PDX 2026-513 (50) E1.12.pdf

PDF 488 KB Posted

Attached to
Portland International Airport Customs and Border Protection Improvements - Phase 2
Solicitation number
145968
Issued by
Multnomah County, Oregon

About this file

This file is an architectural drawing prepared for the Portland International Airport's Customs and Border Protection Improvements - Phase 2 project, a capital improvement initiative in Oregon. The document is a Deplaning Level - Sector 02 Demolition Reflected Ceiling Plan for Electrical systems, drawn at a scale of 1/8" = 1'-0" and dated September 2026. The drawing identifies multiple functional areas within the airport's deplaning level, including spaces designated for cashier operations, agriculture inspection, customs processing, baggage claim, restrooms, lockers, search areas, supervisor offices, communication rooms, and electrical/mechanical systems. The plan reflects existing ceiling conditions and electrical branch circuits with notations that contractors must trace and verify all existing lighting branch circuits against as-built drawings and provide red line markups documenting their findings. The drawing was prepared by M. Henning, with E. Close responsible for design oversight and B. Perry providing project coordination, under the professional registration of Oregon Engineer No. 86683 (valid through December 31, 2026).

The drawing is part of a comprehensive airport modernization project managed through design documentation processes. The electrical demolition reflected ceiling plan serves as a reference document for contractors involved in the renovation and upgrade work within Sector 02 of the deplaning level. No explicit pricing, contract terms, funding sources, or procurement timelines are detailed within this technical drawing. The document is intended for permit review and represents one sheet in a larger set of construction documents, with references to related sheets E1.11 and E1.13 for continued scope documentation.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-513 (06) A0.01.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D1708

FPR

LAB

D1709

FPR

SEARCH

D1710

FPR

KENNEL

D1638

GPM

STAIRS

453OFFICE

D1603

FPU

BAGGAGE CLAIM

18882

IT OFFICE

D1601

FPR

CASHIER

D1636

GPM

DES9

D1612

FPU

VESTIBULE

D1610

FPR

OFFICE

D1611

FPR

LOCKERS

D1606

FPR

AGENTS

D1602

FPR

AGRICULTURE

D1614

FTO

MENS

D1613

FPR

SEARCH

D1608

FPR

SUPERVISOR

D1604

FPR

LAB

D1622

PMB

ELECT/MECH

D1616

FTO

WOMENS

D1615

FPR

SEARCH

D1624

FPR

COMM

D1707

FPR

CORR

D14177

OFFICE

D1706

OFFICE

D1708

LAB

D1709

SEARCH

D1710

KEN

D1636

ESC

D1638

STAIRS

D1614

MENS

D1616

WOMENS

D1613

SEARCH

D1615

SEARCHD1612

VESTIBULE

D1624

COMM

D1622

ELEC

D1601

CASHIER

D1707

CORR

D1622

ELECTRICAL

D1610

OFFICE

D1624

FPR

COMM

D1615

SEARCH

D1613

SEARCH

D1616

WOMENS

D1614

MENS

D1612

VESTIBULE

D1603

CUSTOMS

D1636

ESCALATOR

D1601

CASHIER

D1603

CUSTOMS

D1603

CUSTOMS

D14177

OFFICE

D1603

CUSTOMS

D1602

OFFICE

D1606

OFFICE

D1604

OFFICE

D1611

LOCKERS

D1611A

LOCKERS

4D1A:9

4D1A:9

E4D1A:3

E4D1A:3

D45 D44 D43 D42 D41 D40 D39

DE

DD

DC

DB

DA

SCALE:

DEPLANING LEVEL - SECTOR 02 - DEMOLITION REFLECTED CEILING PLAN - ELECTRICAL

1/8" = 1'-0"1

9/8/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:37:52 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\e1.12 deplaning level-sector 02 - lighting demo plan -electrical.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

KEY PLAN

SCALE: N.T.S.

N

THE AREA BELOW IS TO BE LEFT BLANK - FOR

USE BY CITY FOR PERMIT REVIEW STAMP ONLY-

Salem 503-584-1576 www.landisconsulting.com

PORTLAND INTERNATIONAL AIRPORT

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2

PDX 2026-5132025D042 103146

M. HENNING

E. CLOSE

B. PERRY

SEPTEMBER 2026

JAY OSTLUND

CD

PDERETSI

GER LA

NOI

SSEFOR

OREGON

86683

NIG

N

E R

EE

8 , 2

M A Y

PERRY

B

EN

JAMI N

E.

EXPIRES: 12-31-2026

Digitally Signed

DEPLANING LEVEL - SECTOR 02 - DEMOLITION

REFLECTED CEILING PLAN - ELECTRICAL

E1.12

N

SCALE: IN FEET

0' 4' 8' 16' 24'

(RR)

(RR)

(RR)

(E)

C O

N

TI

N U

ED

O

N S

H

EE

T E1

.1

C O

N

TI

N U

ED

O

N S

H

EE

T E1

.1

C O

N

TIN

U

ED

O N

SH

EET E1.11

C O

N

TIN

U

ED

O N

SH

EET E1.11

NOTE:

1. EXISTING LIGHTING BRANCH CIRCUITS ARE FROM

AS-BUILT DRAWINGS. CONTRACTOR TO TRACE

LIGHTING BRANCH CIRCUITS FOR VERIFICATION

AND PROVIDE RED LINE MARKUPS FOR THESE

CIRCUITS ON THE CONTRACTOR AS-BUILT

DRAWINGS.

2026-09-08T14:32:12-0700
Digitally Signed
Benjamin Earl Perry

File details come from the government source that posted it. Updated .