PDX 2026-513 (69) T1.02.pdf
PDF 402 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is a demolition plan drawing for the Portland International Airport Customs and Border Protection (CBP) Improvements - Phase 2 project in Portland, Oregon. The drawing, designated as sheet T1.02, depicts the deplaning level sector 02 and specifically focuses on technology-related demolition work required for the project. The plan illustrates the layout of various functional areas including offices, labs, search areas, customs facilities, baggage claim areas, escalators, and electrical rooms across the terminal sector. The drawing includes three key notes directing contractors to remove existing cable infrastructure back to patch panels in room D1642, remove existing camera and cable back to patch panel in room D1605, and verify existing camera identification numbers for as-built documentation. The document is dated September 8, 2026, and was prepared by DBC Architecture Inc. under the direction of project team members including M. Henning, E. Close, and B. Perry, with professional engineering oversight provided by Jay Ostlund.
The drawing is part of the design and construction documentation package for the CBP improvements project at Portland International Airport and serves as a reference document for contractors executing demolition work related to technology infrastructure. The plan is drawn at a scale of 1/8" = 1'-0" and includes cross-references to related sheets T1.01, T1.03, and T2.02 for comprehensive understanding of the full scope of work. The document indicates that existing monitoring equipment and conduit in certain areas are to remain in place, with only specified cable and camera systems subject to removal and relocation. This technical drawing is essential for coordinating the removal and potential reinstallation of technology systems during the renovation phase of the airport improvement project.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D1706
OFFICE
D1708
LAB
D1709
SEARCH
D1710
KEN
D1636
ESC
D1638
STAIRS
D1644
OFFICE
D1614
MENS
D1616
WOMENS
D1613
SEARCH
D1615
SEARCHD1612
VESTIBULE
D1624
COMM
D1622
ELEC
D1601
CASHIER
D1640
STAIRS
D1707
CORR
D1622
ELECTRICAL
D1610
OFFICE
D1624
FPR
COMM
D1615
SEARCH
D1613
SEARCH
D1616
WOMENS
D1614
MENS
D1612
VESTIBULE
D1603
CUSTOMS
D1636
ESCALATOR
D1601
CASHIER
D1603
CUSTOMS
D1603
CUSTOMS
D14177
OFFICE
D1603
CUSTOMS
D1602
OFFICE
D1606
OFFICE
D1604
OFFICE
D1611
LOCKERS
D1611A
LOCKERS
D1603
BAGGAGE CLAIM
D1642
LAN
D1604
OFFICE
D1602
OFFICE
D1611
LOCKERS
D1610
OFFICE
D1608
SUPERVISOR
D1603
CUSTOMS
D1606
OFFICE
D14177
OFFICE
J J
JJ
D45 D44 D43 D42 D41 D40 D39
DE
DD
DC
DB
DA
9/8/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
1:42:12 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\t1.02 deplaning level - sector 02 - demolition plan - technology.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
KEY PLAN
SCALE: N.T.S.
N
THE AREA BELOW IS TO BE LEFT BLANK - FOR
USE BY CITY FOR PERMIT REVIEW STAMP ONLY-
Salem 503-584-1576 www.landisconsulting.com
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
PDX 2026-5132025D042 103146
M. HENNING
E. CLOSE
B. PERRY
SEPTEMBER 2026
JAY OSTLUND
CD
PDERETSI
GER LA
NOI
SSEFOR
OREGON
86683
NIG
N
E R
EE
8 , 2
M A Y
PERRY
B
EN
JAMI N
E.
EXPIRES: 12-31-2026
Digitally Signed
DEPLANING LEVEL - SECTOR 02 - DEMOLITION PLAN - TECHNOLOGY
T1.02
N
SCALE: IN FEET
0' 4' 8' 16' 24'
SCALE:
DEPLANING LEVEL - SECTOR 02 - DEMOLITION PLAN - TECHNOLOGY
1/8" = 1'-0"1
(RR)
CCD.1T.ROW A.RACK 1
CCD.1T.ROW A.RACK 2
CCD.1T.ROW A.RACK 3
C O
N
TI
N U
ED
O
N S
H
EE
T T1
.0
C O
N
TI
N U
ED
O
N S
H
EE
T T1
.0
C O
N
TIN
U
ED
O N
SH
EET T1.01
C O
N
TIN
U
ED
O N
SH
EET T1.01
(E)(E)
(E)(E)
#KEY NOTE(S) :
1. REMOVE EXISTING CABLE BACK TO PATCH PANEL
IN RACKS IN ROOM D1642. EXISTING MONITOR,
BACK BOX, AND CONDUIT TO REMAIN. SEE T2.02
FOR MORE INFORMATION.
2. REMOVE EXISTING CAMERA AND CABLE BACK TO
PATCH PANEL IN RACK IN ROOM D1605. SEE T2.02
FOR LOCATION OF NEW CAMERA. RETURN
CAMERA TO PORT IT.
3. CONTRACTOR TO VERIFY EXISTING CAMERA ID
NUMBER AND PROVIDE ON AS-BUILTS.
| 2026-09-08T14:31:52-0700 | |
| Digitally Signed | |
| Benjamin Earl Perry |
File details come from the government source that posted it. Updated .