PDX 2026-513 (13) A1.13.pdf

PDF 389 KB Posted

Attached to
Portland International Airport Customs and Border Protection Improvements - Phase 2
Solicitation number
145968
Issued by
Multnomah County, Oregon

About this file

This is an architectural drawing prepared for the Portland International Airport in Oregon as part of the Customs and Border Protection Improvements - Phase 2 project. The document is a Deplaning Level - Sector 03 Demolition Reflected Ceiling Plan drawn at a scale of 1/8" = 1'-0", prepared in September 2026. The plan identifies specific areas within the deplaning level including stairs, corridors, elevators, electrical rooms, equipment rooms, storage areas, bag screening facilities, restrooms, cashier stations, vestibules, and a waiting area. The drawing was designed by Jay Ostlund, drawn by D. Calem, and checked by A. Laskey.

The demolition plan specifies three key removal tasks: removal of existing acoustical ceiling tile (A.C.T.), lighting, and mechanical/electrical/plumbing (MEP) accessories; removal and salvage of existing lighting fixtures in the linear metal ceiling for reinstallation; and replacement of the existing CCTV camera system with provisions detailed on technology drawings. The document notes that all new wall finishes must match existing adjacent wall finishes unless otherwise specified, and all dimensions are provided to the face of finish. The drawing indicates items to remain, items to be removed, and identifies existing gypsum board and A.C.T. ceilings scheduled for demolition, with cross-references to related drawing sheets A1.12 for match line details.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-513 (06) A0.01.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D1630

STAIRS

D1626

CORR

D1628

ELEV

D1620

ELEC

D1621

CORR

D1005

PASS THRU

D1632

EQUIP

D1691

STOR

D1623

BAG SCREENING

D1634

STOR

D1637

ELEC

D1635

MECH

D1601

CASHIER

D1618

STOR

D1639

WAITING

D1643

VESTIBULE

D1641

VESTIBULE

D1619

CORR

D1633

RECHECK

D1631

STAIRS

DE

DD

DC

DB

DA

D39 D38 D22 D21 D20 D19 D18D23

N

SCALE:

DEPLANING LEVEL - SECTOR 03 - DEMOLITION REFLECTED CEILING PLAN

1/8" = 1'-0"1

SCALE: IN FEET

0' 4' 8' 16' 24'

NOTE(S):

1. ALL DIMENSIONS ARE TO FACE OF FINISH

UNLESS NOTED OTHERWISE.

2. ALL NEW WALL FINISHES SHALL MATCH

EXISTING ADJACENT WALL FINISHES UNLESS

NOTED OTHERWISE.

KEY NOTE(S) :

1. REMOVE EXISTING A.C.T. CEILING, LIGHTING,

AND MEP ACCESSORIES - SEE ELECTRICAL

2. REMOVE EXISTING LIGHTING IN LINEAR METAL

CEILING AND SALVAGE FOR REINSTALLATION

3. EXISTING CCTV CAMERA TO BE REPLACED -

SEE TECHNOLOGY DRAWINGS

LEGEND:

8/27/2026 lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E-

FO

R R

EF

ER

EN

C

E O

N

LY

gr ay

2:00:04 PM x:\pdx cbp 2026\d-drawings\00 current\a1.11 deplaning demo rcps.dwg DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

1/ 4"

1/

2" 1"

BY REVISIONS APP

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

NO.DATE BY REVISIONS APPNO.

TYPE:

DISC. SHT. NO.

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

A

LL

T H

R

EE

P

LA

N

ES

A R

E

VI

SI

BL

E.

T

H

IS

G U

ID

AN

C E

IS

P

R O

VI

D

ED

F

O R

R

EF

ER

EN

C E

O N

LY

D R

AW

IN

G S

C

AL

E

IS

R E

D U

C E

D

0% W

H

EN

S H

EE

T

SI

ZE

IS

1" x

7"

DATE

KEY PLAN

SCALE: N.T.S.

N

PORTLAND INTERNATIONAL AIRPORT

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2

DEPLANING LEVEL - SECTOR 03 - DEMOLITION REFLECTED CEILING PLAN

JAY OSTLUND

D. CALEM

A. LASKEY

D. CALEM

SEPTEMBER 2026

13 CD

PDX 2026-513 A1.132025D042 103146

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T A1

.1

EXISTING ITEM TO REMAIN

ITEM TO BE REMOVED

EXISTING GYPSUM BOARD CEILING

TO BE REMOVED

EXISTING A.C.T. CEILING TO BE

REMOVED

AutoCAD SHX Text D6

AutoCAD SHX Text D8

Sheets and Views
A1.13
2026-08-27T14:19:17-0700
Dave Calem

File details come from the government source that posted it. Updated .