01 45 35.pdf
PDF 59 KB Posted
- Solicitation number
- W50S8T25BA011
- Issued by
-
Department of the Army National Guard
About this file
This is a Special Inspections specification section (01 45 35) for the 137th SOW Oklahoma ANG B-3 100% Repair Building 1040 project, outlining requirements for third-party special inspection services. The document details qualifications required for Special Inspectors (SI) and Associate Special Inspectors (ASI) across multiple disciplines including steel construction, welding, concrete, masonry, wood construction, and soils inspection.
The specification requires the contractor to retain qualified independent third-party special inspectors, with specific certification requirements listed for each inspection type. Key requirements include maintaining daily and biweekly inspection reports, documentation of discrepancies, and submission of interim reports for each Definable Feature of Work (DFOW) as well as a comprehensive final report. The Special Inspector of Record (SIOR) must be a licensed engineer responsible for supervising all special inspectors. The document emphasizes that special inspections are supplemental to the contractor's quality control program and do not replace standard three-phase control inspections or other required testing.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
137TH SOW OKLAHOMA ANG B- 3 100% REPAI R BUI LDI NG 1040
OKLAHOMA CI TY, OK 12 SEPTEMBER, 2024
SECTI ON 01 45 35
SPECI AL I NSPECTI ONS
11/ 20
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN SOCI ETY OF CI VI L ENGI NEERS ( ASCE)
ASCE 7- 16 ( 2017; Er r at a 2018; Supp 1 2018) Mi ni mum Desi gn Loads and Associ at ed Cr i t er i a f or Bui l di ngs and Ot her St r uct ur es
I NTERNATI ONAL CODE COUNCI L ( I CC)
I CC I BC ( 2021) I nt er nat i onal Bui l di ng Code
1. 2 GENERAL REQUI REMENTS
Per f or m Speci al I nspect i ons i n accor dance wi t h t he St at ement of Speci al I nspect i ons, Schedul e of Speci al I nspect i ons and Chapt er 17 of I CC I BC.
The St at ement of Speci al I nspect i ons and Schedul e of Speci al I nspect i ons ar e i ncl uded i n t he const r uct i on dr awi ngs, Sheet s G- 201 and G- 202 as an at t achment t o t hi s speci f i cat i on. Speci al I nspect i ons ar e t o be per f or med by an i ndependent t hi r d par t y and ar e i nt ended t o ensur e t hat t he wor k of t he Pr i me Cont r act or i s i n accor dance wi t h t he Cont r act Document s and appl i cabl e bui l di ng codes. Speci al i nspect i ons do not t ake t he pl ace of t he t hr ee phases of cont r ol i nspect i ons per f or med by t he Cont r act or ' s QC Manager or any t est i ng and i nspect i ons r equi r ed by ot her sect i ons of t he speci f i cat i ons.
1. 3 DEFI NI TI ONS
1. 3. 1 Cont i nuous Speci al I nspect i ons
Cont i nuous Speci al I nspect i ons i s t he const ant moni t or i ng of speci f i c t asks by a speci al i nspect or . These i nspect i ons must be car r i ed out cont i nuousl y over t he dur at i on of t he par t i cul ar t asks.
1. 3. 2 Per f or m
Per f or m t hese Speci al I nspect i ons t asks f or each wel ded j oi nt or member .
1. 3. 3 Obser ve
Obser ve t hese Speci al I nspect i ons i t ems on a per i odi c dai l y basi s.
Oper at i ons need not be del ayed pendi ng t hese i nspect i ons.
1. 3. 4 Speci al I nspect or ( SI )
A qual i f i ed per son r et ai ned by t he Cont r act or and appr oved by t he Cont r act i ng Of f i cer as havi ng t he compet ence necessar y t o i nspect a
SECTI ON 01 45 35 Page 1
Gallagher, Brad K.
Text Box
ADDENDUM #1 02-17-2025
Gallagher, Brad K.
Cloud
Gallagher, Brad K.
Cloud
Gallagher, Brad K.
Text Box
ADDENDUM #1 02-17-2025
Gallagher, Brad K.
Cloud par t i cul ar t ype of const r uct i on r equi r i ng Speci al I nspect i ons. The SI must be an i ndependent t hi r d par t y hi r ed di r ect l y by t he Pr i me Cont r act or .
1. 3. 5 Associ at e Speci al I nspect or ( ASI )
A qual i f i ed per son who assi st s t he SI i n per f or mi ng Speci al I nspect i ons but must per f or m i nspect i on under t he di r ect super vi s i on of t he SI and cannot per f or m i nspect i ons wi t hout t he SI on si t e.
1. 3. 6 Thi r d Par t y
A Speci al i nspect or must not be an empl oyee of t he Cont r act or or of any Sub- Cont r act or per f or mi ng t he wor k t o be i nspect ed.
1. 3. 7 Speci al I nspect or of Recor d ( SI OR)
A l i censed engi neer i n r esponsi bl e char ge of super vi s i on of al l speci al i nspect or s f or t he pr oj ect and appr oved by t he Cont r act i ng Of f i cer . The SI OR must be an i ndependent t hi r d par t y ent i t y hi r ed di r ect l y by t he Pr i me Cont r act or .
1. 3. 8 Cont r act i ng Of f i cer
The Gover nment of f i c i al havi ng over al l aut hor i t y f or admi ni st r at i ve cont r act i ng act i ons. Cer t ai n cont r act i ng act i ons may be del egat ed t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) .
1. 3. 9 Cont r act or ' s Qual i t y Cont r ol ( QC) Manager
An i ndi v i dual r et ai ned by t he Pr i me Cont r act or and qual i f i ed i n accor dance wi t h t he Sect i on havi ng t he over al l r esponsi bi l i t y f or t he Cont r act or ' s QC or gani zat i on.
1. 3. 10 St r uct ur al Engi neer of Recor d ( SER)
A r egi st er ed desi gn pr of essi onal cont r act ed by t he Gover nment as an A/ E r esponsi bl e f or t he over al l desi gn and r evi ew of submi t t al document s pr epar ed by ot her s. The SER i s r egi st er ed or l i censed t o pr act i ce t hei r r espect i ve desi gn pr of essi on as def i ned by t he st at ut or y r equi r ement s of t he pr of essi onal r egi st r at i on l aws i n t he st at e i n whi ch t he desi gn pr of essi onal wor ks. The SER i s al so r ef er r ed t o as t he Engi neer of Recor d ( EOR) i n desi gn code document s.
1. 3. 11 St at ement of Speci al I nspect i ons ( SSI )
A document devel oped by t he SER i dent i f y i ng t he mat er i al , syst ems, component s and wor k r equi r ed t o have Speci al I nspect i ons. Thi s st at ement i s i ncl uded at t he end of t hi s speci f i cat i on.
1. 3. 12 Schedul e of Speci al I nspect i ons ( SSI )
A schedul e whi ch l i s t s each of t he r equi r ed Speci al I nspect i ons, t he ext ent t o whi ch each Speci al I nspect i on i s t o be per f or med, and t he r equi r ed f r equency f or each i n accor dance wi t h I CC I BC Chapt er 17. Thi s schedul e i s i ncl uded at t he end of t hi s speci f i cat i on.
1. 3. 13 Desi gnat ed Sei smi c Syst ems ( DSS)
Those nonst r uct ur al component s t hat r equi r e desi gn i n accor dance wi t h
SECTI ON 01 45 35 Page 2
ASCE 7- 16 Chapt er 13 and f or whi ch t he component i mpor t ance f act or , I p, i s gr eat er t han 1. 0. Thi s desi gnat i on appl i es t o syst ems t hat ar e r equi r ed t o be oper at i onal f ol l owi ng t he Desi gn Ear t hquake f or RC I - I V st r uct ur es and f ol l owi ng t he MCER f or RC V st r uct ur es. Al l syst ems i n RC V f aci l i t i es desi gnat ed as MC- 1 i n accor dance wi t h UFC 3- 301- 02 ar e consi der ed par t of t he Desi gnat ed Sei smi c Syst ems. Desi gnat ed Sei smi c Syst ems wi l l have an I mpor t ance Fact or I p = 1. 5.
1. 3. 14 Def i nabl e Feat ur e of Wor k ( DFOW)
An i nspect i on gr oup t hat i s separ at e and di st i nct f r om ot her i nspect i on gr oups, havi ng i nspect i on r equi r ement s or i nspect or s t hat ar e uni que.
1. 4 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
SD- 06 Test Repor t s
Speci al I nspect i ons Dai l y Repor t s
Speci al I nspect i ons Bi weekl y Repor t s
SD- 07 Cer t i f i cat es
AI SC Cer t i f i ed St eel Fabr i cat or
Cer t i f i cat e of Compl i ance
Speci al I nspect or Qual i f i cat i ons; G
SD- 11 Cl oseout Submi t t al s
I nt er i m Repor t of Speci al I nspect i ons f or Each DFOW; G
SECTI ON 01 45 35 Page 3
Compr ehensi ve Fi nal Repor t of Speci al I nspect i ons; G
1. 5 SPECI AL I NSPECTOR QUALI FI CATI ONS
Submi t qual i f i cat i ons f or each speci al i nspect or .
1. 5. 1 St eel Const r uct i on and Hi gh St r engt h Bol t i ng
1. 5. 1. 1 Speci al I nspect or
a. I CC St r uct ur al St eel and Bol t i ng Speci al I nspect or cer t i f i cat e wi t h one year of r el at ed exper i ence, or
b. Regi st er ed Pr of essi onal Engi neer wi t h t hr ee year s of r el at ed exper i ence
1. 5. 1. 2 Associ at e Speci al I nspect or
Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.
1. 5. 2 Wel di ng St r uct ur al St eel
1. 5. 2. 1 Speci al I nspect or
a. I CC St r uct ur al Wel di ng Speci al I nspect or cer t i f i cat e wi t h one year of r el at ed exper i ence, or
b. AWS Cer t i f i ed Wel di ng I nspect or
1. 5. 2. 2 Associ at e Speci al I nspect or
AWS Cer t i f i ed Associ at e Wel di ng I nspect or
1. 5. 3 Nondest r uct i ve Test i ng of Wel ds
1. 5. 3. 1 Speci al I nspect or
NDT Level I I I Cer t i f i cat e
1. 5. 3. 2 Associ at e Speci al I nspect or
NDT Level I I Cer t i f i cat e pl us one year of r el at ed exper i ence
1. 5. 4 Col d For med St eel Fr ami ng
1. 5. 4. 1 Speci al I nspect or
a. I CC St r uct ur al St eel and Bol t i ng Speci al I nspect or cer t i f i cat e wi t h one year of r el at ed exper i ence, or
b. I CC Commer ci al Bui l di ng I nspect or wi t h one year of exper i ence, or
c. I CC Resi dent i al Bui l di ng I nspect or wi t h one year of exper i ence, or
d. Regi st er ed Pr of essi onal Engi neer wi t h t hr ee year s r el at ed exper i ence
1. 5. 4. 2 Associ at e Speci al I nspect or
Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.
SECTI ON 01 45 35 Page 4
1. 5. 5 Concr et e Const r uct i on
1. 5. 5. 1 Speci al I nspect or
a. I CC Rei nf or ced Concr et e Speci al I nspect or Cer t i f i cat e wi t h one year of r el at ed exper i ence, or
b. ACI Concr et e Const r uct i on Speci al I nspect or , or
c. Regi st er ed Pr of essi onal Engi neer wi t h t hr ee year s of r el at ed exper i ence
1. 5. 5. 2 Associ at e Speci al I nspect or
a. ACI Concr et e Const r uct i on Speci al I nspect or i n Tr ai ni ng, or
b. Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence
1. 5. 6 Masonr y Const r uct i on
1. 5. 6. 1 Speci al I nspect or
a. I CC St r uct ur al Masonr y Speci al I nspect or Cer t i f i cat e wi t h one year of r el at ed exper i ence, or
b. Regi st er ed Pr of essi onal Engi neer wi t h t hr ee year s of r el at ed exper i ence
1. 5. 6. 2 Associ at e Speci al I nspect or
Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.
1. 5. 7 Wood
1. 5. 7. 1 Speci al I nspect or
a. I CC Commer ci al Bui l di ng I nspect or Cer t i f i cat e wi t h one year of r el at ed exper i ence, or
b. I CC Resi dent i al Bui l di ng I nspect or wi t h on year of exper i ence, or
c. Regi st er ed Pr of essi onal Engi neer wi t h t hr ee year s of r el at ed exper i ence
1. 5. 7. 2 Associ at e Speci al I nspect or
Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.
1. 5. 8 Ver i f i cat i on of Si t e Soi l Condi t i on, Fi l l Pl acement and Load- Bear i ng Requi r ement s
1. 5. 8. 1 Speci al I nspect or
a. I CC Soi l s Speci al I nspect or Cer t i f i cat e wi t h one year of r el at ed exper i ence, or
b. NI CET Soi l s Techni c i an Level I I Cer t i f i cat e i n Const r uct i on Mat er i al Test i ng, or
c. Geol ogi st - I n- Tr ai ni ng wi t h t hr ee year s of r el at ed exper i ence, or
SECTI ON 01 45 35 Page 5
d. Regi st er ed Pr of essi onal Engi neer wi t h t hr ee year s of r el at ed exper i ence
1. 5. 8. 2 Associ at e Speci al I nspect or
a. NI CET Soi l s Techni c i an Level I Cer t i f i cat e i n Const r uct i on Mat er i al Test i ng wi t h one year of r el at ed exper i ence, or
b. Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence
1. 5. 9 Mast i c and I nt umescent Fi r e Resi st ant Coat i ngs
1. 5. 9. 1 Speci al I nspect or
a. I CC Spr ay- appl i ed Fi r epr oof i ng Speci al I nspect or Cer t i f i cat e, or
b. I CC Fi r e I nspect or I Cer t i f i cat e wi t h one year of r el at ed exper i ence, or
c. Regi st er ed Pr of essi onal Engi neer or Ar chi t ect wi t h r el at ed exper i ence
1. 5. 9. 2 Associ at e Speci al I nspect or
Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.
1. 5. 10 Fi r e- Resi st ant Penet r at i ons and Joi nt s
1. 5. 10. 1 Speci al I nspect or
a. Passed t he UL Fi r est op Exam wi t h one year of r el at ed exper i ence, or
b. Passed t he FM Fi r est op Exam wi t h one year of r el at ed exper i ence, or
c. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence
1. 5. 10. 2 Associ at e Speci al I nspect or
Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.
1. 5. 11 Smoke Cont r ol
1. 5. 11. 1 Speci al I nspect or
a. AABC Techni c i an Cer t i f i cat i on wi t h one year of r el at ed exper i ence, or
b. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence
1. 5. 11. 2 Associ at e Speci al I nspect or
Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.
PART 2 PRODUCTS
2. 1 FABRI CATOR SPECI AL I NSPECTI ONS
Speci al I nspect i ons of f abr i cat or ' s wor k per f or med i n t he f abr i cat or ' s shop i s r equi r ed t o be i nspect ed i n accor dance wi t h t he St at ement of Speci al I nspect i ons and t he Schedul e of Speci al I nspect i ons unl ess t he f abr i cat or i s cer t i f i ed by t he appr oved agency t o per f or m such wor k wi t hout Speci al I nspect i ons. Submi t t he f ol l owi ng cer t i f i cat i on
SECTI ON 01 45 35 Page 6 cer t i f i cat i ons t o t he Cont r act i ng Of f i cer f or i nf or mat i on t o al l ow wor k per f or med i n t he f abr i cat or ' s shop t o not be subj ect ed t o Speci al I nspect i ons.
AI SC Cer t i f i ed St eel Fabr i cat or .
At t he compl et i on of f abr i cat i on, submi t a cer t i f i cat e of compl i ance, t o be i ncl uded wi t h t he compr ehensi ve f i nal r epor t of Speci al I nspect i ons, st at i ng t hat t he mat er i al s suppl i ed and wor k per f or med by t he f abr i cat or ar e i n accor dance wi t h t he const r uct i on document s.
PART 3 EXECUTI ON
3. 1 RESPONSI BI LI TI ES
3. 1. 1 Qual i t y Cont r ol Manager
a. Super vi se al l Speci al I nspect or s r equi r ed by t he Cont r act Document s and t he I BC.
b. Ver i f y t he qual i f i cat i ons of al l of t he Speci al I nspect or s.
c. Ver i f y t he qual i f i cat i ons of f abr i cat or s.
d. Mai nt ai n a 3- r i ng bi nder f or t he Speci al I nspect or ' s dai l y and bi weekl y r epor t s. Thi s f i l e must be l ocat ed i n a conspi cuous pl ace i n t he pr oj ect t r ai l er / of f i ce t o al l ow r evi ew by t he Cont r act i ng Of f i cer and t he SER.
e. Mai nt ai n a r ewor k i t ems l i s t t hat i ncl udes di scr epanci es not ed on t he Speci al I nspect or s dai l y r epor t .
3. 1. 2 Speci al I nspect or s
a. I nspect al l el ement s of t he pr oj ect f or whi ch t he speci al i nspect or i s qual i f i ed t o i nspect and ar e i dent i f i ed i n t he Schedul e of Speci al I nspect i ons.
b. At t end pr epar at or y phase meet i ngs r el at ed t o t he Def i nabl e Feat ur e of Wor k ( DFOW) f or whi ch t he speci al i nspect or i s qual i f i ed t o i nspect .
f . Submi t a copy of t he dai l y r epor t s t o t he QC Manager .
g. Repor t di scr epanci es t hat ar e obser ved dur i ng Speci al I nspect i ons t o t he QC Manager f or cor r ect i on. I f di scr epanci es ar e not cor r ect ed bef or e t he speci al i nspect or l eaves t he si t e t he obser ved di scr epanci es must be document ed i n t he dai l y r epor t .
h. Submi t a bi weekl y Speci al I nspect i on Repor t unt i l al l i nspect i ons ar e compl et e. A r epor t i s r equi r ed f or each bi weekl y per i od i n whi ch Speci al I nspect i ons act i v i t y occur s, and must i ncl ude t he f ol l owi ng:
( 1) A br i ef summar y of t he wor k per f or med dur i ng t he r epor t i ng t i me f r ame.
( 2) Changes and di scr epanci es wi t h t he dr awi ngs, speci f i cat i ons t hat wer e obser ved dur i ng t he r epor t i ng per i od.
( 3) Di scr epanci es whi ch wer e r esol ved or cor r ect ed.
SECTI ON 01 45 35 Page 7
( 4) A l i s t of nonconf or mi ng i t ems r equi r i ng r esol ut i on.
( 5) Al l appl i cabl e t est r esul t i ncl udi ng nondest r uct i ve t est i ng r epor t s.
i . At t he compl et i on of each DFOW r equi r i ng Speci al I nspect i ons, submi t an i nt er i m r epor t of Speci al I nspect i ons t hat document s t he Speci al I nspect i ons compl et ed f or t hat DFOW. I dent i f y t he i nspect or r esponsi bl e f or each i t em i nspect ed and cor r ect i ons of al l di scr epanci es not ed i n t he dai l y r epor t s. The i nt er i m r epor t of Speci al I nspect i ons must be si gned, dat ed and i ndi cat e t he cer t i f i cat i on of t he speci al i nspect or qual i f y i ng t hem t o conduct t he i nspect i on.
j . At t he compl et i on of t he pr oj ect submi t a compr ehensi ve f i nal r epor t of Speci al I nspect i ons t hat document s t he Speci al I nspect i ons compl et ed f or t he pr oj ect and cor r ect i ons of al l di scr epanci es not ed i n t he dai l y r epor t s. The compr ehensi ve f i nal r epor t of Speci al I nspect i ons must be si gned, dat ed and i ndi cat e t he cer t i f i cat i on of t he speci al i nspect or qual i f y i ng t hem t o conduct t he i nspect i on.
3. 2 DEFECTI VE WORK
Check wor k as i t pr ogr esses, but f ai l ur e t o det ect any def ect i ve wor k or mat er i al s must i n no way pr event l at er r ej ect i on i f def ect i ve wor k or mat er i al s ar e di scover ed, nor obl i gat e t he Cont r act i ng Of f i cer t o accept such wor k.
- - End of Sect i on - -
SECTI ON 01 45 35 Page 8
| 01 45 35 - SPECIAL INSPECTIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 GENERAL REQUIREMENTS |
| 1.3 DEFINITIONS |
| 1.3.1 Continuous Special Inspections |
| 1.3.2 Perform |
| 1.3.3 Observe |
| 1.3.4 Special Inspector SI |
| 1.3.5 Associate Special Inspector ASI |
| 1.3.6 Third Party |
| 1.3.7 Special Inspector of Record SIOR |
| 1.3.8 Contracting Officer |
| 1.3.9 Contractor's Quality Control QC Manager |
| 1.3.10 Structural Engineer of Record SER |
| 1.3.11 Statement of Special Inspections SSI |
| 1.3.12 Schedule of Special Inspections SSI |
| 1.3.13 Designated Seismic Systems DSS |
| 1.3.14 Definable Feature of Work DFOW |
| 1.4 SUBMITTALS |
| 1.5 SPECIAL INSPECTOR QUALIFICATIONS |
| 1.5.1 Steel Construction and High Strength Bolting |
| 1.5.1.1 Special Inspector |
| 1.5.1.2 Associate Special Inspector |
| 1.5.2 Welding Structural Steel |
| 1.5.2.1 Special Inspector |
| 1.5.2.2 Associate Special Inspector |
| 1.5.3 Nondestructive Testing of Welds |
| 1.5.3.1 Special Inspector |
| 1.5.3.2 Associate Special Inspector |
| 1.5.4 Cold Formed Steel Framing |
| 1.5.4.1 Special Inspector |
| 1.5.4.2 Associate Special Inspector |
| 1.5.5 Concrete Construction |
| 1.5.5.1 Special Inspector |
| 1.5.5.2 Associate Special Inspector |
| 1.5.6 Masonry Construction |
| 1.5.6.1 Special Inspector |
| 1.5.6.2 Associate Special Inspector |
| 1.5.7 Wood |
| 1.5.7.1 Special Inspector |
| 1.5.7.2 Associate Special Inspector |
| 1.5.8 Verification of Site Soil Condition, Fill Placement and Load-Bearing |
| 1.5.8.1 Special Inspector |
| 1.5.8.2 Associate Special Inspector |
| 1.5.9 Mastic and Intumescent Fire Resistant Coatings |
| 1.5.9.1 Special Inspector |
| 1.5.9.2 Associate Special Inspector |
| 1.5.10 Fire-Resistant Penetrations and Joints |
| 1.5.10.1 Special Inspector |
| 1.5.10.2 Associate Special Inspector |
| 1.5.11 Smoke Control |
| 1.5.11.1 Special Inspector |
| 1.5.11.2 Associate Special Inspector |
| PART 2 PRODUCTS |
| 2.1 FABRICATOR SPECIAL INSPECTIONS |
| PART 3 EXECUTION |
| 3.1 RESPONSIBILITIES |
| 3.1.1 Quality Control Manager |
| 3.1.2 Special Inspectors |
3.2 DEFECTIVE WORK
File details come from the government source that posted it. Updated .