PDX 2026-513 (58) E2.12.pdf

PDF 499 KB Posted

Attached to
Portland International Airport Customs and Border Protection Improvements - Phase 2
Solicitation number
145968
Issued by
Multnomah County, Oregon

About this file

This is an electrical reflected ceiling plan drawing for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon. The drawing, designated as sheet E2.12, depicts the deplaning level in sector 02 and provides detailed specifications for electrical lighting modifications and installations. The project involves relocating existing light fixtures to new positions, connecting new light fixture conduits to existing junction boxes, and installing occupancy sensors with power packs to control lighting circuits in various functional areas including offices, labs, search areas, restrooms, vestibules, and baggage claim zones. The contractor is required to trace existing lighting branch circuits from as-built drawings for verification and provide red line markups on contractor as-built drawings. Key specifications include connecting relocated fixtures to their original lighting branch circuits, extending circuits and raceways as necessary, and ensuring that room control systems remain stand-alone without integration into the facility's broader lighting control system.

The drawing was prepared by M. Henning and drawn by E. Close under the supervision of B. Perry, with technical review by Jay Ostlund, a registered professional engineer in Oregon. The document is dated September 2026 and carries a design number of 2025D042 with project number 103146. The scale is 1/8 inch equals 1 foot for reference purposes, with graphic scales provided for both viewing and printing. The reflected ceiling plan uses standard architectural notation and includes continuation references to adjacent sheets E2.11 and E2.13 for comprehensive site coverage. The drawing was created in digital format using AutoCAD software and includes a digital signature certification valid through December 31, 2026.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-513 (06) A0.01.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D1706

OFFICE

D1708

LAB

D1709

SEARCH

D1710

KEN

D1636

ESC

D1638

STAIRS

D1614

MENS

D1616

WOMENS

D1613

SEARCH

D1615

SEARCHD1612

VESTIBULE

D1624

COMM

D1622

ELEC

D1601

CASHIER

D1707

CORR

D1603

BAGGAGE CLAIM

D1642

LAN

D1604

OFFICE

D1602

OFFICE

D1611

LOCKERS

D1610

OFFICE

D1608

SUPERVISOR

D1603

CUSTOMS

D1606

OFFICE

D14177

OFFICE

J

J

L3A

L3A

L3A

L3A

4D1A:9

4D1A:9

E4D1A:3

E4D1A:3 M

LV

E4D1A:3

D45 D44 D43 D42 D41 D40 D39

DE

DD

DC

DB

DA

SCALE:

DEPLANING LEVEL - SECTOR 02 - REFLECTED CEILING PLAN - ELECTRICAL

1/8" = 1'-0"1

9/8/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:39:22 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\e2.12 deplaning level - sector 02 - lighting plan - electrical.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

KEY PLAN

SCALE: N.T.S.

N

THE AREA BELOW IS TO BE LEFT BLANK - FOR

USE BY CITY FOR PERMIT REVIEW STAMP ONLY-

Salem 503-584-1576 www.landisconsulting.com

PORTLAND INTERNATIONAL AIRPORT

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2

PDX 2026-5132025D042 103146

M. HENNING

E. CLOSE

B. PERRY

SEPTEMBER 2026

JAY OSTLUND

CD

PDERETSI

GER LA

NOI

SSEFOR

OREGON

86683

NIG

N

E R

EE

8 , 2

M A Y

PERRY

B

EN

JAMI N

E.

EXPIRES: 12-31-2026

Digitally Signed

DEPLANING LEVEL - SECTOR 02 - REFLECTED

CEILING PLAN - ELECTRICAL

E2.12

N

SCALE: IN FEET

0' 4' 8' 16' 24'

(RD)

#KEY NOTE(S) :

1. RELOCATED EXISTING LIGHT TO NEW LOCATION

SHOWN. CONNECT TO EXISTING LIGHTING BRANCH

CIRCUIT THAT IT WAS CONNECTED TO PRIOR TO

RELOCATION. EXTEND CIRCUIT AND RACEWAY TO

NEW LOCATION AS REQUIRED.

2. CONNECT NEW LIGHT FIXTURE CONDUIT TO

EXISTING JUNCTION BOX AS SHOWN. CONNECT

NEW LIGHTS TO SAME LIGHTING BRANCH CIRCUIT

AS SHOWN.

3. PROVIDE OCCUPANCY SENSOR AND POWER PACK

TO CONTROL LIGHTING CIRCUIT AS SHOWN. ROOM

CONTROLS SHALL BE STAND-ALONE AND WILL NOT

BE INTEGRATED INTO THE LIGHTING CONTROL

SYSTEM.

(RD)

(RD)

(E)

4D1A-13

4D1A-13

4D1A-13

C O

N

TI

N U

ED

O

N S

H

EE

T E2

.1

C O

N

TI

N U

ED

O

N S

H

EE

T E2

.1

C O

N

TIN

U

ED

O N

SH

EET E2.11

C O

N

TIN

U

ED

O N

SH

EET E2.11

GENERAL NOTE:

1. EXISTING LIGHTING BRANCH CIRCUITS ARE FROM

AS-BUILT DRAWINGS. CONTRACTOR TO TRACE

LIGHTING BRANCH CIRCUITS FOR VERIFICATION

AND PROVIDE RED LINE MARKUPS FOR THESE

CIRCUITS ON THE CONTRACTOR AS-BUILT

DRAWINGS.

2026-09-08T14:31:28-0700
Digitally Signed
Benjamin Earl Perry

File details come from the government source that posted it. Updated .