PDX 2026-513 (28) A9.02.pdf
PDF 349 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is a Finish Schedule document for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon. The schedule specifies interior finishing materials and work requirements across 28 rooms and areas within the airport facility. The document details floor finishes (including Luxury Vinyl Tile, Carpet, and Resilient Anti-Fatigue Flooring), base treatments (Rubber Base and Stainless Steel), wall treatments (Paint and High Performance Finish), ceiling applications (Acoustic Ceiling Tile and Linear Metal Ceiling), and door and frame specifications for each designated space. Room types include offices, corridors, holding areas, baggage claim, immigration processing, health isolation, storage, and secondary check areas. The schedule indicates which elements are new installations versus existing materials to remain, with notations specifying repair, patching, and modification requirements where new work interfaces with existing conditions.
The document provides detailed abbreviations and technical specifications for all finish materials and conditions the contractor must implement. Special notes address requirements such as wall patching prior to new finish work, ceiling modifications to accommodate new construction, and paint extension to nearest control joints. The schedule was prepared as of September 2026 and is designated as Additive Alternate #2 of the construction documents, indicating this represents optional or supplemental scope elements. Design and drawing production credits are attributed to the project team, with the document referenced as Sheet A9.02 of the overall project drawing set.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE:
FINISH SCHEDULE
N.T.S.1
FINISH SCHEDULE
ROOM ROOM NAME SHEET FLOOR BASE
WALLS
CEILING DOORS &
FRAMES CABINETS COUNTERS NOTES
NORTH EAST SOUTH WEST
D14177 OFFICE A2.02 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 ACT-01 PT-02 N/A N/A
D14573 OFFICE A2.01 (E) (E) PT-01 (E) (E) (E) (E), ACT-02 PT-02 (E) (E) 7
D1600 IMMIGRATION A2.01 CPT-03/RF-01 (E) (E) (E) (E) (E) PT-03 (E) (E) (E) 5
D1602 OFFICE A2.02 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1603 BAGGAGE CLAIM A2.02 (E) (E) HPC-01/SS-1 (E) (E) (E) PT-03 HPC-02 N/A N/A 2, 5
D1604 OFFICE A2.02 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1605 OFFICE A2.01 (E) (E) (E) (E) PT-01 (E) (E), ACT-02 PT-02 (E) (E) 7
D1606 OFFICE A2.02 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1608 SUPERVISOR A2.02 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1610 OFFICE A2.02 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1611 LOCKERS A2.02 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1618 FORMER STORAGE A2.03 CPT-01 SS-1 PT-03 / SS-1 N/A PT-03 N/A LM-01 N/A N/A N/A 3
D1633 RECHECK A2.03 CPT-01 (E) (E) (E) (E) (E) LM-01 N/A N/A N/A 4
D1662 CORRIDOR A2.01 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1663 OFFICE A2.01 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1683 OFFICE A2.01 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1671 CORRIDOR A2.01 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1674 HEALTH A2.01 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1675 ISOLATION A2.01 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1678 OFFICE A2.01 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1679 STORAGE A2.01 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1680 OFFICE A2.01 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1682 CORRIDOR A2.01 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1686 HOLD A2.01 (E) (E) (E) (E) (E) PT-01 (E) (E) N/A N/A 6
D1687 HOLD A2.01 (E) (E) (E) PT-01 (E) (E) (E) (E) N/A N/A 6
D1700 SECOND CHECK A2.01 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1702 INTERVIEW A2.01 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
D1704 OFFICE A2.01 LVT-01 RB-01 PT-01 PT-01 PT-01 PT-01 (E) PT-02 (E) (E) 1
NOTE(S):
1. PATCH AND REPAIR EXISTING WALLS AS REQUIRED PRIOR TO NEW FINISH WORK.
2. ONLY NEW WALLS, DOORS, AND FRAMES SHALL RECEIVE NEW FINISH WORK.
3. PATCH AND REPAIR EXISTING WALL BASE AND STAINLESS STEEL WAINSCOTING AT LOCATIONS OF REMOVED WALLS.
4. PATCH AND REPAIR FLOORING AND CEILING ONLY IN LOCATION OF DEMOLISHED WALL.
5. PATCH AND REPAIR CEILING IN LOCATIONS OF NEW WORK ONLY. NEW PAINT TO EXTEND TO NEAREST CONTROL JOINT.
6. PATCH, REPAIR, AND REPAINT ENTIRE WALL SCHEDULED TO RECEIVE NEW WORK.
7. MODIFY EXISTING ACT-2 CEILING AS REQUIRED TO ACCOMMODATE NEW WORK, AND PROVIDE NEW CEILING GRID AND TILE IF REQUIRED.
ABBREVIATIONS:
ACT ACOUSTIC CEILING TILE
CPT CARPET
(E) EXISTING TO REMAIN
HPC HIGH PERFORMANCE FINISH
LM LINEAR METAL CEILING
LVT LUXURY VINYL TILE
PT PAINT
RB RUBBER BASE
RF RESILIENT ANTI-FATIGUE FLOORING
SS STAINLESS STEEL
9/4/2026 lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E-
FO
R R
EF
ER
EN
C
E O
N
LY
gr ay
4:46:23 PM x:\pdx cbp 2026\d-drawings\00 current\a9.01.dwg DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
1/ 4"
1/
2" 1"
BY REVISIONS APP
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
NO.DATE BY REVISIONS APPNO.
TYPE:
DISC. SHT. NO.
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
A
LL
T H
R
EE
P
LA
N
ES
A R
E
VI
SI
BL
E.
T
H
IS
G U
ID
AN
C E
IS
P
R O
VI
D
ED
F
O R
R
EF
ER
EN
C E
O N
LY
D R
AW
IN
G S
C
AL
E
IS
R E
D U
C E
D
0% W
H
EN
S H
EE
T
SI
ZE
IS
1" x
7"
DATE
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
FINISH SCHEDULE
JAY OSTLUND
D. CALEM
A. LASKEY
D. CALEM
SEPTEMBER 2026
28 CD
PDX 2026-513 A9.022025D042 103146
ADDITIVE
ALTERNATE
#2
ADDITIVE
ALTERNATE
#2
| Sheets and Views |
| A9.02 |
| 2026-09-04T16:54:20-0700 | |
| Dave Calem |
File details come from the government source that posted it. Updated .