PDX 2026-513 (10) A1.03.pdf

PDF 400 KB Posted

Attached to
Portland International Airport Customs and Border Protection Improvements - Phase 2
Solicitation number
145968
Issued by
Multnomah County, Oregon

About this file

This is an architectural demolition floor plan for Portland International Airport's Customs and Border Protection Improvements - Phase 2 project, a capital improvement initiative in Oregon. The document is a detailed demolition plan for the Deplaning Level - Sector 03, drawn to a scale of 1/8" = 1'-0", showing the specific areas and elements to be removed or modified during the demolition phase. Key demolition tasks include removal of existing doors and frames, demolition of walls to specified extents, removal of existing VCT flooring and adhesive with subfloor preparation, demolition of chain link fencing and gates, and removal and modification of existing handrails at stairs for reinstallation. The plan identifies multiple spaces within the sector including passport control areas, corrals, elevators, equipment rooms, storage areas, bag screening areas, and vestibules, with clear legend markings indicating existing items to remain and items designated for removal.

The demolition plan was prepared in September 2026 and referenced sheet number 10 of the construction documents (A1.03), with design coordination by Jay Ostlund, drawn by D. Calem, and checked by A. Laskey. The drawing is part of a comprehensive set of demolition plans for the deplaning level and coordinates with adjacent plan sheets. The document includes standard specifications noting that all dimensions are to face of finish unless otherwise noted, and that new wall finishes shall match existing adjacent wall finishes unless specified differently. This demolition plan serves as a foundational design document for construction contractors and establishes the scope of work for the removal phase of the airport's border protection facility improvements.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-513 (06) A0.01.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DE

DD

DC

DB

DA

D39 D38 D22 D21 D20 D19 D18D23

D1630

STAIRS

D1626

CORR

D1628

ELEV

D1620

ELEC

D1621

CORR

D1005

PASS THRU

D1632

EQUIP

D1691

STOR

D1623

BAG SCREENING

D1634

STOR

D1637

ELEC

D1635

MECH

D1601

CASHIER

D1618

STOR

D1639

WAITING

D1643

VESTIBULE

D1641

VESTIBULE

D1619

CORR

D1633

RECHECK

D1631

STAIRS

N

SCALE:

DEPLANING LEVEL - SECTOR 03 - DEMOLITION FLOOR PLAN

1/8" = 1'-0"1

SCALE: IN FEET

0' 4' 8' 16' 24'

NOTE(S):

1. ALL DIMENSIONS ARE TO FACE OF FINISH

UNLESS NOTED OTHERWISE.

2. ALL NEW WALL FINISHES SHALL MATCH

EXISTING ADJACENT WALL FINISHES UNLESS

NOTED OTHERWISE.

KEY NOTE(S) :

1. REMOVE EXISTING DOOR AND FRAME

2. DEMOLISH EXISTING WALL TO EXTENTS SHOWN

3. REMOVE EXISTING VCT FLOORING AND

ADHESIVE AND PREPARE SUBFLOOR TO

RECEIVE NEW FLOORING

4. DEMOLISH EXISTING CHAIN LINK FENCE AND

GATE

5. REMOVE EXISTING HANDRAIL AT SIDE OF STAIR

AND MODIFY FOR REINSTALLATION - SEE

DETAILS 9/A8.02 AND 10/A8.02

6. REMOVE EXISTING HANDRAIL AT CENTER OF

STAIR AND MODIFY FOR REINSTALLATION - SEE

DETAIL 11/A8.02

LEGEND:

EXISTING ITEM TO REMAIN

ITEM TO BE REMOVED

EXISTING CARPET TO BE REMOVED

EXISTING VCT TO BE REMOVED

8/27/2026 lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E-

FO

R R

EF

ER

EN

C

E O

N

LY

gr ay

1:54:12 PM x:\pdx cbp 2026\d-drawings\00 current\a1.01 deplaning demo plans.dwg DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

1/ 4"

1/

2" 1"

BY REVISIONS APP

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

NO.DATE BY REVISIONS APPNO.

TYPE:

DISC. SHT. NO.

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

A

LL

T H

R

EE

P

LA

N

ES

A R

E

VI

SI

BL

E.

T

H

IS

G U

ID

AN

C E

IS

P

R O

VI

D

ED

F

O R

R

EF

ER

EN

C E

O N

LY

D R

AW

IN

G S

C

AL

E

IS

R E

D U

C E

D

0% W

H

EN

S H

EE

T

SI

ZE

IS

1" x

7"

DATE

KEY PLAN

SCALE: N.T.S.

N

PORTLAND INTERNATIONAL AIRPORT

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2

DEPLANING LEVEL - SECTOR 03 - DEMOLITION PLAN

JAY OSTLUND

D. CALEM

A. LASKEY

D. CALEM

SEPTEMBER 2026

10 CD

PDX 2026-513 A1.032025D042 103146

2 3

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T A1

.0

5 6 5

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text D6

AutoCAD SHX Text D8

Sheets and Views
A1.03
2026-08-27T14:20:02-0700
Dave Calem

File details come from the government source that posted it. Updated .