26 05 73.pdf

PDF 48 KB Posted

Attached to
137th SOW - Building 1040 Repair / Renovation Project
Solicitation number
W50S8T25BA011
Issued by

About this file

This is a technical specification (Section 26 05 73 - Power System Studies) for electrical system analysis required as part of the Building 1040 renovation project at the 137th SOW Oklahoma Air National Guard Base. The specification details requirements for conducting power system studies including load flow analysis, fault current calculations, system coordination studies, and arc flash hazard assessments.

The specification requires development of a software model using SKM PowerTools for analyzing the existing electrical system, which consists of pad-mount transformers, 480/277V and 208/120V distribution systems with existing and new panelboards and step-down transformers. Key requirements include: field examination of existing equipment, multiple power system studies stamped by a registered professional electrical engineer with minimum 3 years experience, arc flash warning labels for electrical equipment, and detailed study reports covering load flow, fault current, system coordination, and arc flash hazards. The System Analyzer must verify equipment settings and provide final model files in native editable formats for future government use. The studies must account for both normal operation and emergency generator operation scenarios.

View the file

Other files

File Type Posted
Abstract (Final).pdf PDF
Amendment 3 Attachment 1 - Bldg 1040 Reno Questions and Answers.docx DOCX document
Solicitation Amendment 3 W50S8T25BA0110003.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 1.pdf PDF
NEW 6 Mar 25 Oklahoma NGB-WRWA - 100 CD Set Part 2.pdf PDF
Amendment 2 Attachment 2 - 09 72 00.pdf PDF
Amendment 2 Attachment 5 - IN600 - INTERIORS MATERIALS LEGEND.pdf PDF
Amendment 2 Attachment 3 - A-002 - PARTITION TYPES.pdf PDF
Amendment 2 Attachment 6 - Bldg 1040 Reno Questions and Answers.xlsx XLSX spreadsheet
Amendment 2 Attachment 1 - Addendum 02 Narrative.docx DOCX document
Solicitation Amendment 2 W50S8T25BA0110002.pdf PDF
Amendment 2 Attachment 4 - 08 11 16.pdf PDF
06 20 00.pdf PDF
21 13 13.pdf PDF
IN101 - FLOOR FINISH PLAN - SECTOR A.pdf PDF
Bldg 1040 Reno Questions and Answers - FSB and GOV Reponses.xlsx XLSX spreadsheet
EL101 - ELECTRICAL INTERIOR LIGHTING PLAN - SECTOR A.pdf PDF
AE102 - FLOOR PLAN - SECTOR A.pdf PDF
AE502 - DETAILS.pdf PDF
AE403 - ENLARGED PLANS.pdf PDF
10 21 13.pdf PDF
10 51 13.pdf PDF
08 41 13.pdf PDF
AE103 - FLOOR PLAN - SECTOR B.pdf PDF
08 81 00.pdf PDF
AE411 - INTERIOR ELEVATIONS.pdf PDF
AE402 - ENLARGED PLANS.pdf PDF
AE601 - DOOR SCHEDULE AND DETAILS.pdf PDF
08 11 16.pdf PDF
AE602 - OLI 1 - EXTERIOR WINDOW FRAMES.pdf PDF
Addendum 01 Narrative.docx DOCX document
08 71 00.pdf PDF
IN102 - FLOOR FINISH PLAN - SECTOR B.pdf PDF
Solicitation Amendment 1 W50S8T25BA0110001 SF 30.pdf PDF
06 41 16.00 10.pdf PDF
AE201 - BUILDING ELEVATIONS.pdf PDF
TABLE OF CONTENTS.pdf PDF
A-002 - PARTITION TYPES.pdf PDF
01 45 35.pdf PDF
FA601 - FIRE ALARM - MASS NOTIFICATION RISER DIAGRAM.pdf PDF
AE151 - REFLECTED CEILING PLAN - SECTOR A.pdf PDF
AE600 - ROOM FINISH SCHEDULE.pdf PDF
10 51 16.pdf PDF
30 Jan 25 Site Visit Sign In Sheet.pdf PDF
BLDG 1040 Renovation Site Visit Slides 30 January 25.pptx PPTX presentation
ATTACHMENT 3 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 2.pdf PDF
Solicitation - W50S8T25BA011.pdf PDF
ATTACHMENT 2 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_SPECIFICATIONS VOL. 1.pdf PDF
Bidders Checklist.docx DOCX document
ATTACHMENT 1 - 2024.09.12_OK-ANG_SQUADOPS B1040_TYPE B3_DRAWINGS.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

137TH SOW OKLAHOMA ANG B- 3 100% REPAI R BUI LDI NG 1040

OKLAHOMA CI TY, OK 12 SEPTEMBER, 2024

SECTI ON 26 05 73

POWER SYSTEM STUDI ES

08/ 23

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

I NSTI TUTE OF ELECTRI CAL AND ELECTRONI CS ENGI NEERS ( I EEE)

I EEE 1584 ( 2018; E 2019) Gui de f or Per f or mi ng Ar c- Fl ash Hazar d Cal cul at i ons

I EEE 1584. 1 ( 2022) Gui de f or t he Speci f i cat i on of Scope and Del i ver abl e Requi r ement s f or an Ar c- Fl ash Hazar d Cal cul at i on St udy

I EEE 3002. 2 ( 2018) Recommended Pr act i ce f or Conduct i ng Load- Fl ow St udi es and Anal ysi s of I ndust r i al and Commer ci al Power Syst ems

I EEE 3002. 3 ( 2018) Recommended Pr act i ce f or Conduct i ng Shor t - Ci r cui t St udi es and Anal ysi s of I ndust r i al and Commer ci al Power Syst ems

I EEE C2 ( 2023) Nat i onal El ect r i cal Saf et y Code

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 70E ( 2024) St andar d f or El ect r i cal Saf et y i n t he Wor kpl ace

U. S. DEPARTMENT OF DEFENSE ( DOD)

UFC 3- 560- 01 ( 2017; wi t h Change 3, 2023) Oper at i on and Mai nt enance: El ect r i cal Saf et y

1. 2 SYSTEM DESCRI PTI ON

The power syst em cover ed by t hi s speci f i cat i on consi st s of : Exi st i ng pad- mount t r ansf or mer , 480/ 277V di st r i but i on syst em wi t h exi st i ng and new panel boar ds and st ep down t r ansf or mer s. 208/ 120V di st r i but i on syst ems wi t h exi st i ng and new panel boar ds. .

1. 3 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" c l assi f i cat i on.

Submi t t al s not havi ng a " G" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SECTI ON 26 05 73 Page 1

Gallagher, Brad K.

Text Box

ADDENDUM #1 - 02/17/2025

Gallagher, Brad K.

Cloud

SD- 01 Pr econst r uct i on Submi t t al s

Fi el d Exami nat i on Pl an; G, Ar c Fl ash Label For mat s; G, SD- 06 Test Repor t s

Fi el d Exami nat i on

SD- 07 Cer t i f i cat es

Syst em Anal yzer ; G, SD- 11 Cl oseout Submi t t al s

Model Fi l es; G, Load Fl ow St udy; G, Faul t Cur r ent St udy; G, Syst em Coor di nat i on St udy; G, Ar c Fl ash Hazar d St udy; G,

1. 4 QUALI TY ASSURANCE

1. 4. 1 Syst em Anal yzer

The Syst em Anal yzer must per f or m t he power syst em st udi es. The Syst em Anal yzer must be a r egi st er ed pr of essi onal el ect r i cal engi neer wi t h a mi ni mum of 3 year s of exper i ence wi t h power syst em st udi es. I ncl ude a l i s t of t hr ee compar abl e j obs per f or med by t he Syst em Anal yzer wi t h speci f i c names and t el ephone number s f or r ef er ence. I ncl ude t he l i cense number and st at e of t he r egi st er ed Pr of essi onal Engi neer .

1. 4. 2 Syst em Ver i f i er

The Syst em Ver i f i er may i nspect and r ecor d set t i ngs, mar ki ngs, and ot her wi se document t he exi st i ng equi pment . The Syst em Ver i f i er may al so pl ace appr opr i at e hazar d l abel s on equi pment . The Syst em Ver i f i er must not make any cal i br at i ons or adj ust ment s or pl ace equi pment i nt o ser vi ce.

When wor ki ng wi t h ener gi zed equi pment , t he syst em ver i f i er must be a Qual i f i ed Per son per NFPA 70E or wor ki ng under t he di r ect super vi s i on of a Qual i f i ed Per son. The Syst em Ver i f i er may communi cat e wi t h t he syst em owner t o det er mi ne i f t he equi pment wi t hi n t he st udi ed syst em has r ecei ved mai nt enance and t est i ng i n accor dance wi t h NETA MTS or NFPA 70B.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

3. 1 FI ELD EXAMI NATI ON

For each pr e- and post - st udy i nspect i on, submi t a f i el d exami nat i on pl an i dent i f y i ng whi ch f aci l i t i es must be exami ned t o compl et e t he r equi r ed

SECTI ON 26 05 73 Page 2 wor k. I ncl ude a compl et e i nf or mat i on ver i f i cat i on pr ocedur e, wher e Qual i f i ed Per sonnel wi l l be r equi r ed, PPE r equi r ement s f or " l i ve" equi pment exami nat i ons, and equi pment t o be used wi t hi n t he l i mi t ed appr oach boundar y of t he equi pment .

3. 1. 1 Gener al

Per f or m f i el d i nspect i ons of t he s i t e and equi pment bef or e t he f i r st st udy and af t er t he l ast st udy t o det er mi ne t he st at e and set t i ngs of t he equi pment and t o ver i f y t he f i nal set t i ngs agr ee wi t h t he st udi es.

Per f or m t he post - st udy i nspect i on( s) af t er changi ng set t i ngs, af t er per f or mi ng accept ance t est s, and bef or e pl aci ng equi pment i n ser vi ce.

Schedul e t he f i el d exami nat i on by t he Syst em Ver i f i er wi t h t he Cont r act i ng Of f i cer at l east 10 busi ness days bef or e conduct i ng exami nat i on. Fur ni sh al l mat er i al s, l abor , and equi pment necessar y t o conduct t he exami nat i on.

Mai nt ai n a wr i t t en r ecor d of t he al l equi pment exami ned, equi pment l ocat i on, equi pment r at i ngs, set t i ngs, per sonnel i nvol ved, and t he dat e t he exami nat i on was per f or med. Submi t t he wr i t t en r ecor d of each f i el d exami nat i on.

3. 1. 2 Saf et y

Wher e exami nat i on of t he equi pment r equi r es ener gi zed equi pment t o be opened, pr ovi de a Qual i f i ed Per son t o di r ect l y super vi s i ng any non- Qual i f i ed Per son wi t hi n t he hazar d ar ea. Use PPE, pr ot ect i ve bar r i er s, danger s i gns and ot her saf et y devi ces t o pr ot ect and war n per sonnel i n t he v i c i ni t y of " l i ve" equi pment bei ng exami ned.

3. 1. 3 Appl i cat i on of Ar c Fl ash Label s

I nst al l ar c f l ash war ni ng l abel s usi ng Qual i f i ed Per sonnel as necessar y af t er t he set t i ng and i nspect i on i s compl et e. For new or modi f i ed equi pment , i nst al l l abel s bef or e t he equi pment i s ener gi zed f or t he f i r st t i me af t er i nst al l at i on/ modi f i cat i on or set t i ng changes. Schedul e t he l abel pl acement wi t h t he Cont r act i ng Of f i cer at l east 5 busi ness days bef or e l abel pl acement . Fur ni sh al l mat er i al s, l abor , and equi pment necessar y t o pl ace t he l abel s. Mai nt ai n a wr i t t en r ecor d of t he al l equi pment t hat r ecei ved l abel s, per sonnel i nvol ved, and t he dat e l abel s wer e pl aced.

3. 2 POWER SYSTEM STUDI ES

Per f or m power syst em st udi es t o demonst r at e t hat t he equi pment sel ect ed and syst em const r uct ed meet t he cont r act r equi r ement s f or f aul t cur r ent and i nt er r upt r at i ngs, coor di nat i on, pr ot ect i on, and Ar c Fl ash Hazar d.

Submi t r epor t s of t he st udi es al ong wi t h pr ot ect i ve devi ce equi pment submi t t al s. Appl y Ar c Fl ash Hazar d l abel s t o equi pment af t er t he st udi es ar e appr oved. Updat e and r esubmi t t he st udi es af t er any changes t o t he equi pment or syst ems whi ch may af f ect t he st udy r esul t s, and r e- appl y Ar c Fl ash Hazar d l abel s t o equi pment af t er t he r esubmi t t ed st udi es ar e appr oved. The Gover nment i s not r esponsi bl e f or any changes t o equi pment , devi ce r at i ngs, set t i ngs, or addi t i onal l abor f or i nst al l at i on of equi pment or devi ces or l abel s or der ed and/ or pr ocur ed bef or e appr oval of t he st udy.

SECTI ON 26 05 73 Page 3

3. 2. 1 Scope of St udi es

The scope of t he st udi es must begi n at t he near est upst r eam devi ce i n t he exi st i ng sour ce syst em and ext end t hr ough t he downst r eam devi ces at t he l oad end.

The " sour ce bus" i s t he sour ce of ener gy f or syst em bei ng anal yzed. Thi s may be t he ener gy f eed f r om a ut i l i t y , t he f i r st bus upst r eam of t he wor k, gener at or s wi t hi n t he wor k or upst r eam of t he wor k, or any ot her sour ce capabl e of cont r i but i ng s i gni f i cant ener gy i nt o t he syst em bei ng anal yzed.

I n t he syst ems model f or t he st udi es, i ncor por at e al l exi st i ng and new equi pment wi t hi n t he scope of t he st udi es. I ncor por at e any addi t i onal sour ces or l oad equi pment necessar y t o accur at el y model t he syst em' s per f or mance.

Wher e mul t i pl e sour ces of power may be i n ser vi ce i n var i ous combi nat i ons or wher e el ect r i cal l oops ar e i n t he syst em, i ncor por at e i nt o t he st udi es al l t he modes of oper at i on t o eval uat e t he i mpact of t he modes of oper at i on on t he syst em. The pr i mar y modes of oper at i on ar e l i s t ed bel ow.

1. Nor mal oper at i on

2. Emer gency Gener at or Oper at i on

3. 2. 2 Det er mi nat i on of Fact s

Det er mi ne and document t he t i me- cur r ent char act er i st i cs, f eat ur es, r at i ngs, ampaci t i es, and namepl at e dat a f or each exi st i ng pr ot ect i ve devi ce, el ect r i cal equi pment , and f eeder cabl es. Obt ai n t he avai l abl e f aul t cur r ent f r om t he owner of t he sour ce bus. For mul t i pl e modes of oper at i on, use t he mode wi t h avai l abl e f aul t cur r ent t hat pr oduces t he gr eat est i nci dent ener gi es i n t he ar c f l ash hazar d st udy.

Ut i l i ze f i el d- ver i f i ed dat a i n t he power syst em st udi es. Document t he f i el d- ver i f i ed dat a i n t he r epor t .

3. 2. 3 Si ngl e Li ne Di agr am

Pr ovi de a s i ngl e l i ne di agr am showi ng t he el ect r i cal syst em buses, devi ces, t r ansf or mat i on poi nt s, and al l sour ces of l oad cur r ent and f aul t cur r ent , i ncl udi ng gener at or and mot or cont r i but i ons. Pr ovi de a di agr am f r om t he syst em model . Each bus, devi ce or t r ansf or mat i on poi nt must have a uni que i dent i f i er . Show t he l ocat i on of swi t ches, br eaker s, and ci r cui t i nt er r upt i ng devi ces on t he di agr am t oget her wi t h avai l abl e f aul t dat a, and t he devi ce i nt er r upt i ng r at i ng.

The nami ng of exi st i ng component s wi t hi n t he syst em model and si ngl e l i ne di agr am must mat ch exi st i ng i nst al l ed equi pment names. The nami ng of new component s wi t hi n t he syst em model and si ngl e l i ne di agr am must use uni que i dent i f i er s and be coor di nat ed wi t h t he Gover nment .

3. 2. 4 Load Fl ow St udy

Per f or m t he l oad f l ow st udy i n accor dance wi t h I EEE 3002. 2 t o i dent i f y i ni t i t al st eady- st at e condi t i ons f or t he f aul t cur r ent st udy. For each

SECTI ON 26 05 73 Page 4 oper at i ng scenar i o, pr ovi de l oad f l ow r esul t s on t he di agr am or i n t he r epor t . Show or descr i be t he l oadi ng f act or s and assumpt i ons used i n each oper at i ng mode.

3. 2. 5 Faul t Cur r ent St udy

Use t he r esul t s of t he l oad f l ow st udy t o per f or m t he f aul t cur r ent st udy i n accor dance wi t h I EEE 3002. 3. Pr ovi de bal anced t hr ee- phase f aul t , bol t ed l i ne- t o- l i ne f aul t , and si ngl e l i ne- t o- gr ound f aul t cur r ent val ues at each vol t age t r ansf or mat i on poi nt and at each power di st r i but i on bus.

For each l ocat i on, show i n t abul ar f or m on t he di agr am or i n t he r epor t t he maxi mum and mi ni mum avai l abl e f aul t cur r ent s of al l modes of oper at i on f or t hat l ocat i on.

Wher e t he avai l abl e f aul t cur r ent at t he sour ce bus i s not avai l abl e, descr i be how t he f aul t cont r i but i on f r om t he sour ce bus was det er mi ned and why t hi s met hod i s r easonabl e f or t he st udy.

3. 2. 6 Syst em Coor di nat i on St udy

Use t he r esul t s of t he l oad f l ow st udy and f aul t cur r ent st udy. For nor mal modes of oper at i on, demonst r at e t hat sel ect i v i t y has been obt ai ned bet ween t he devi ces wi t hi n t he scope of t he pr oj ect . Demonst r at e t he equi pment , machi nes, and conduct or s ar e pr ot ect ed f r om damage f r om over l oads and f aul t condi t i ons. I ncl ude a descr i pt i on of t he coor di nat i on of t he pr ot ect i ve devi ces i n t hi s pr oj ect . Pr ovi de a wr i t t en nar r at i ve descr i bi ng whi ch devi ces may oper at e i n t he event of a f aul t at each bus;

t he l ogi c used t o ar r i ve at devi ce r at i ngs and set t i ngs; s i t uat i ons wher e syst em coor di nat i on i s not achi evabl e due t o devi ce l i mi t at i ons;

coor di nat i on bet ween upst r eam and downst r eam devi ces; and r el ay set t i ngs.

Pr ovi de r ecommendat i ons t o i mpr ove or enhance syst em r el i abi l i t y , and det ai l wher e such changes woul d i nvol ve addi t i ons or modi f i cat i ons t o t he cont r act and cost damages ( addi t i on or r educt i on) . Pr ovi de composi t e coor di nat i on pl ot s on a l og- l og scal e. Wher e r ecommendat i ons ar e pr ovi ded t o i mpr ove or enhance syst em r el i abi l i t y , pr ovi de separ at e coor di nat i on pl ot s on l og- l og scal e showi ng t he syst em coor di nat i on bef or e and af t er t he i mpl ement at i on of t he r ecommendat i ons. Wher e coor di nat i on has been adj ust ed t o l ower ar c f l ash val ues, i ncl ude a di scussi on of t he change and t he i mpact on t he syst em wi t hi n t he r epor t .

3. 2. 7 Ar c Fl ash Hazar d St udy

Per f or m t he ar c f l ash hazar d st udy i n accor dance wi t h I EEE 1584. 1.

Ut i l i ze t he dat a f r om t he f aul t cur r ent st udy t o det er mi ne t he wor st case i nci dent ener gy per I EEE 1584, I EEE C2, and OSHA 29 CFR 1910. 269 Appendi x E. Use i dent i f i ed modes of oper at i on t o det er mi ne t he wor st case ar c f l ash ener gy. I f not i ncl uded i n anot her st udy, i ncl ude a descr i pt i on of t he devi ces and devi ce set t i ngs f or t he oper at i ng modes t hat pr ovi ded t he hi ghest ar c f l ash ener gy. Wher e t he adj ust i ng t he coor di nat i on of devi ces t o obt ai n l ower ar c f l ash val ues, i ncl ude a di scussi on of t he change and t he i mpact on t he syst em wi t hi n t he r epor t . .

Wher e t he AC syst em vol t age i s 208 vol t s or l ess wi t h an avai l abl e shor t - c i r cui t cur r ent l ess t han 2000 A, an ar c f l ash hazar d st udy i s not r equi r ed.

SECTI ON 26 05 73 Page 5

3. 2. 8 St udy r epor t ( s)

a. I ncl ude a nar r at i ve descr i bi ng t he st udi es per f or med; t he bases and met hods used; and t he desi r ed met hod of coor di nat ed pr ot ect i on of t he power syst em.

b. I ncl ude descr i pt i ve and t echni cal dat a f or exi st i ng devi ces and new pr ot ect i ve devi ces pr oposed. I ncl ude manuf act ur er s publ i shed dat a, namepl at e dat a, and def i ni t i on of t he f i xed or adj ust abl e f eat ur es of t he exi st i ng or new pr ot ect i ve devi ces. For exi st i ng devi ces, i ncl uded st at ement s on t he condi t i on of t he equi pment based upon f i el d i nspect i ons and owner ' s st at ement s and r epor t s.

c. Document ut i l i t y company dat a i ncl udi ng syst em vol t ages, f aul t MVA, syst em X/ R r at i o, t i me- cur r ent char act er i st i c cur ves, cur r ent t r ansf or mer r at i os, and r el ay devi ce number s and set t i ngs; gener at or r esi st ance and r eact ance val ues, and t i me const ant s; and exi st i ng power syst em dat a i ncl udi ng t i me- cur r ent char act er i st i c cur ves and pr ot ect i ve devi ce r at i ngs and set t i ngs. I dent i f y al l assumpt i ons about t he pr ot ect i on devi ces, equi pment , and syst em wher e dat a was not avai l abl e.

d. For each bus i n t he syst em, pr ovi de f ul l y coor di nat ed composi t e t i me- cur r ent char act er i st i cs ( TCC) cur ves as r equi r ed t o ensur e coor di nat ed power syst em pr ot ect i on bet ween pr ot ect i ve devi ces and equi pment . I n a t abul ar f or mat , pr ovi de exi st i ng and r ecommended r at i ngs and set t i ngs of al l pr ot ect i ve devi ces.

e. Pr ovi de an ar c f l ash st udy r epor t i n accor dance wi t h I EEE 1584. 1.

f . Pr ovi de t he cal cul at i ons per f or med f or t he st udi es, i ncl udi ng comput er pr ogr ams ut i l i zed. Pr ovi de t he name of t he sof t war e package, devel oper , and ver si on number .

f . The Syst em Anal yzer must st amp t he st udy r epor t s.

3. 2. 9 Ar c Fl ash Label s

Pr ovi de ar c f l ash war ni ng l abel s on el ect r i cal equi pment l i kel y t o r equi r e exami nat i on, ser vi c i ng, or mai nt enance whi l e ener gi zed. Typi cal t ypes of equi pment i ncl ude pad- mount ed t r ansf or mer s, swi t chgear , swi t chboar ds, panel boar ds, di sconnect swi t ches, i ndust r i al cont r ol panel s, met er socket encl osur es, and mot or cont r ol cent er s t hat ar e i n ot her t han dwel l i ng occupanci es. The ar c f l ash l abel nami ng must mat ch t he nami ng used i n t he syst em model i ng and t he si ngl e l i ne di agr am.

Compl y wi t h t he l abel r equi r ement s speci f i ed i n UFC 3- 560- 01NFPA 70E.

Obt ai n appr oval of ar c f l ash l abel f or mat s bef or e pr i nt i ng.

a. Pr ovi de a 3. 5 i nch x 5 i nch t o 4 i nch x 6 i nch t her mal t r ansf er t ype l abel of hi gh adhesi on pol yest er f or each l ocat i on devi ce anal yzed.

The l abel must r emai n i n pl ace and be l egi bl e f or at l east 5 year s i n t he i nst al l ed envi r onment .

b. Label s must be machi ne pr i nt ed wi t h no f i el d mar ki ngs. Pr ovi de ar c f l ash l abel s i n t he f ol l owi ng manner . Al l l abel s must be based on i mpl ement ed over cur r ent devi ces and set t i ngs.

1. Pr ovi de at l east one ar c f l ash l abel f or each 480 vol t and 208 vol t

SECTI ON 26 05 73 Page 6 panel boar ds.

2. Pr ovi de at l east one ar c f l ash l abel f or each l ow vol t age ( l ess t han 1000 V) swi t chboar d.

3. Wher e t he equi pment const r uct i on has di f f er ent hazar ds l evel s i n di f f er ent ar eas, pr ovi de a s i ngl e l abel r epr esent i ng t he wor st case hazar d f or al l br anch ci r cui t s and a separ at e uni que l abel f or t he compar t ment cont ai ni ng t he mai n pr ot ect i ve devi ce. On t he wor st case l abel , i ndi cat e whi ch br anch ci r cui t compar t ment s have t he wor st case hazar d.

c. Use t he wor st case hazar d of al l oper at i ng scenar i os unl ess mi t i gat i on pr ocedur es ar e used. I f mi t i gat i on pr ocedur es ar e used, expl ai n t he pr ocedur es on t he l abel .

3. 3 MODELI NG

Devel op a sof t war e model of t he el ect r i cal syst em i dent i f i ed i n t he scope of t he st udi es. Use t he l at est ver si on of SKM Power Tool s( TM) . Devel op t he model wi t h accur at e, ver i f i ed i nf or mat i on. Model exi st i ng el ect r i cal equi pment , machi nes, devi ces, and conduct or s di r ect l y connect ed t o, al t er ed by, or ot her wi se af f ect ed by t he wor k. Thi s i ncl udes, but i s not l i mi t ed t o gener at or s, t r ansf or mer s, swi t chgear , swi t chboar ds, panel boar ds, mot or cont r ol cent er s, mot or s, vol t age r egul at or s, t ap changer s, pr ot ect i ve r el ays, c i r cui t br eaker s, swi t ches, f uses, conduct or s, capaci t or s, r eact or s, gr oundi ng syst em, and cont r ol equi pment .

Pr ovi de t he f i nal model f i l es i n t hei r nat i ve edi t abl e f or mat s f or f ut ur e use by t he Gover nment . I ncl ude devi ce i nf or mat i on f or devi ces not i n t he sof t war e vendor ' s st andar d di st r i but i on.

- - End of Sect i on - -

SECTI ON 26 05 73 Page 7

26 05 73 - POWER SYSTEM STUDIES
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 System Analyzer
1.4.2 System Verifier
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 FIELD EXAMINATION
3.1.1 General
3.1.2 Safety
3.1.3 Application of Arc Flash Labels
3.2 POWER SYSTEM STUDIES
3.2.1 Scope of Studies
3.2.2 Determination of Facts
3.2.3 Single Line Diagram
3.2.4 Load Flow Study
3.2.5 Fault Current Study
3.2.6 System Coordination Study
3.2.7 Arc Flash Hazard Study
3.2.8 Study reports
3.2.9 Arc Flash Labels

3.3 MODELING

File details come from the government source that posted it. Updated .