRC rating in accordance with ASTM C423 0.80 inch

Provide Acoustical Wall Panel containing a minimum of 40 70 percent recycled content. Provide data identifying percentage of recycled content for acoustical wall panel.

Provide certification of indoor air quality for acoustical wall panel.

2.3 PRESENTATION DRY ERASE WALLCOVERING / WRITEABLE WALLCOVERING (WWC1)

Provide magnetic, presentation dry erase wallcovering that accepts dry erase markings. Provide wallcovering with a minimum total weight of 20 ounces/square yard, a width of 48 inch and backing of a woven or nonwoven polyester. The white pimented vinyl is bonded with ferrous sheet and capped with semi-gloss dry erase film. Test wallcovering in accordance with NFPA 286 or have a Class A flame spread rating of 0-25 and smoke development rating of 0-450 when tested in accordance with ASTM E84 or UL 723 . Provide wallcovering color white. Provide clear satin, anodized aluminum edge trim on all four edges. Provide a clear satin, anodized aluminum tray 48 inches in length. Markings must be removable with a felt eraser or cloth without ghosting. Provide each unit complete with an eraser, four different color compatible dry erase markers, and an 8 ounce bottle of liquid surface cleaner recommended by the manufacturer.

Provide certification of indoor air quality for presentation dry erase wallcovering.

2.4 PRIMER AND ADHESIVE

Provide a type primer and adhesive recommended by the wallcovering manufacturer, containing a non-mercury based mildewcide, and complying with local indoor air quality standards. Primer must permit removal of the wallcovering and protect the wall surface during removal. Do not damage gypsum wallboard facing paper during removal of wallcovering.

SECTION 09 72 00 Page 5

Wood, Tracy L.

StrikeOut

Wood, Tracy L.

StrikeOut

Wood, Tracy L.

StrikeOut

Wood, Tracy L.

StrikeOut

Wood, Tracy L.

StrikeOut

Gallagher, Brad K.

Text Box

ADDENDUM #2 - 02/27/2025

Wood, Tracy L.

Cloud

Provide a strippable type adhesive. When substrate color variations show through vinyl wallcovering, provide a white pigmented primer as recommended by the wallcovering manufacturer used to conceal the variations. Provide a recommended type adhesive to install corner guards and wainscot cap by the manufacturer of the corner guards and wainscot cap.

Provide primers and non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) that meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide aerosol adhesives used on the interior of the building that meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of GS-36.

Provide certification or validation of indoor air quality for primer;

also, provide certification or validation of indoor air quality for adhesives.

2.5 COLOR, TEXTURE, AND PATTERN

Provide color, texture and pattern in accordance with the Interior Material Legend in the drawings.

PART 3 EXECUTION

3.1 EXAMINATION

Inspect all areas and conditions under which wallcoverings are to be installed. Notify the Contracting Officer, in writing, of any conditions detrimental to the proper and timely completion of the installation. Work will proceed only when conditions have been corrected and accepted by the installer.

3.2 SURFACE PREPARATION

Do not apply wallcovering to surfaces that are rough, that contain stains which will bleed through the wallcovering, or that are otherwise unsuitable for proper installation. Fill cracks and holes; sand rough spots smooth. Finish walls to receive presentation dry erase wallcovering to a Level 4 gypsum wallboard finish in accordance with GA 214 unless Level 5 is recommended by the wallcovering manufacturer. Thoroughly dry surfaces at least 30 days prior to installation of vinyl wallcovering.

Provide interior surfaces of new and existing gypsum wallboard with a wallcovering primer in accordance with the manufacturer's printed instructions. As required, use white primer when substrate color variations are visible through thin or light color wallcovering. Seal interior surfaces of exterior masonry walls to prevent moisture penetration, then prime with a wallcovering primer in accordance with the manufacturer's printed instructions. Provide masonry walls with flush joints. Test moisture content of plaster, concrete, and masonry with an electric moisture meter of a maximum five percent reading. Apply a thin coat of joint compound or cement plaster, as recommended by the wallcovering manufacturer, to the concrete and masonry walls as a substrate preparation. To promote adequate adhesion of wall lining over masonry walls, prime the walls as recommended by the wall lining manufacturer. Prime the surfaces of walls as required by the manufacturer's printed instructions to permit ultimate removal of wallcovering from the wall surfaces. Allow primer to completely dry before adhesive application.

SECTION 09 72 00 Page 6

3.3 INSTALLATION

Do not install building construction materials that show visual evidence of biological growth.

3.3.1 Wallcovering

Install wallcovering in accordance with the manufacturer's printed installation instructions. Remove glue and adhesive spillage from wallcovering face and seams with a remover recommended by the manufacturer.

3.3.1.1 Acoustical Wall Panel

When acoustical wall panels are specified to comply with NFPA 265 , NFPA 286 , or ICC IBC (Section 803.5 Textile wall coverings) testing, install the wallcovering in accordance with the manufacturer's printed installation instructions for compliance with the testing using the same product mounting system, including adhesive. After the installation is complete, vacuum the fabric with a ceiling to floor motion.

3.3.1.2 Presentation Dry Erase Wallcovering Placement

Install presentation dry erase wallcovering wall-to-wall horizontally. .

Do not make seams at writing height to provide a continual, seamless writing surface.Provide wallcovering with an aluminum frame. When frame and tray are required for presentation dry erase wallcovering, install them in accordance with manufacturer's installation instructions. Upon completion of presentation dry erase wallcovering installation, clean the wallcovering surface as recommended by the manufacturer prior to first use. Install presentation dry erase wallcovering from 36 inches to 84 inches above finished floor. Wallcovering locations are as indicated on drawings.

3.3.2 Corner Guards and Wainscot Cap

Install corner guards and wainscot cap on all exposed corners with and in accordance with the manufacturer's printed instructions. Run corner guards from top of base to ceiling in a continuous length.

3.4 CLEAN-UP

Upon completion of the work, clean wallcovering free of dirt, soiling, stain, or residual film. Remove and clean surplus materials, rubbish, and debris resulting from the wallcovering installation.

-- End of Section --

SECTION 09 72 00 Page 7

09 72 00 - WALLCOVERINGS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
1.3.1.1 Fabrics and Wallcoverings
1.3.1.2 Primers and Adhesives
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 ENVIRONMENTAL REQUIREMENTS
1.6 WARRANTY
1.7 EXTRA MATERIALS
PART 2 PRODUCTS
2.1 WALLCOVERINGS AND ACCESSORIES
2.1.1 Product Data
2.1.2 Samples
2.1.2.1 Wallcovering
2.1.2.2 Accessories
2.1.2.3 Wallcovering
2.1.3 Certificates
2.1.4 Manufacturer's Instructions
2.1.5 Operations and Maintenance Data
2.2 ACOUSTICAL WALL PANEL AWP1
2.3 PRESENTATION DRY ERASE WALLCOVERING WRITEABLE WALLCOVERING WWC1
2.4 PRIMER AND ADHESIVE
2.5 COLOR, TEXTURE, AND PATTERN
PART 3 EXECUTION
3.1 EXAMINATION
3.2 SURFACE PREPARATION
3.3 INSTALLATION
3.3.1 Wallcovering
3.3.1.1 Acoustical Wall Panel
3.3.1.2 Presentation Dry Erase Wallcovering Placement

3.3.2 Corner Guards and Wainscot Cap