PDX 2026-513 (66) E8.07.pdf
PDF 963 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is an electrical panel schedule drawing for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Portland, Oregon. The document is a technical design drawing (Sheet E8.07) dated September 2026 that provides detailed specifications for Panel 2D2A electrical installation. The drawing was prepared by Landis Consulting (www.landisconsulting.com) with design work by M. Henning, drawn by E. Close, and checked by B. Perry. The sheet includes a key plan with a north arrow, graphic scale references for both viewing and printing, and notation that the drawing scale is reduced 50% when printed on 11" x 17" sheet size. The document is a digitally signed professional engineering drawing with the signature of Benjamin Earl Perry, a registered Professional Engineer in Oregon (License #86683, expiring 12-31-2026), dated September 8, 2026.
The drawing is part of the Port of Portland's capital improvements project for international airport operations and contains standard engineering documentation elements including revision tracking, approval blocks, and notation that the area below the sheet is reserved for City of Portland permit review stamps. This technical document serves as construction documentation for electrical contractors and inspectors working on the customs and border protection facility upgrades at Portland International Airport.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/8/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
1:41:45 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\e8.07 panel schedule - panel 2d2a - electrical.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
KEY PLAN
SCALE: N.T.S.
N
THE AREA BELOW IS TO BE LEFT BLANK - FOR
USE BY CITY FOR PERMIT REVIEW STAMP ONLY-
Salem 503-584-1576 www.landisconsulting.com
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
PDX 2026-5132025D042 103146
M. HENNING
E. CLOSE
B. PERRY
SEPTEMBER 2026
JAY OSTLUND
CD
PDERETSI
GER LA
NOI
SSEFOR
OREGON
86683
NIG
N
E R
EE
8 , 2
M A Y
PERRY
B
EN
JAMI N
E.
EXPIRES: 12-31-2026
Digitally Signed
PANEL SCHEDULE - PANEL 2D2A - ELECTRICAL
E8.07
| 2026-09-08T14:31:34-0700 | |
| Digitally Signed | |
| Benjamin Earl Perry |
File details come from the government source that posted it. Updated .