About this file

This is a Substitution Request Form used by the Port of Portland for construction and procurement projects. The form serves as the official mechanism for contractors and suppliers to request approval to substitute specified materials, products, or equipment with alternative options during project execution. The form requires detailed documentation of the proposed substitution, including trade name, model number, manufacturer information, and comprehensive supporting data such as product descriptions, specifications, drawings, photographs, and performance test data. Submitters must certify that the proposed substitution is equal or superior to the specified product, maintains equivalent warranty and maintenance service, does not affect other trades or project schedule, and does not impact dimensional or functional clearances. The Port of Portland reserves the right to approve the substitution with or without conditions, reject the request requiring use of specified materials, or deny the request if submitted too late in the project timeline.

The form establishes a formal review and approval process managed by Port of Portland personnel, who must evaluate all supporting documentation and determine whether the substitution meets project requirements. Upon approval, contractors must comply with the General Conditions and Specification Section 013300 for proper submittal procedures. The Port also explicitly requires that submitters bear all costs associated with design changes, architectural or engineering modifications, detailing, and any additional construction costs resulting from the approved substitution. This framework ensures that material substitutions do not compromise project quality, schedule, or cost while maintaining the Port's control over construction specifications and standards.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-513 (06) A0.01.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBSTITUTION

REQUEST

Project: From:

To: Port of Portland Date:

Specification

Title:

Specification

Section No.:

Section

Page:

Article/

Paragraph:

Proposed Substitution:

Trade Name: Model No.:

Manufacturer: Address: Phone:

Attached data includes product description, specifications, drawings, photographs, and performance and test data adequate for evaluation of the request; applicable portions of the data are clearly identified.

Attached data also includes a description of changes to the Contract Documents that the proposed substitution will require for its proper installation.

The Undersigned certifies:

• Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.

Same warranty will be furnished for proposed substitution as for specified product.

• Same maintenance service and source of replacement parts, as applicable, is available.

• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule. Proposed substitution does not affect dimensions and functional clearances.

• Undersigned will pay for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.

Submitted By:

Signature:

Address:

Telephone:

PORT REVIEW AND ACTION

☐ Substitution approved – Make submittals in accordance with the General Conditions and Specification Section 013300.

☐ Substitution approved as noted – Make submittals in accordance with the General Conditions and Specification

Section 013300.

☐ Substitution rejected – Use specified materials.

☐ Substitution request received too late – Use specified materials.

Signed by: Date:

Supporting Data Attached: ☐ Drawings ☐ Product Data ☐ Samples ☐ Tests ☐ Reports ☐

CSI Form 1.5C Version January 2013

Port-revised March 2019

Project:
From:
Date:
Specification Title:
Section No:
Section Page:
Article Paragraph:
Proposed Substitution:
Trade Name:
Model No:
Manufacturer:
Phone:
Submitted By:
Address2:
Telephone:
Substitution approved – Make submittals in accordance with the General Conditions and Specification Section 013300: Off
Substitution approved as noted – Make submittals in accordance with the General Conditions and Specification: Off
Substitution rejected – Use specified materials: Off
Substitution request received too late – Use specified materials: Off
Drawings: Off
Product Data: Off
Samples: Off
Tests: Off
Reports: Off
Other: Off
Other Description:
Action Date:
Address:
Address1: