This Questions and Answers document is an attachment (Amendment 2 Attachment 6) related to Building 1040 renovation at the 137th Will Rogers Air National Guard Base in Oklahoma City. The file appears to be a spreadsheet format containing questions and answers about the renovation project, though the specific Q&A content is not provided in the source material. The associated solicitation (W50S8T25BA011) is a small business set-aside under NAICS 236220 with an estimated value between $5-10 million.

The overall project involves renovating Building 1040, with bids due February 27, 2025 by 1000 hours CST. A pre-bid conference and site visit is scheduled for January 27, 2025 at 1000 hours CST. The Department of the Army National Guard anticipates funds will become available by September 30, 2025. No electronic or facsimile bids will be accepted for this Invitation for Bid, which will be awarded to the responsible bidder with the lowest price who meets all requirements.

View the file

Other files

File Type Posted
Abstract (Final).pdf PDF
Amendment 3 Attachment 1 - Bldg 1040 Reno Questions and Answers.docx DOCX document
Solicitation Amendment 3 W50S8T25BA0110003.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 1.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 2.pdf PDF
Amendment 2 Attachment 2 - 09 72 00.pdf PDF
Amendment 2 Attachment 5 - IN600 - INTERIORS MATERIALS LEGEND.pdf PDF
Amendment 2 Attachment 3 - A-002 - PARTITION TYPES.pdf PDF
Amendment 2 Attachment 1 - Addendum 02 Narrative.docx DOCX document
Solicitation Amendment 2 W50S8T25BA0110002.pdf PDF
Amendment 2 Attachment 4 - 08 11 16.pdf PDF
06 20 00.pdf PDF
21 13 13.pdf PDF
IN101 - FLOOR FINISH PLAN - SECTOR A.pdf PDF
Bldg 1040 Reno Questions and Answers - FSB and GOV Reponses.xlsx XLSX spreadsheet
EL101 - ELECTRICAL INTERIOR LIGHTING PLAN - SECTOR A.pdf PDF
AE102 - FLOOR PLAN - SECTOR A.pdf PDF
AE502 - DETAILS.pdf PDF
AE403 - ENLARGED PLANS.pdf PDF
10 21 13.pdf PDF
10 51 13.pdf PDF
08 41 13.pdf PDF
AE103 - FLOOR PLAN - SECTOR B.pdf PDF
08 81 00.pdf PDF
AE411 - INTERIOR ELEVATIONS.pdf PDF
AE402 - ENLARGED PLANS.pdf PDF
AE601 - DOOR SCHEDULE AND DETAILS.pdf PDF
26 05 73.pdf PDF
08 11 16.pdf PDF
AE602 - OLI 1 - EXTERIOR WINDOW FRAMES.pdf PDF
Addendum 01 Narrative.docx DOCX document
08 71 00.pdf PDF
IN102 - FLOOR FINISH PLAN - SECTOR B.pdf PDF
Solicitation Amendment 1 W50S8T25BA0110001 SF 30.pdf PDF
06 41 16.00 10.pdf PDF
AE201 - BUILDING ELEVATIONS.pdf PDF
TABLE OF CONTENTS.pdf PDF
A-002 - PARTITION TYPES.pdf PDF
01 45 35.pdf PDF
FA601 - FIRE ALARM - MASS NOTIFICATION RISER DIAGRAM.pdf PDF
AE151 - REFLECTED CEILING PLAN - SECTOR A.pdf PDF
AE600 - ROOM FINISH SCHEDULE.pdf PDF
10 51 16.pdf PDF
30 Jan 25 Site Visit Sign In Sheet.pdf PDF
BLDG 1040 Renovation Site Visit Slides 30 January 25.pptx PPTX presentation
ATTACHMENT 3 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 2.pdf PDF
Solicitation - W50S8T25BA011.pdf PDF
ATTACHMENT 2 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 1.pdf PDF
Bidders Checklist.docx DOCX document
ATTACHMENT 1 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_DRAWINGS.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TITLE: Renovate Bldg 1040
QUESTIONSANSWERS
Can you confirm that the primary focus of the project scope aligns with the outlined specifications in Attachments 1 through 3?Yes the building shall be renovated IAW the specifications provided.
Are there any additional considerations or documents required for submission beyond the bidder’s checklist and specified attachments?Please refer to the solicitation for the documents you are required to submit.
Is there an Asbestos Inspection Report for this project or Building 1040? The Demolition Plans, General Notes, Section E, states the following:

THE DRAWINGS DO NOT CONTAIN THE INFORMATION CONCERNING LOCATION OR PROCEDURES FOR ABATEMENT OF EXISTING HAZARDOUS MATERIALS SUCH AS ASBESTOS, LEAD-BASED PAINT, OR MOLD. THE CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER FOR INFORMATION REGARDING SUCH MATERIALS.

No asbestos is indicated with environmental report. No known ACM in hazard abatement plan.
Drawing F-001 Zone 3 Hatching excludes:

a. 129 Vestibule – Included in FX101 Fire Protection Schedule – Sector A , Note 7

b. 130 Men – Included in FX102 Fire Protection Schedule – Sector B, Note 5b.

Please clarify Zone of these two rooms.Room 129 and 130 are not inside the secure boundary of Zone 3. See sheet AE150 for secure boundary locations.
Drawing F-001 Zone 1, 2, 3 & 4 Zone Control Valve Assemblies.

a. Are Zone control valve assemblies to be installed inside or outside of the hazard areas?

b. Are zone control valve assemblies to be installed above ceiling, or along wall below seven feet above finished floor?

c.If zone control valve assemblies are installed above ceiling, will portable ladder access be acceptable, or will special access be required to reach valves?Zone control valves are to be installed above the ceiling outside of the secure area.
Specification 21 13 13 § 2.3.2 permits Braided flexible sprinkler hose if AHJ allows.
a. Please confirm if Braided flexible drops are allowed by the authority having jurisdiction.AE has no concerns with allowing braided hose.
Specification 21 13 13 § 2.3.4.2 requires check valves to meet the requirement of MSS SP-71 for Type 3 or 4. This requires check valves to be flanged connection, with no ports for drains. There are a limited number of manufacturers (1 or 2) for these type check valves. These type check valves are not economical. May check valves that are UL listed for Fire Protection or FM approved for fire protection that do NOT meet the requirement of MSS SP-71 for Type 3 or 4 be utilized?The UFGS requires check valves to meet the requirements of MSS SP-71 type 3 & 4. MSS SP-71 type 3 listed valves have a “clear” waterway, meaning that with full flow the hangar assembly will clear the waterway entirely. This must be met unless there are no products available.
Plan Sheet AE602 shows an Aluminum Storefront “E”. Please advise us of the location that this storefront is to be installed.Storefront 'E' is an extra elevation and not included in the project. Sheet AE602 has been modified to eliminate Storefront 'E'. See Addendum 01.
Has the Plant and Equipment Schedule been completed and included?
a. Is this statement referring to Section 00 10 00 – Solicitation, Contract Line-Item Number (CLIN) Schedule on page 5 of the Solicitation?All schedules will be provided by the awardee.
In the hardware schedule the x-10 lock is not listed in hardware set #14, but door #169A is listed as getting then x-10 lock.Hardware set #14 is revised to show an X-10 lock. See Addendum 01.
Hardware set #15 is listed as getting the x-10, but door #129A is not listed as getting the x-10 lock on the door schedule.Hardware set #14 is revised to show an X-10 lock. See Addendum 01.
In set #16, the x-10 lock is not listed in the individual parts but is listed in the operational section.Hardware set #16 is revised to show an X-10 lock. See Addendum 01.
Section 8 11 13 page 5.

2.5.1 Hardware for Secure Doors

a. Secure rated doors must have all hardware prepared and installed on the door at the factory, and shipped to the site as part of the door assembly.

b. Which doors would be considered "Secure Doors"?Doors with required STC ratings should be a sound-rated door and arrive on site as a pre-assembled factory unit with hardware that is integral to the sound performance of the scheduled door assembly.
I have noticed that there is a disparity between the specifications and drawings in terms of the number of doors that require access control. The specifications call for 33 and the drawings call for 29.
a. Which number would you like to differ?Refer to sheets TY-101 and TY-102 for doors that require access control. This should be the 33. See Addendum 01.
Where are the Corner Guards Specified in Division 10 26 00 to be installed?Corner Guards are to be installed at all outside corners of gypsum board walls per General Note G Sheets AE401, AE402, AE403, AE410 and AE411 and Interior Material Legend (Basis-of-Design/Equivalent) under Miscellaneous CG1.
Will there be any asbestos abatement, LBP removal, or mold remediation within the scope of work?No known hazards
The entire Secure Perimeter as defined in (ICS-705-1 G.1) ) have not been detailed for new work under this contract in the contract documents. Should the CTTA require changes from the contract drawings, would the government handle changes to the drawings per FAR 52.243-4 as listed in the solicitation.Yes
Sheet AE102 & AE103 Keynote 12 instructs the contractor to verify the existing conditions of the walls at the vault area, and repair to 1 hour rated fire assembly. ICD-705 limits the suitable methods of construction for vault walls, floor and ceiling to a higher standard. For pricing purposes, should the contractor assume that a 1 hour rated wall will meet the CTTA requirements for the space?The walls in question are not required to meet ICD-705, but they will need to be upgraded (if needed) to meet a 1-hour rating.
Compliance with ICD-705 is noted only in the fire alarm sheets. The word “Secure” along with items typical of a SCIF are noted in the architectural sheets. Countermeasures relevant to radio frequency in ICD-705 and ICS-705-1 are not referenced in contract documents. Other divisions (eg. HVAC, Electrical, Plumbing, etc) do not minimize penetrations into and out of the secure areas as required by ICD-705 and or ISC-705-1. For pricing purposes, is it acceptable for the contractor to assume that countermeasures not shown in the documents are not applicable to the project?ICD-705 is not a requirement for any of the secure boundary walls.
01 11 00 paragraph 1.3 notes that the contract documents are not intended to be complete. In order for the Successful offeror to accurately price this request for proposal, can the user define what level each of the secure areas are intended to be, and what waivers will be allowed by the CTTA?Open storage
Per spec section 230923.02 BACNET Direct Digital Control for HVAC and other Building Control Systems, please approve AuomatedLogic as a manufacturer.Provide conrol systems as specified in 230923.02. Pre-approvals shall not be given.
Solicitation includes DFAR 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. (DEVIATION 2024-O0013 REVISION 1) May 2024 Deviation 2024-O0013 May 2024 by reference.
a. Please describe how Controlled Unclassified Information (CUI) will be identified?The contractor will not be provided any controlled unclassified information. In a rare situation that it occurs, we will handle it between the contractor and the government.
Drawing FA601 references ICD 705 for secure penetrations.

a. Specification 21 13 13 § 1.1 references ICS 705-1.

b. Are SCIF requirements applicable to any trade other than Fire Alarm?

c. If so, please identify which trades other than fire alarm are required to comply with SCIF penetration requirements.Will remove all mentions of ICD 705 from documents. All requirements are shown in detail as needed at secure perimeters. No SCIF is indicated for the project. See Addendum 01.
Section 01 45 35, 1.2 General Requirements – This section indicates required Special Inspections are list on Sheets G-003 and G-004 of the drawings. These sheets are not included in the drawings issued. Please confirm that the Special Inspections listed on Sheets G-201 and G-202 are the only special inspections required on this project.Specification updated to correct sheet numbers to G-201 and G-202. See Addendum 01.
Please provide Hazardous Material reports for this project as indicated per General Note E, Sheet AD101.Will attach plan.
Section 11 94 10 Rooftop Fall Protection Anchors, 1.3 System Description indicates quantities and locations are shown on the drawings. A roof plan indicating this information is not found in the documents. Please provide a Roof Plan indicating the quantity and locations for the fall protection anchors.Rooftop fall protection is not part of this scope and will be removed from the project specifications. See Addendum 01.
Please confirm that temporary power and water will be available for construction purposes. Please clarify whether these utilities will be provided at no charge to the Contractor.
The existing power and utilities can be utilized at no cost to the contractor, if available. The base will not supply temporart power or utulities if not availible at the building. Portablew generators are the responsibility of the contractor when needed.
Please confirm the Submittal Clerk is required to be an on-site, full-time position.Not required.
Please confirm there will be no scheduling requirements for the closure of Hercules Dr. for utility work.We believe this is ment for Mobility dr. and will be handeled at the base level.
To help with scheduling and determining cost related to Phasing, please provide information related to building occupation during construction such as –

a. Number of anticipated phases.

b. Specific or critical areas that will need to be occupied for a substantial portion of the construction duration.

c. Square feet or number of individual offices required by Owner per phase.

d. Anticipated duration of each Owner move between phases.Data center must be operational at all times A. no other phases anticipated B. data center will be manned at all times. No others occupants will be in the building. C. Data center and switch rmXXXX to be measureed and field verified by contractor.
Sections 10 51 13 and 10 51 16 appear to be specifications for the Cell Phone Lockers. Which takes precedent.Specification 10 51 13 has been modified to remove the cell phone lockers section. See Addendum 01.
Sheet AE102 Floor Plan Sector A - please confirm that the two (2) exterior windows near Column Line D between Column Line 2 and 4 are Type “A” windows.This is correct. The two exterior storefront systems near grid 'D' are type 'A; windows. Sheet AE102 has been revised with the correct window tags. See Addendum 01.
Please provide the location of exterior window Type “E”.Exterior window type 'E' does not exist on the project and has been eliminated from sheet AE602. See Addendum 01.
Please provide information related to glazing Key Note “4” shown on Sheets AE601 and AE602.Keynote '4' on sheet AE601 and AE602 have been revised to show glass types. See revised sheets AE601 and AE602 with revised glazing notes.See Addendum 01.
Please clarify if the “STAINLESS STL (STL)” note on Sheet AE601 is relevant.The stainless Steel note on sheet AE601 is irrelevant and has been removed. See Addendum 01.
Sheet AE151 Room 111 shows Accoustic Ceiling Tiles and suspended lighting fixtures.
Please clarify.Sheet AE151 has been revised to show the correct lighting. See Addendum 01.
Sheet AE601 Door Schedule - Please confirm for all doors with “Existing to Remain” notes that all existing items, doors, frames and hardware are to remain.Correct. All doors listed as existing to remain are not to have changed hardware or other systems.
Please clarify in doors Mark 126A and 166A should be marked “Existing to Remain” or if a new door and hardware should be installed in the existing frame.Doors 126A and 166A are to be new doors.
Please provide as-built drawings for the existing building.Will provide.
Sheet A-002, Wall Series Legend – “A” Series indicates an acoustic partition, STC is a priority. No STC rating is shown on the “A” Series details. Also, no STC rating is shown in the Door Schedule for doors located within “A” Series walls. Please clarify.Wall types 'A' and 'I' have been revised to clarify the intent of the construction. Wall types 'A' are not considered priority STC rated and will not require an STC door or hardware.
Will the sensitivity and value of the assets in any of the following rooms require supplemental fire protection such as an NFPA-2001 Clean Agent System or NFPA-770 Hybrid Fire Suppression Systems to protect the assets prior to the wet-pipe sprinkler system discharging water into these rooms in the event of a fire?
a.110 Data Center
b.111 Crypto Vault
c.115 Tel / Switch
d.116 Data
e.125 Radio Shop
f.126 ITE
g.126.1 Elec
h.147 Elec
i.170 SEC Comm
j.172 A/V Room
k.173 A/V RoomNo, per the TSFPEWG G 3-600-01.01-18 these rooms will be protected with a Very Early Smoke Detection as they are classified as MACII. Please refer to sheet FA101 & FA102 for Air Sampling Control Panel locations. Additionally the TSFPEWG requires wet pipe system coverage for these rooms with control valves outside of the room for system isolation.
What is the basis of design that can install the type of windows being called out in alternate for Line Item 002?See specification section 08 41 13 Aluminum Framed Entrances and Storefronts.
Will there be any factors involved in the decision of a general contractor beside low number?Please refer to the solicitation section 00 21 00: As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.
Who is the manufacturer for the roofing system in regards to the roof hatch being installed?
See specification section 05 50 13 Miscellaneous Metal Fabrications, Section 2.6 Roof Hatches (Scuttles).
Could we get an inspection report or anything that references where the asbestos is located and what is the AB containing material (joint compound, flooring), also quantities.See response to comment #5.
Pre-bid Meeting Question
Will there be any Abatement on the project?See response to comment #5.
Pre-bid Meeting Question
Will this project be required to follow ICD 705 for secure areas?See response to comment #25.
Pre-bid Meeting Question
What are the permits required for the project?Only for water taps (fire & main)
Pre-bid Meeting Question
Are there any CUI documents? If so, how do we handle the transfer & control of those documents?See response to comment #24.
Pre-bid Meeting Question
Where will the laydown & crane access areas be located?TBD during precon meeting after bid award. Easily coordinated with base as needed.
Pre-bid Meeting Question
How are bids being submitted?Hard copies only. Deadline is 10:00 CST on February 27th, 2025. All mailed bids must be in CE hands before time, not in the mail to be accepted. Contractors responsibility to confirm bids received on time.
Pre-bid Meeting Question
Is there exsiting roof access, i.e. roof hatch & ladder?Yes
Pre-bid Meeting Question
Will this comm vault need to be operational during construction? If so, will we need escorted?Yes & Yes. All work in the area will require an escort & supervision.
Pre-bid Meeting Question
Will there be any other areas other than the comm with will need coordination for access?No, the rest of the building will be cleared for construction.
Pre-bid Meeting Question
Will the sign-in sheet be made available?Yes, sign-in sheet will be loaded onto the SAM.gov site.
Please provide type of existing roofing material (TPO, EPDM, etc.) and which manufacturer holds existing roof warranty if applicable.See as builts
Please provide existing roof assembly or please provide as-built drawings for existing roof as-built conditions?See as builts
Do you all have a manufacturer of choice for the data cable and connectivity?There is no manufacturer of choice. Please refer to project specifications under Division 27 for cabling manufacturer performance and compliance requirements.
Both Cat6 and Cat6A are listed, are you needing both or was that just a typo?CAT6 and CAT6A are intentionally listed based on the application requirements.
Do you have a manufacturer of choice for the fiber optic cable and connectivity?There is no manufacturer of choice. Please refer to project specifications under Division 27 for cabling manufacturer performance and compliance requirements.
Are you needing SM and MM on the fiber? Again, both options are listed.All telecommunications cabling by Owner. Contractor telecommunications rough in only. Contractor to coordinate with base to ensure rough-in match their needs. Refer to T-101 and T-102 General Note P.
Do you have a manufacturer of choice for the cable pathway materials? cable tray, j-hooks, etc…There is no manufacturer of choice. Please refer to project specifications under Division 27 for cabling manufacturer performance and compliance requirements.
Occupied Areas During Renovation
Will any areas of Building 1040 remain occupied during construction? If so, what are the specific requirements for work sequencing, dust control, and noise restrictions?
References:
Solicitation Document (Section 01 11 00, Page 1)
Specifications Vol. 1 (Section 01 14 00, Page 1)There may be some work concurrent with the occupation of the Data Center room 110. See sheet AE102 for phasing construction and secure door into room 110.
Millwork Material & Finish
The millwork drawings (Document: ATTACHMENT 1 - Drawings, Sheet AE420) reference laminate and wood veneer options, but the specifications (ATTACHMENT 2, Section 06 20 00) require NAAWS Custom Grade millwork.
Should all casework be fabricated to AWI Custom Grade standards, or are there any areas requiring Premium Grade?Refer to Spec Section 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets for all cabinet requirements. See Addendum 01.
The wood finish specifications require a clear factory finish but do not specify whether stain, lacquer, or polyurethane should be used.
Can you confirm the required finish type and sheen level for exposed millwork?Refer to Spec Section 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets for all cabinet requirements. See Addendum 01.
The cabinet hardware schedule (hinges, pulls, slides) is missing from the specifications.
Can the design team provide details on the required brand and model numbers?We are unable to specify brand names due to ECB No. 2022-1 Issued 07 Jan. 22 Subject: Prohibitions in the Use of Brand Name (or Equal) references in solicitations. Refer to Spec Section 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets for all cabinet hardware requirements.
The millwork details (Document: ATTACHMENT 1 - Drawings, Sheet AE420) require field verification before fabrication.
Should all casework be fully shop-assembled before delivery, or can some be field-assembled?Casework should be shop-assembled as much as possible. Some field assembly, including installation of filler panels (scribe) is to be expected.
The specifications state that cabinet edge banding must match the laminate color.
Can you confirm if 3mm PVC edge banding is required, or is thin laminate edge banding acceptable?Refer to Spec Section 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets 2.5 Edge Banding for requirements. 0.125 inch thick PVC vinyl edgebanding is required per the specification.
Drawings mention cleaning existing roof drains, but do not specify if additional capacity or replacements are required. Can you confirm?
References:
Specifications Vol. 1 (Section 22 00 00, Pages 1-2)
Drawings (Sheet P-105 - Roof Plumbing Plan)
Roof drains are to be cleared and cleaned of any debris. They are not required to be replaced and no further roof drains are planned. If a roof drain is beyond repair it is to be brought to the attention of the base Contracting Officer.
Can you confirm the final exterior window and door specifications? Drawings indicate storefront, triple-pane, laminated glazing, but specifications lack clarity on frame materials, security ratings, and impact resistance.
References:
Solicitation Document (Section 00 00 00, Page 3)
Specifications Vol. 1 (Section 08 41 13, Pages 1-2)
Drawings (Sheet AE201 - Exterior Elevations)Specification 08 41 13 requires storefront system to meet ASTM F162/F162M ratings for airblast. BKG
The door schedule (Document: ATTACHMENT 1 - Drawings, Sheet AE601) references security doors but lacks details on access control requirements.
Should all security doors be prepped for card readers, or will a separate contractor handle electronic hardware?See door hardware schedule Specification section 08 71 00. BKG
The door hardware specification (Document: ATTACHMENT 2, Section 08 71 00) lists panic devices and closers but does not specify which doors require them.
Can you provide a door-by-door schedule confirming where panic hardware is required?The doors that require panic devices (exit devices) are listed in the door hardware schedule at the end of Specification 08 71 00 Section 3.6. BKG
The aluminum-framed storefront system (Document: ATTACHMENT 2, Section 08 41 13) requires compliance with ASTM E330 for wind loads.
Has the structural analysis been completed for wind load calculations, or will the contractor be required to submit shop drawings for review?No structural analysis has been done to determine the loading requirements of the storefront system due to wind loads. The new storefront systems are to be mounted with existing framing system provided with the old windows. Shop drawings will be required for review using the existing structural system. BKG
The storefront glazing system (Document: ATTACHMENT 2, Section 08 41 13) specifies thermal break aluminum frames but does not clarify if low-e glazing is required.
Can you confirm the glass type, U-factor, and SHGC requirements for storefronts?Glazing requirements for Insulated Glazing at Alum Storefront systems are described in Specification Section 08 81 00 Glazing, Section 2.2. BKG
The door frame protection requirements (Document: ATTACHMENT 2, Section 08 34 73) mention sound-rated door frames but do not specify the STC rating.
Can you confirm the minimum STC rating required for all acoustically rated doors?The STC ratings are listed on the Door Schedule sheet AE601. BKG
The specifications call for Level 5 finish on all walls receiving eggshell or gloss paint but do not define critical lighting conditions.
Can the design team provide a reflected ceiling plan to determine where Level 5 finishing is required?Level 5 finishing is required in all occupied spaces, corridors, offices, assembly/conference rooms, etc.
The suspended ceiling specifications (Document: ATTACHMENT 2, Section 09 51 00) require a minimum NRC of 0.80 but do not specify tile dimensions.
Should all acoustic ceiling tiles be 2' x 2', or are 2' x 4' tiles acceptable?Refer to Specification 2.2 Acoustical Units; 2.2.1.6 Nominal Size 24 by 24 inch. Also refer to drawings, Reflected Ceiling Plans AE150-AE152 Typical Ceiling Legend indicates 2' x 2' ceiling grid. Interior Materials Legend IN600 ACP1 Size: 24" x 24" x 1"
The ACT system is required to meet ASTM E84 for flame spread.
Will the Government accept alternate ceiling tiles that meet Class A but have different texture or color?Alternate Ceiling Tiles that meet all salient characteristics indicated in specification and basis-of-design will be considered. In addition to meeting flame spread, alternates must meet all characteristics listed in 2.2.1.1 Type ACP1. Color must be white
Fire-Rated Wall (R6) Heights

Reference Documents: (Attachment 1 – Drawings (Provide specific sheet numbers if available), Attachment 2 – Specifications (Section 09 29 00, Section 07 84 00, and applicable details)

The drawings indicate that R6 fire-rated walls must extend to the roof deck, but exact floor-to-deck heights are not clearly stated in all locations.
Please confirm the specific heights for all R6 walls
Any specific UL-listed head-of-wall firestopping details that need to be followedThe wall to deck heights throughout the building are generally just over 12'-0" high per as-built drawings. These heights are not consistent and should be field verified. The wall to deck heights in the Multi-use Room 174 are generally 14'-0" and will also be required to be field verified. UL head of wall firestopping details will be added to the wall partitions drawing A-002.
The toilet partition specifications (Document: ATTACHMENT 2, Section 10 21 13) require HDPE partitions but do not confirm mounting methods.
Should partitions be floor-mounted or ceiling-hung?Partitions to be floor mounted overhead braced per specification. See 2.4 Overhead- Braced Partitions. Also refer to Interior Elevations C1/AE410 and C3/AE410 for depictions of partitions which show partition mounting styles.
The grab bars and toilet accessories (Document: ATTACHMENT 2, Section 10 21 13) must comply with ADA requirements, but exact mounting heights are missing.
Can the team confirm the required heights for grab bars, mirrors, and dispensers?Refer to A-001 Mounting Heights
Acoustical Wall Panels
The Room Finish Schedule (Document: ATTACHMENT 1 - Drawings, Sheet AE600) states that Break Room 145 is to receive Acoustical Wall Panels (AWP1). However, the Enlarged Plan AE403 does not specify which wall should receive the panels.
Can the design team confirm which wall in Break Room 145 should receive AWP1?Refer to Refer to Elevation B3/AE411 and Floor Finish Plans IN101 and IN102 for extent of AWP1. See Addendum 01.
The specifications for Acoustical Wall Panels (AWP1) (Document: ATTACHMENT 2, Section 09 72 00) indicate 1-inch-thick fiberglass panels with a minimum NRC of 0.80, but there is no mention of required manufacturers or acceptable alternatives.
Can the design team confirm whether specific manufacturers are pre-approved or if substitutions are permitted?Substitutions are permitted that meet the salient features of the basis-of-design product. Substitutions must meet characteristics listed in specification. See 2.2 Acoustical Wall Panel (AWP1)
The interior signage specifications (Document: ATTACHMENT 2, Section 10 14 00.20) require tactile letters and Braille, but do not specify font and character height.
Can you confirm the required font type, letter size, and mounting height for room identification signs?Refer to sheet IG501 signage details, which include font style and text height. Refer to Sheet IG502 for Signage Mounting details, which include mounting heights.
The signage specification mentions cybersecurity compliance, but there are no details on what this entails.
Does the signage system require network integration or electronic displays, or is this a reference to general facility security?No signs are currently identified to require integration. Spec will maintain in the event if directed to incorporate from the base.
Are there any areas that require special fire protection systems (e.g., clean agent suppression for data rooms/security vaults)?

References:

Specifications Vol. 2 (Section 21 13 13, Pages 1-5)
Drawings (Sheet FX101 - Fire Suppression Plan)See response to comment #43.
The specifications mention that a makeup water analysis is required for boiler water treatment, but it does not explicitly state whether a water softener is required for makeup water.
Please confirm if a water softener is required for the makeup water supply.

Reference:

Document: Attachment 3 - Specifications Volume 2
Section: 23 64 26 – Chilled, Chilled-Hot, and Condenser Water Piping Systems
Page: 23 64 26-2Provide makeup water analysis and treatment as specified.
Chilled Water Treatment – Is It Required?
The boiler loop requires chemical treatment, but no specifications were found for chilled water treatment.
Please confirm whether chilled water treatment is required, or if treatment is only necessary for the boiler loop.

Reference:

Document: Attachment 3 - Specifications Volume 2
Section: 23 64 26 – Chilled, Chilled-Hot, and Condenser Water Piping Systems
Page: 23 64 26-2Chilled water treatment is not required Section 23 64 26.
Heating or Chilled Water Loop Volumes – Available?
The documents provide flow rates for pumps and equipment, but they do not specify loop volumes for the heating or chilled water systems.
Can you provide the total system volume for both heating and chilled water loops? If unavailable, should the contractor estimate and provide this information as part of the submittals?

Reference:

Document: Attachment 3 - Specifications Volume 2
Section: 23 21 23 – Hydronic Pumps
Page: 23 21 23-3
Drawing: M-701 – Mechanical SchedulesHeating and chilled water loop volumes are unavailable.
The specifications confirm that the system is designed for glycol, but it is unclear whether the contractor is responsible for filling it or if it will be maintained by base personnel.
Please confirm if filling the chilled water system with a 50/50 glycol mixture is within the contractor’s scope, or if base maintenance personnel will handle this.

Reference:

Document: Attachment 3 - Specifications Volume 2
Section: 23 64 26 – Chilled, Chilled-Hot, and Condenser Water Piping Systems
Page: 23 64 26-3The specifications do not confirm or require any hydronic system is designed for 50/50 glycol water mixture.
AHU-3 & AHU-4 – Are They Properly Sized for 50/50 Glycol?
The specifications confirm that AHU-3 and AHU-4 require a 50/50 glycol mixture, but the AHU schedule does not explicitly confirm whether they were sized for glycol.
Please confirm if AHU-3 and AHU-4 were selected and sized for operation with 50/50 glycol.

Reference:

Document: Attachment 3 - Specifications Volume 2
Section: 23 81 00 – Decentralized Unitary HVAC Equipment
Page: 23 81 00-5
Drawing: M-701 – Mechanical SchedulesThe specifications do not confirm any hydronic system is designed for 50/50 glycol water mixture. AHU-3 and AHU-4 are not designed for or require a glycol water mixture.
Will substitutions be allowed for specified HVAC units if an equivalent model meets performance requirements?
If so, what is the approval process for alternate equipment that complies with Section 23 81 00 of the specifications (ATTACHMENT 2 - VOL 1, Page 320)?No specific products are identifieid. HVAC units shall meet the requirements of Section 23 81 00.
The mechanical specifications (Section 23 07 00) reference insulation requirements, but details on duct vapor barriers are unclear.
Could you confirm the type and thickness of insulation required for supply and return ductwork in unconditioned spaces?
(ATTACHMENT 2 - VOL 1, Page 290)?Vapor barriers shall meet the requirements of Section 23 07 00. Specification begins on page 99.
Are there specific balancing criteria for Testing, Adjusting, and Balancing (TAB) of HVAC systems beyond the general requirements listed in Section 23 05 93?
If so, are there any additional TAB reports or acceptance standards required? (ATTACHMENT 2 - VOL 1, Page 275)Testing, adjusting, and balancing of HVAC systems shall be in accordance with Section 23 05 93.
The project specifies BACnet Direct Digital Controls (DDC) for the HVAC system. Are all Building Automation System (BAS) connections pre-configured, or will additional programming and commissioning be required by the contractor to integrate controls into the base-wide system (ATTACHMENT 2 - VOL 1, Page 305)?Johnson Controls owns the DDC system at WRANGB. Contractor to corrdinate with JCI for all DDC work and tie in.
The specifications indicate the use of BACnet Direct Digital Controls (DDC) and reference ASHRAE 135 compliance. Johnson Controls Inc. (JCI) is mentioned in some areas. Will other control manufacturers be allowed to bid, provided they meet BACnet interoperability, are BTL listed, and comply with the project requirements (ATTACHMENT 3 - VOL 2, Section 23 09 23.02, Page 45)?Johnson Controls is not mentioned anywhere in the specifications. Manufacturers shall provide controls that are BACnet, BTL listed and comply with Section 23 09 23.02.
The panel schedules (Attachment 1 - Drawings, Sheets EP701-EP703) indicate estimated demand and connected loads but do not specify spare capacity.
Can you confirm the required spare capacity for each panel?Per UFC 3-520-01, minimum spare capacity to be provided is minimum 15% empty space and 15% spare ampacity.
Certain existing loads are not shown in the panel schedules (Attachment 1 - Drawings, Sheet EP701).
Should we assume all existing loads will remain, or will an updated panel schedule be provided?All existing loads to remain unless noted otherwise on panel schedules or floor plans.
The electrical one-line diagram does not specify the AIC rating required for the main service panel disconnect (Attachment 1 - Drawings, Sheet EP601).
Can you confirm the fault current rating for this disconnect?Main service panel (HDP) has integral main circuit breaker for the service disconnect rated at 35 kAIC per one-line and panel schedule.
What is the maximum allowable voltage drop for feeders and branch circuits? (Attachment 2 - Specifications Vol. 1, Section 26 20 00, Page 341Per UFC-3-501-01 permitted voltage drop for feeders and service conductors must be limited to 3%, branch circuits must be limited to 3%, with no greater than 5% total.
Is the contractor responsible for providing a short circuit coordination study and confirming proper breaker settings?
(Attachment 2 - Specifications Vol. 1, Section 26 20 00)Yes, see new specification section 26 05 73 provided in Addendum 01.
The electrical one-line diagram and plan views show conflicting generator and transfer switch locations.
Can you confirm the intended placement?
References: Specifications Vol. 1 (Section 26 32 15, Pages 1-3) ….&….Drawings (Sheet EP601 - Electrical One-Line Diagram & EP110 - Roof Power Plan)EP110, EP601 and Specifications Section 26 32 15 do not show generator and transfer switch locations. Refer to ES101 and EP101 for generator and ATS locations. One-line diagram depicts connections between electrical equipment and not locations.
What is the generator’s fuel source (diesel or natural gas) and the required fuel storage capacity?
(Attachment 2 - Specifications Vol. 1, Section 26 32 15, Page 360)Generator fuel source is diesel fuel. Provide 24 hours of run time fuel storage tank.
The specifications do not state if load bank testing is required for the generator.
If required, what duration and percentage load should be tested?
(Attachment 2 - Specifications Vol. 1, Section 26 32 15)The generator specifications reference testing in accordance with ISO 3046, IEEE 115, and NEMA MG1. These standards outline performance testing for the engine and generator but do not specifically require load bank testing.
Will the ATS be open-transition or closed-transition? (Attachment 2 - Specifications Vol. 1, Section 26 36 23, Page 365)ATS to be open-transition per Section 26 36 23 page 5.
What are the default factory settings for the ATS time delays?
(Attachment 2 - Specifications Vol. 1, Section 26 36 23, Page 368)Default factory settings will be provided by the ATS manufacturer.
Will there be separate ATS units for life safety, critical loads, and mechanical loads?
(Attachment 1 - Drawings, Sheet EP601)NEC 700 compliant ATS is not required. All egress lighting and FA are battery backed up.
Should we assume that all loads will transfer to emergency power during an outage, or will there be specific circuits that remain off?
(Attachment 2 - Specifications Vol. 1, Section 26 36 23)All circuits connected downstream of ATS will transfer to emergency power during outage.
Some LED fixtures are listed as MVOLT 120-277V.
Should we assume 277V as the standard, or are 120V circuits required? (Attachment 1 - Drawings, Sheet EL601)LED fixtures and exit signs vary in voltage throughout the building. Refer to reflected ceiling plans and lighting fixture schedule on EP601 .
Emergency lighting fixtures have a 90-minute battery backup, but the panel schedules do not indicate emergency circuits.
Should these be connected to generator-backed circuits? (Attachment 1 - Drawings, Sheet EP601)Battery-Equipped Emergency luminaires do not require to be connected to generator circuits.
The lighting control schedule references occupancy sensors and daylight harvesting but does not specify placement details.
Can you confirm sensor placement? (Attachment 2 - Specifications Vol. 1, Section 26 09 23, Page 314)Refer to reflected ceiling plans EL101 and EL102 for occupancy and daylighting sensor locations.
Will lighting controls be standalone, or will they be integrated into the Building Automation System (BAS)? (Attachment 1 - Drawings, Sheet EL601)Lighting controls will be standalone.
The specifications discuss control strategies but do not confirm if the system is networked.
Will the lighting controls be fully integrated with BAS or function independently? (Attachment 2 - Specifications Vol. 1, Section 26 09 23)Lighting control system is not networked.
The demolition drawings (ED101 & ED102) do not specify a detailed phasing plan.
Can the design team provide a phased demolition sequence to ensure office areas remain operational? (Attachment 1 - Drawings, Sheet ED101-ED102)General office areas should be vacant during construction. Coordination with base required.
Who is responsible for service shutdown coordination?
The General Contractor or the Government? (Attachment 2 - Specifications Vol. 1, Section 26 05 00, Page 289)Contractor is responsible but needs prior coordination.
If existing panels feeding critical areas are to be demolished, is the contractor responsible for providing temporary power solutions to maintain ongoing operations? (Attachment 1 - Drawings, Sheet EP601)Contractor is responsible for providing temporary power solutions to maintain ongoing operations in critical areas.
The specifications require no disruption to data server power.
Can the design team confirm if redundant UPS systems are in place for continuous operation? (Attachment 2 - Specifications Vol. 1, Section 27 10 00, Page 400)UPS systems are not in place for continuous operation.
Should the contractor provide temporary power or a bypass system during panel shutdowns affecting the server room? (Attachment 1 - Drawings, Sheet EP601)Yes provide temp power. Switch room and data center to remain operational at all times.
Will the contractor be required to retest all data circuits post-demolition to confirm signal integrity? (Attachment 2 - Specifications Vol. 1, Section 27 51 16, Page 415)Post-demolition testing is required for the following:

CAT6A (base standard for copper) is 10%

LC/LC SM Fiber (base standard for ISP fiber) is 100%

SC/APC to SC/APC SM Fiber (base standard for OSP fiber) is 100%

The specifications require post-demolition testing for data circuits, but they do not specify testing procedures or acceptable signal loss levels.
Will the Government provide a baseline signal integrity report for comparison? (Attachment 2 - Specifications Vol. 1, Section 27 51 16)Category 6A:

Maximum Channel Length: 100 meters (328 feet) Maximum Insertion Loss at 100 MHz: 20 dB Maximum Insertion Loss at 500 MHz: 24 dB

LC/LC SM Fiber loss cannot exceed 1.5db

Can you confirm whether the entire existing data system (wiring, servers, trays, etc.) is to be fully replaced, or are portions being retained?
References:
Specifications Vol. 2 (Section 27 10 00, Pages 1-5)
Drawings (Sheet T-101 - Telecommunications Floor Plan)All telecommunications cabling by Owner. Contractor telecommunications rough in only. Contractor to coordinate with base to ensure rough-in match their needs. Refer to T-101 and T-102 General Note P.
What are the clearance and work restrictions for contractors in and around the high-security vault? Will escort access be required?
References:
Solicitation Document (Section 01 14 00, Page 3)Escort will be required and provided.
Can you confirm the required shielded vs. unshielded twisted-pair cabling?
(Ref: ATTACHMENT 2 - Project Specifications, Section 27 10 00)All telecommunications cabling by Owner. Contractor telecommunications rough in only. Contractor to coordinate with base to ensure rough-in match their needs. Refer to T-101 and T-102 General Note P.
What are the firestopping and conduit pathway requirements for secure data cables? (Ref: ATTACHMENT 2 - Project Specifications, Division 7 & ATTACHMENT 1 - Project Drawings)Firestopping and conduit pathways to comply with Division 7, 27 and 28 specifications. In addition to NIST SP 800-53, UFC 3-580-01 and UFC 4-010-06
Are specific brand-name networking components required, or will equivalent alternatives be accepted?There is no manufacturer of choice. Please refer to project specifications under Division 27 for manufacturer performance and compliance requirements.
Should old data equipment be returned, destroyed, or repurposed?Return to base
What are the cybersecurity compliance requirements (e.g., DoD STIG, NIST 800-53, UFC 4-010-06)?Comply with specifications section 25 05 11.01
Who is responsible for cybersecurity patching and compliance updates post-installation?Base is responsible for all patching and compliance of equipment. The contractor will not have the ability to access equipment to perform these functions.
Are there long-term maintenance obligations for installed network infrastructure?No
Will data infrastructure require dedicated surge protection and grounding?
(Ref: ATTACHMENT 2 - Project Specifications, Section 27 05 26)Refer to T-601 for grounding requirements and specifications section 27 10 00 for surge protection requirements.
Are there network security equipment mounting requirements specified?Refer to specifications section 27 10 00 for equipment mounting requirements.
Will the contractor need to coordinate structured cabling paths with other trades?Yes
Fiber optic backbone routing discrepancy - T-601 (ATTACHMENT 1 - Project Drawings) and EP601 (ATTACHMENT 1 - Project Drawings) show different requirements—
please confirm which is correct.Comment does not appear to apply building 1040.
Backbone cabling type conflict - ATTACHMENT 2 - Project Specifications (Section 27 13 23) states all backbone cabling must be single-mode fiber, but ATTACHMENT 1 - Project Drawings (T-601) references multimode fiber in certain locations.
Which is correct?All telecommunications cabling by Owner. Contractor telecommunications rough in only. Contractor to coordinate with base to ensure rough-in match their needs. Refer to T-101 and T-102 General Note P.
Cable tray material conflict - ATTACHMENT 2 - Project Specifications (Section 27 05 28.36) specifies aluminum trays, while ATTACHMENT 1 - Project Drawings (T-501) shows steel trays.
Please clarify.Spec section 27 05 28.36 specifies steel, T-501 does not indicate steel or aluminum trays.
UPS backup requirements discrepancy - Electrical one-line diagrams (EP701) in ATTACHMENT 1 - Project Drawings list UPS backup requirements that do not align with telecom plans.
Which is correct?Comment does not appear to apply building 1040.
ATTACHMENT 2 - Project Specifications (Section 27 10 00) references shielded cabling, but ATTACHMENT 1 - Project Drawings specify unshielded.
Which is correct?All telecommunications cabling by Owner. Contractor telecommunications rough in only. Contractor to coordinate with base to ensure rough-in match their needs. Refer to T-101 and T-102 General Note P.
Data rack placements discrepancy - ATTACHMENT 1 - Project Drawings (T-101) shows different placements than TY-102 (ATTACHMENT 1 - Project Drawings).
Which location is correct?TY-102 does not show any rack placement/location.
Firewall penetration sealants are mentioned in ATTACHMENT 2 - Project Specifications (Division 7), but no reference exists in ATTACHMENT 3 - Project Specifications (Volume 2) for data scope
should they be included?Yes, firestop is required to be installed where appropriate and the installation must be done by an approved fire stop installer with labels and shop drawings. See specification 07 84 00. Firestopping and conduit pathways to comply with Division 7, 27 and 28 specifications. In addition to NIST SP 800-53, UFC 3-580-01 and UFC 4-010-06
What is the required cable tray weight capacity? (Ref: ATTACHMENT 2 - Project Specifications, Section 27 10 00)Refer to specifications section 27 05 28.36 40 NEC and NEMA VE1 for cable tray weight capacity.
Are structured cabling testing and certification standards (e.g., Cat 6A or fiber optic testing) required? (Ref: ATTACHMENT 2 - Project Specifications, Section 27 13 23)Post-construction testing is required for the following:

CAT6A (base standard for copper) is 10% LC/LC SM Fiber (base standard for ISP fiber) is 100% SC/APC to SC/APC SM Fiber (base standard for OSP fiber) is 100%

Should junction boxes for data terminations be included (marked in ATTACHMENT 1 - Project Drawings, but absent in ATTACHMENT 2 - Project Specifications)?Junction boxes to be included for data terminations.
What are the security protocols for handling and storing network equipment before installation? (Ref: ATTACHMENT 2 - Project Specifications, Section 27 05 11)Referenced specification section was not included by AE. No network equipment provided with this project.
Is there a required chain of custody for secure data transport?Secure data is not anticipated to be impacted; however, coordination with Comm personnel is required if the problem arises.
Should existing network equipment be removed under a specific protocol?Yes coordinate with base communications squadron during demo.
Are there clear directives on grounding and surge protection for network cabinets? (Ref: ATTACHMENT 2 - Project Specifications, Section 27 05 26)Refer to T-601 for grounding requirements and specifications section 27 10 00 for surge protection requirements. Referenced spec section not included.
How should patch panels be labeled and terminated to comply with standards? (Ref: ATTACHMENT 2 - Project Specifications, Section 27 10 00)Per 27 10 00 provide a labeling system for cabling as required by TIA-606 and UL969.
Does this project require compliance with FIPS 140-2 for encryption and access controls?Yes, refer to specifications section 25 05 11.01
What are the encryption and access control requirements for the installed systems?Refer to specifications section 25 05 11.01
Are secure cabling pathways and data separation methods required?Dedicated pathway for communications backbone from main telecommunications room to telecommunications room 170. Follow conduit requirements per sheet EP102 keynote 2.
Are there specific telecommunications space environmental requirements (HVAC, humidity, power backup)?Telecommunication rooms HVAC equipment existing to remain.
Are there any known underground utilities or obstructions that could impact excavation for new utility tie-ins?

References:

Drawings (Sheet CU101 - Overall Utility Plan)

Specifications Vol. 1 (Section 01 11 00, Page 2)Not that hasn't already been addressed.
There is no clear tie-in detail for existing utilities. Should we assume they are sufficient for the new loads, or will testing determine necessary upgrades?
References: Drawings (Sheet CU101 - Overall Utility Plan & CU102 - Enlarged Utility Plan)The Water & Comm are on separate plans with pp sheets
For OLI #1 (replacement of all existing windows), The specs are pretty vague about what is wanted. Prints say, “Aluminum Store Front System”. Is standard storefront aluminum acceptable? (metal profile would be 2” X 4 1/2” or 2” X 6”) Will this be center set? Specs lead me to believe these windows will be a kynar color, can you confirm? Prints also show the removal of what appears to be operable windows, replacing them with complete fixed windows, is this accurate? Window Elevations show all new windows to not be divided at all height wise, and be one full glass unit, this accurate? Does the store front aluminum and glass here require engineered calculations?The storefront elevations are to match existing. The color is a kynar bronze. The existing windows are not operable. No engineered calculations are required unless part of the AT/FP requirements.
Interior window ‘IN3’ shows on page AE601 to be a standard pass-through window with both sides operable (sliding left and right), using standard 1/4” clear temp. Detail B1 on page AE502 says “Stainless Seal Transaction Window”. Please confirm which it is.Transaction window note has been changed. Transaction window can be any metal material.
Same questions for the two new exterior aluminum door frames and glass for doors 101A and 171A, do these need engineered calculations? Exterior Elevations show doors 101A and 171A to have drawn hatch lines on the bottom sidelights of the door frame where glass would go. What is this representing? Mapes paneling? Please clarify.Alum doors do not require calculations. See revised door elevations on sheet AE601.