Bidders Checklist.docx

DOCX document 35 KB Posted

Attached to
137th SOW - Building 1040 Repair / Renovation Project
Solicitation number
W50S8T25BA011
Issued by

About this file

This is a bidder's checklist from the Department of the Air Force 137th Special Operations Wing that outlines 20 key requirements bidders must verify before submitting their bids for contract opportunities. The checklist covers essential elements including proper acknowledgment of amendments, complete pricing information, bid bond requirements (using Standard Form 24), authorized signatures, representations and certifications, and submission deadlines.

The checklist relates to solicitation W50S8T25BA011 for renovating Building 1040 at Will Rogers Air National Guard Base in Oklahoma City. This is a 100% small business set-aside under NAICS 236220 with a size standard of $45 million and an estimated value between $5-10 million. A pre-bid conference is scheduled for January 27, 2025 at 1000 CST, with bids due February 27, 2025 at 1000 CST. The solicitation emphasizes that no electronic or facsimile bids will be accepted, and funds are anticipated to become available by September 30, 2025.

View the file

Other files

File Type Posted
Abstract (Final).pdf PDF
Amendment 3 Attachment 1 - Bldg 1040 Reno Questions and Answers.docx DOCX document
Solicitation Amendment 3 W50S8T25BA0110003.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 1.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 2.pdf PDF
Amendment 2 Attachment 2 - 09 72 00.pdf PDF
Amendment 2 Attachment 5 - IN600 - INTERIORS MATERIALS LEGEND.pdf PDF
Amendment 2 Attachment 3 - A-002 - PARTITION TYPES.pdf PDF
Amendment 2 Attachment 6 - Bldg 1040 Reno Questions and Answers.xlsx XLSX spreadsheet
Amendment 2 Attachment 1 - Addendum 02 Narrative.docx DOCX document
Solicitation Amendment 2 W50S8T25BA0110002.pdf PDF
Amendment 2 Attachment 4 - 08 11 16.pdf PDF
06 20 00.pdf PDF
21 13 13.pdf PDF
IN101 - FLOOR FINISH PLAN - SECTOR A.pdf PDF
Bldg 1040 Reno Questions and Answers - FSB and GOV Reponses.xlsx XLSX spreadsheet
EL101 - ELECTRICAL INTERIOR LIGHTING PLAN - SECTOR A.pdf PDF
AE102 - FLOOR PLAN - SECTOR A.pdf PDF
AE502 - DETAILS.pdf PDF
AE403 - ENLARGED PLANS.pdf PDF
10 21 13.pdf PDF
10 51 13.pdf PDF
08 41 13.pdf PDF
AE103 - FLOOR PLAN - SECTOR B.pdf PDF
08 81 00.pdf PDF
AE411 - INTERIOR ELEVATIONS.pdf PDF
AE402 - ENLARGED PLANS.pdf PDF
AE601 - DOOR SCHEDULE AND DETAILS.pdf PDF
26 05 73.pdf PDF
08 11 16.pdf PDF
AE602 - OLI 1 - EXTERIOR WINDOW FRAMES.pdf PDF
Addendum 01 Narrative.docx DOCX document
08 71 00.pdf PDF
IN102 - FLOOR FINISH PLAN - SECTOR B.pdf PDF
Solicitation Amendment 1 W50S8T25BA0110001 SF 30.pdf PDF
06 41 16.00 10.pdf PDF
AE201 - BUILDING ELEVATIONS.pdf PDF
TABLE OF CONTENTS.pdf PDF
A-002 - PARTITION TYPES.pdf PDF
01 45 35.pdf PDF
FA601 - FIRE ALARM - MASS NOTIFICATION RISER DIAGRAM.pdf PDF
AE151 - REFLECTED CEILING PLAN - SECTOR A.pdf PDF
AE600 - ROOM FINISH SCHEDULE.pdf PDF
10 51 16.pdf PDF
30 Jan 25 Site Visit Sign In Sheet.pdf PDF
BLDG 1040 Renovation Site Visit Slides 30 January 25.pptx PPTX presentation
ATTACHMENT 3 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 2.pdf PDF
Solicitation - W50S8T25BA011.pdf PDF
ATTACHMENT 2 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 1.pdf PDF
ATTACHMENT 1 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_DRAWINGS.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE HEADQUARTERS 137th SPECIAL OPERATIONS WING 5624 AIR GUARD OKLAHOMA CITY, OKLAHOMA 73179

Federal Contracting Database: Bidder's Checklist

The following list should be used by bidders to avoid irregularities which have occurred in past bids.

1. Have amendments to the invitation been acknowledged on the< bid form in the spaces provided? If not, acknowledgment must be made by separate letter or telegram prior to opening of bids.

2. Have prices been inserted for all bid items of the Bidding Schedule?

3. Do prices inserted include subcontractors' and suppliers' quotations, indirect costs, and profit?

4. Does the total bid amount include the costs of obtaining performance and payment bonds?

5. Have all prices and computations been checked?

6. Is the bid submitted on the latest bid schedule?

7. Have changes been made to the Bidding Schedule if required by amendment?

8. Are decimal points in the bid prices in the proper places?

9. Have you checked for transposition of figures in prices inserted on the Bidding Schedule?

10. Is the bid form signed, and if so, is the bid form signed by a person legally authorized to bind the bidder? Is the bidder's address included?

11. If the bid is signed by an agent, is legal evidence of agent's authority to sign included with the bid?

12. Is the Bid Bond on STANDARD FORM 24 (rev. 1-90) or authorized form as directed in the BID GUARANTEE clause of this solicitation? If not, YOUR BID WILL BE CONSIDERED NONRESPONSIVE.

13. Is the Bid Bond completely and properly executed, dated not later than the bid opening date, signed by Principal and Surety, corporate certificates executed, and seals affixed, all as contained in "Instructions" on STANDARD FORM 24 BACK (REV 1-90)? Power of Attorney is also required to accompany the bonds. Is the penal sum marked in? If an individual surety (or sureties) is (are) guaranteeing the bid bond, have the requirements of the PLEDGES OF ASSETS clause of this solicitation been satisfied and are the supporting documents included with the bond?

14. Has the Plant and Equipment Schedule been completed and included?

15. When applicable, has the form entitled, "Work to be Performed with Contractor's Own Organization" been completed? Does the work or percentage listed meet the requirements of the invitation?

16. Have the appropriate boxes been checked in all paragraphs of the REPRESENTATIONS AND

CERTIFICATIONS?

17. Has the certification contained in the provision REQUIREMENT FOR CERTIFICATE OF PROCUREMENT INTEGRITY been completed and signed? If not, and your bid is in excess of $100,000, your bid will be NONRESPONSIVE.

18. Have all representations and certifications been submitted with the bid?

19. If required by the invitation, is literature, date, catalogs, etc., specified by the invitation included with the bid?

20. Have requirements of the LATE SUBMISSIONS, MODIFICATIONS AND WITHDRAWALS OF BIDS provision of this solicitation been met?

CAUTION: No electronic or facsimile bids will be accepted and shall be considered nonresponsive. Late bids and bids with no bonding will also be considered nonresponsive. Sealed bids will be dated and timed stamped (documented in writing on the envelope) once received. All acceptable bids will be opened same day as IFB closing. Contractors on the active exclusions/barred list in sam.gov will not be accepted.