Addendum 01 Narrative.docx

DOCX document 65 KB Posted

Attached to
137th SOW - Building 1040 Repair / Renovation Project
Solicitation number
W50S8T25BA011
Issued by

About this file

This is an Addendum dated February 17, 2025 for the renovation of Building 1040 at the 137th Will Rogers Air National Guard Base in Oklahoma City. The addendum modifies the original bidding documents dated September 12, 2024, with extensive revisions to 14 specification sections and 16 drawing sheets, totaling 152 pages.

The key modifications include changes to finish carpentry, aluminum doors and frames, glazing, toilet compartments, lockers, cell phone lockers, and removal of rooftop fall protection anchors specifications. Notable drawing revisions affect partition types, floor plans, ceiling plans, building elevations, and room finish schedules. The related solicitation (W50S8T25BA011) is a 100% small business set-aside under NAICS 236220 with a project magnitude of $5-10 million. A pre-bid conference is scheduled for January 27, 2025 at 1000 CST, with bids due February 27, 2025 at 1000 CST. The Army National Guard anticipates funds will become available prior to September 30, 2025, though funds are not currently available.

View the file

Other files

File Type Posted
Abstract (Final).pdf PDF
Amendment 3 Attachment 1 - Bldg 1040 Reno Questions and Answers.docx DOCX document
Solicitation Amendment 3 W50S8T25BA0110003.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 1.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 2.pdf PDF
Amendment 2 Attachment 2 - 09 72 00.pdf PDF
Amendment 2 Attachment 5 - IN600 - INTERIORS MATERIALS LEGEND.pdf PDF
Amendment 2 Attachment 3 - A-002 - PARTITION TYPES.pdf PDF
Amendment 2 Attachment 6 - Bldg 1040 Reno Questions and Answers.xlsx XLSX spreadsheet
Amendment 2 Attachment 1 - Addendum 02 Narrative.docx DOCX document
Solicitation Amendment 2 W50S8T25BA0110002.pdf PDF
Amendment 2 Attachment 4 - 08 11 16.pdf PDF
06 20 00.pdf PDF
21 13 13.pdf PDF
IN101 - FLOOR FINISH PLAN - SECTOR A.pdf PDF
Bldg 1040 Reno Questions and Answers - FSB and GOV Reponses.xlsx XLSX spreadsheet
EL101 - ELECTRICAL INTERIOR LIGHTING PLAN - SECTOR A.pdf PDF
AE102 - FLOOR PLAN - SECTOR A.pdf PDF
AE502 - DETAILS.pdf PDF
AE403 - ENLARGED PLANS.pdf PDF
10 21 13.pdf PDF
10 51 13.pdf PDF
08 41 13.pdf PDF
AE103 - FLOOR PLAN - SECTOR B.pdf PDF
08 81 00.pdf PDF
AE411 - INTERIOR ELEVATIONS.pdf PDF
AE402 - ENLARGED PLANS.pdf PDF
AE601 - DOOR SCHEDULE AND DETAILS.pdf PDF
26 05 73.pdf PDF
08 11 16.pdf PDF
AE602 - OLI 1 - EXTERIOR WINDOW FRAMES.pdf PDF
08 71 00.pdf PDF
IN102 - FLOOR FINISH PLAN - SECTOR B.pdf PDF
Solicitation Amendment 1 W50S8T25BA0110001 SF 30.pdf PDF
06 41 16.00 10.pdf PDF
AE201 - BUILDING ELEVATIONS.pdf PDF
TABLE OF CONTENTS.pdf PDF
A-002 - PARTITION TYPES.pdf PDF
01 45 35.pdf PDF
FA601 - FIRE ALARM - MASS NOTIFICATION RISER DIAGRAM.pdf PDF
AE151 - REFLECTED CEILING PLAN - SECTOR A.pdf PDF
AE600 - ROOM FINISH SCHEDULE.pdf PDF
10 51 16.pdf PDF
30 Jan 25 Site Visit Sign In Sheet.pdf PDF
BLDG 1040 Renovation Site Visit Slides 30 January 25.pptx PPTX presentation
ATTACHMENT 3 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 2.pdf PDF
Solicitation - W50S8T25BA011.pdf PDF
ATTACHMENT 2 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 1.pdf PDF
Bidders Checklist.docx DOCX document
ATTACHMENT 1 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_DRAWINGS.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM 01

November 2, 2024

CLIENT NAME

PROJECT NAME

Project Number: 2024-000-00

FRANKFURT-SHORT-BRUZA ASSOCIATES, P.C.

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118

ADDENDUM 01

February 17, 2025

OKLAHOMA AIR NATIONAL GUARD 137TH

RENOVATE BUILDING 1040

Project Number: 2020-484-00; YZEU142025

FRANKFURT-SHORT-BRUZA ASSOCIATES, P.C.

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118

NOTICE TO BIDDERS

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated September 12, 2024, Addendum Number 01 dated February 17, 2025. Items not specifically revised remain in effect.

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.

This Addendum consists of (152) page(s) and the attached (14) Specification Sections and (16) Drawings Sheets.

REFERENCE THE SPECIFICATIONS

ITEM 1-1 SPECIFICATION TABLE OF CONTENTS

The attached revised Table of Contents indicated and dated February 17, 2025 shall supersede the Table of Contents dated September 12, 2024.

ITEM 1-2 SPECIFICATION SECTION 01 45 35 – SPECIAL INSPECTIONS

The attached revised Specification Section indicated and dated February 17, 2025 shall supersede the Specification Section dated September 12, 2024.

A. Refer to part 1.2. G sheet numbers revised to match.

ITEM 1-3 SPECIFICATION SECTION 06 20 00 – FINISH CARPENTRY

The attached revised Specification Section indicated and dated February 17, 2025 shall supersede the Specification Section dated September 12, 2024.

A. Refer to part 1.2, SD-03. Countertops removed.

B. Refer to part 2.1.3. Section removed.

C. Refer to parts 2.6.2 through 2.6.6.5. Sections removed.

D. Refer to part 3.2. Section removed.

ITEM 1-4 SPECIFICATION SECTION 06 41 16.00 10 – PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS The attached revised Specification Section indicated and dated February 17, 2025 shall supersede the Specification Section dated September 12, 2024.

A. Refer to part 1.5.1. Changed wording.

B. Refer to part 2.9. Changed wording.

C. Refer to part 2.9.5.2.1. Section removed.

ITEM 1-5 SPECIFICATION SECTION 08 11 16 – ALUMINUM DOORS AND FRAMES

The attached revised Specification Section indicated and dated February 17, 2025 shall supersede the Specification Section dated September 12, 2024.

A. Refer to part 2.3.2.3. Section added.

B. Refer to part 2.3.8.1. Added color.

C. Refer to part 2.3.8.2. Removed section.

ITEM 1-6 SPECIFICATION SECTION 08 41 13 – ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS The attached revised Specification Section indicated and dated February 17, 2025 shall supersede the Specification Section dated September 12, 2024.

A. Refer to part 2.1. Revised information.

ITEM 1-7 SPECIFICATION SECTION 08 71 00 – DOOR HARDWARE

The attached revised Specification Section indicated and dated February 17, 2025 shall supersede the Specification Section dated September 12, 2024.

A. Refer to door hardware schedule for revised tags and clarifications.

ITEM 1-8 SPECIFICATION SECTION 08 81 00 – GLAZING

The attached revised Specification Section indicated and dated February 17, 2025 shall supersede the Specification Section dated September 12, 2024.

A. Refer to part 2.1.1. Information added.

B. Refer to part 2.2. Information added.

ITEM 1-9 SPECIFICATION SECTION 10 21 13 – TOILET COMPARTMENTS

The attached revised Specification Section indicated and dated February 17, 2025 shall supersede the Specification Section dated September 12, 2024.

A. Refer to part 2.4. Information added.

ITEM 1-10 SPECIFICATION SECTION 10 51 13 – LOCKERS

The attached revised Specification Section indicated and dated February 17, 2025 shall supersede the Specification Section dated September 12, 2024.

A. Refer to part 2.2.1. Section removed.

ITEM 1-11 SPECIFICATION SECTION 10 51 16 – CELL PHONE LOCKERS

The attached revised Specification Section indicated and dated February 17, 2025 shall supersede the Specification Section dated September 12, 2024.

A. Refer to part 2.3. Revised information.

ITEM 1-12 SPECIFICATION SECTION 11 94 10 – ROOFTOP FALL PROTECTION ANCHORS

The Specification Section indicated and dated September 12, 2024 is hereby removed from the Project Manual.

ITEM 1-13 SPECIFICATION SECTION 21 13 13

The attached revised Specification Section indicated and dated February 17, 2025 shall supersede the Specification Section dated September 12, 2024.

A. Refer to part 3.4.8. Revised information.

ITEM 1-14 SPECIFICATION SECTION 26 05 73

The Specification Section indicated and dated February 17, 2025 is hereby added to the Project Manual.

REFERENCE THE DRAWINGS

ITEM 1-15 DRAWING SHEET A-002 – PARTITION TYPES

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Wall Series Legend.

B. Refer to Detail B2, Wall Types.

ITEM 1-16 DRAWING SHEET AE102 – FLOOR PLAN – SECTOR A

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Detail A1, Floor Plan – Sector A. Added tags to windows.

B. Refer to Detail A1, Floor Plan – Sector A. Revised cell phone locker in Room 129.

ITEM 1-17 DRAWING SHEET AE103 – FLOOR PLAN – SECTOR B

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Detail A2, Floor Plan – Sector B. Revised cell phone locker in Room 129.

ITEM 1-18 DRAWING SHEET AE151 – REFLECTED CEILING PLAN – SECTOR A

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Detail A1, Reflected Ceiling Plan – Sector A. Revised lighting in Room 111.

ITEM 1-19 DRAWING SHEET AE201 – BUILDING ELEVATIONS

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Detail C1, West Elevation. Revised material information.

ITEM 1-20 DRAWING SHEET AE402 – ENLARGED PLANS

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Detail A1, Enlarged Plan. Revised cell phone locker detail in Room 129.

ITEM 1-21 DRAWING SHEET AE403 – ENLARGED PLANS

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Detail A1, Enlarged Plan – Breakroom 145. Changed detail note from”B1” to “B3”.

ITEM 1-22 DRAWING SHEET AE411 – INTERIOR ELEVATIONS

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Sheet Keynote 12.

ITEM 1-23 DRAWING SHEET AE502 – DETAILS

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Detail B1, Passage Window Detail. Revised information.

ITEM 1-24 DRAWING SHEET AE600 – ROOM FINISH SCHEDULE

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Room Finish Schedule. Multiple revisions across table.

ITEM 1-25 DRAWING SHEET AE601 – DOOR SCHEDULE AND DETAILS

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

B. Refer to Detail A1, Interior Window Types. Notes provided & updated. IN4 dimensions provided.

ITEM 1-26 DRAWING SHEET AE602 – OLI #1 – EXTERIOR WINDOW FRAMES

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Detail B1, OLI #1 – Exterior Window Types. Type “E” removed. Notes provided & updated.

ITEM 1-27 DRAWING SHEET IN101 – FLOOR FINISH PLAN – SECTOR A

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Detail A3, Floor Finish Plan – Sector “A”. Revised hatch in Rooms 173 & 174B.

B. Refer to Finish Legend. RAF hatch pattern updated & carpet revised.

ITEM 1-28 DRAWING SHEET IN102 – FLOOR FINISH PLAN – SECTOR B

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Detail A2, Floor Finish Plan – Sector “B”. Revised hatch in Rooms 172 & 174A.

B. Refer to Finish Legend. RAF hatch pattern updated & carpet revised.

ITEM 1-29 DRAWING SHEET FA601 – FIRE ALARM & MASS NOTIFICATION RISER DIAGRAM

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Detail A1, Fire Alarm / Mass Notification Riser Diagram. Removed ICD 705 reference.

ITEM 1-30 DRAWING SHEET EL101 – ELECTRICAL INTERIOR LIGHTING PLAN – SECTOR A

The attached revised Drawing Sheet indicated and dated February 17, 2025 shall supersede Drawing Sheet dated September 12, 2024.

A. Refer to Detail A1, Electrical Interior Lighting Plan – Sector A. Light types updated in Room 111.

BIDDER QUESTIONS

The attached Bidder Questions Log is provided for reference. Answers are intended to provide clarification and are non-binding. Answers to Bidder Questions requiring revision to the Contract Documents are indicated above.

END OF ADDENDUM

Addendum Narrative.docx Page 1 of 1 FSB | fsb-ae.com FSB | DefineDesignDeliver