PDX 2026-513 (69) T1.02.pdf

PDF 402 KB Posted

Attached to
Portland International Airport Customs and Border Protection Improvements - Phase 2
Solicitation number
145968
Issued by
Multnomah County, Oregon

About this file

This is a demolition plan drawing for the Portland International Airport Customs and Border Protection (CBP) Improvements - Phase 2 project in Portland, Oregon. The drawing, designated as sheet T1.02, depicts the deplaning level sector 02 and specifically focuses on technology-related demolition work required for the project. The plan illustrates the layout of various functional areas including offices, labs, search areas, customs facilities, baggage claim areas, escalators, and electrical rooms across the terminal sector. The drawing includes three key notes directing contractors to remove existing cable infrastructure back to patch panels in room D1642, remove existing camera and cable back to patch panel in room D1605, and verify existing camera identification numbers for as-built documentation. The document is dated September 8, 2026, and was prepared by DBC Architecture Inc. under the direction of project team members including M. Henning, E. Close, and B. Perry, with professional engineering oversight provided by Jay Ostlund.

The drawing is part of the design and construction documentation package for the CBP improvements project at Portland International Airport and serves as a reference document for contractors executing demolition work related to technology infrastructure. The plan is drawn at a scale of 1/8" = 1'-0" and includes cross-references to related sheets T1.01, T1.03, and T2.02 for comprehensive understanding of the full scope of work. The document indicates that existing monitoring equipment and conduit in certain areas are to remain in place, with only specified cable and camera systems subject to removal and relocation. This technical drawing is essential for coordinating the removal and potential reinstallation of technology systems during the renovation phase of the airport improvement project.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-513 (06) A0.01.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D1706

OFFICE

D1708

LAB

D1709

SEARCH

D1710

KEN

D1636

ESC

D1638

STAIRS

D1644

OFFICE

D1614

MENS

D1616

WOMENS

D1613

SEARCH

D1615

SEARCHD1612

VESTIBULE

D1624

COMM

D1622

ELEC

D1601

CASHIER

D1640

STAIRS

D1707

CORR

D1622

ELECTRICAL

D1610

OFFICE

D1624

FPR

COMM

D1615

SEARCH

D1613

SEARCH

D1616

WOMENS

D1614

MENS

D1612

VESTIBULE

D1603

CUSTOMS

D1636

ESCALATOR

D1601

CASHIER

D1603

CUSTOMS

D1603

CUSTOMS

D14177

OFFICE

D1603

CUSTOMS

D1602

OFFICE

D1606

OFFICE

D1604

OFFICE

D1611

LOCKERS

D1611A

LOCKERS

D1603

BAGGAGE CLAIM

D1642

LAN

D1604

OFFICE

D1602

OFFICE

D1611

LOCKERS

D1610

OFFICE

D1608

SUPERVISOR

D1603

CUSTOMS

D1606

OFFICE

D14177

OFFICE

J J

JJ

D45 D44 D43 D42 D41 D40 D39

DE

DD

DC

DB

DA

9/8/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:42:12 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\t1.02 deplaning level - sector 02 - demolition plan - technology.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

KEY PLAN

SCALE: N.T.S.

N

THE AREA BELOW IS TO BE LEFT BLANK - FOR

USE BY CITY FOR PERMIT REVIEW STAMP ONLY-

Salem 503-584-1576 www.landisconsulting.com

PORTLAND INTERNATIONAL AIRPORT

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2

PDX 2026-5132025D042 103146

M. HENNING

E. CLOSE

B. PERRY

SEPTEMBER 2026

JAY OSTLUND

CD

PDERETSI

GER LA

NOI

SSEFOR

OREGON

86683

NIG

N

E R

EE

8 , 2

M A Y

PERRY

B

EN

JAMI N

E.

EXPIRES: 12-31-2026

Digitally Signed

DEPLANING LEVEL - SECTOR 02 - DEMOLITION PLAN - TECHNOLOGY

T1.02

N

SCALE: IN FEET

0' 4' 8' 16' 24'

SCALE:

DEPLANING LEVEL - SECTOR 02 - DEMOLITION PLAN - TECHNOLOGY

1/8" = 1'-0"1

(RR)

CCD.1T.ROW A.RACK 1

CCD.1T.ROW A.RACK 2

CCD.1T.ROW A.RACK 3

C O

N

TI

N U

ED

O

N S

H

EE

T T1

.0

C O

N

TI

N U

ED

O

N S

H

EE

T T1

.0

C O

N

TIN

U

ED

O N

SH

EET T1.01

C O

N

TIN

U

ED

O N

SH

EET T1.01

(E)(E)

(E)(E)

#KEY NOTE(S) :

1. REMOVE EXISTING CABLE BACK TO PATCH PANEL

IN RACKS IN ROOM D1642. EXISTING MONITOR,

BACK BOX, AND CONDUIT TO REMAIN. SEE T2.02

FOR MORE INFORMATION.

2. REMOVE EXISTING CAMERA AND CABLE BACK TO

PATCH PANEL IN RACK IN ROOM D1605. SEE T2.02

FOR LOCATION OF NEW CAMERA. RETURN

CAMERA TO PORT IT.

3. CONTRACTOR TO VERIFY EXISTING CAMERA ID

NUMBER AND PROVIDE ON AS-BUILTS.

2026-09-08T14:31:52-0700
Digitally Signed
Benjamin Earl Perry

File details come from the government source that posted it. Updated .