PDX 2026-513 (04) GI3.00.pdf
PDF 388 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This file is a technical drawing specification document prepared for the Portland International Airport by the City of Portland, Oregon, detailing code information, work hours, and phasing requirements for Customs and Border Protection Improvements - Phase 2. The project encompasses selected tenant improvements to the International Arrivals Hall at Portland International Airport, including structural, mechanical, electrical, and signage work. The work must be completed during hours when the Federal Inspection Station and International Arrivals Hall are not in operation, with specific work schedules to be confirmed with the Port and Customs and Border Protection officials prior to construction. The project includes passport control booth replacement work that shall be executed in two phases to ensure no more than five passport control booths are out of service simultaneously, proceeding from north to south. New carpet work in the passport control booth area must be completed after temporary construction walls have been removed. The contractor is required to coordinate all work activities with other concurrent airport construction projects.
The project site is located within the Portland International Airport Plan District, classified as General Industrial 2 zoning. The work must comply with the 2025 Oregon Structural Specialty Code, 2025 Oregon Energy Efficiency Specialty Code, 2023 Oregon Electrical Specialty Code, 2025 Oregon Mechanical Specialty Code, 2025 Oregon Fire Code, 2023 Portland Fire Code, 2024 Oregon Elevator Specialty Code, Portland City Code, and 2010 ADA Standards for Accessible Design. The terminal building is Type IA construction with sprinklering systems and specific fire resistive ratings for structural elements, including three-hour ratings for steel columns and primary beams. Existing conditions shown in the drawing are current as of the bid date but remain subject to change based on ongoing airport construction activities.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPLANING
ENPLANING
MEZZANINE
PENTHOUSE
ROOF
TUNNEL
TYP. 2-HR RATED
STAIR SHAFT
TYP. 2-HR RATED
CONVEYOR DOGHOUSE
TYP. 2-HR RATED
UTILITY SHAFT
TYP. 2-HR RATED
FLOOR/CEILING
ASSEMBLY, TYP. ALL
LEVELS
TYP. 2-HR RATED
ROOF/CEILING ASSEMBLY
D 14573
O
FFIC
E9'-6" MIN.
CLEAR
6'-6" M
IN
C
LEAR
D1605
OFFICE
D14573
OFFICE
D1603
BAGGAGE CLAIM
D1600
IMMIGRATION
PHASE 2 TEMPORARY
CONSTRUCTION WALLS
PHASE 1 TEMPORARY
CONSTRUCTION WALLS
DD DC DB DA
D47
D46
D45
THE TERMINAL BUILDING, PEDESTRIAN TUNNELS AND CONCOURSES ARE
CONSIDERED A SINGLE BUILDING AND ARE OF TYPE IA CONSTRUCTION.
EXISTING OCCUPANCY GROUPS:
DEPLANING LEVEL: ENPLANING LEVEL: MEZZANINE LEVEL:
A-2 ASSEMBLY A-2 ASSEMBLY A-2 ASSEMBLY
A-3 ASSEMBLY A-3 ASSEMBLY A-3 ASSEMBLY
B BUSINESS B BUSINESS B BUSINESS
S-1 STORAGE M MERCANTILE M MERCANTILE
S-1 STORAGE S-1 STORAGE
PENTHOUSE LEVEL:
S-1 STORAGE
THE EXISTING BUILDING IS SPRINKLERED.
BUILDING CODE INFORMATION:
STRUCTURAL FIREPROOFING REQUIREMENTS:
STEEL COLUMNS: 3 HOURS, UL DESIGN X 722
STEEL DECK ROOF ASSEMBLY: 1 1/2 HOURS, UL DESIGN P 711
PRIMARY ROOF BEAMS: 3 HOURS, UL DESIGN S 715
SECONDARY ROOF BEAMS AND BAR JOISTS: 1 1/2 HOURS, UL DESIGN P 711
PRIMARY FLOOR BEAMS: 3 HOURS, UL DESIGN N 706
FLOOR DECK: 2 HOURS TYP., UL DESIGN D 779
FIRESTOPPING REQUIREMENTS:
2-HR RATED FLOOR/CEILING ASSEMBLY, SHAFT AND STAIR ENCLOSURES:
ALL PENETRATIONS THROUGH RATED ELEMENTS OR ASSEMBLIES SHALL BE
PART OF AN APPROVED UL LISTED ASSEMBLY OR ENGINEERING JUDGEMENT.
SEE STRUCTURAL FIREPROOFING REQUIREMENTS ABOVE FOR EXISTING
RATED ASSEMBLIES.
THE PDX FIRE AND LIFE SAFETY SUMMARY REPRESENTS STANDARDS OF
CONSTRUCTION THAT HAVE BEEN FOUND BY THE CITY OF PORTLAND BUREAU
OF DEVELOPMENT SERVICES AND THE FIRE BUREAU TO PROVIDE SAFETY
EQUIVALENCY TO THE REQUIREMENTS OF NFPA 72 AND THE 2025 OREGON
STRUCTURAL SPECIALTY CODE.
1. THE PORTLAND INTERNATIONAL AIRPORT IS A MIXED USE OCCUPANCY
BUILDING WITH NO SEPARATION REQUIRED BETWEEN OCCUPANCIES.
2. NO SEPARATION SHALL BE REQUIRED BETWEEN OCCUPANCIES
PROVIDED THE BUILDING MEETS THE STANDARDS OF CONSTRUCTION
SET FORTH IN THE SUMMARY.
AN AUTOMATIC FIRE DETECTION AND EMERGENCY VOICE/ALARM
COMMUNICATION SYSTEM, WHICH ALSO SERVES AS A PUBLIC ADDRESS
SYSTEM, IS INSTALLED THROUGHOUT THE PDX TERMINAL BUILDING AND
CONCOURSES, UTILITY TUNNELS, AND PEDESTRIAN TUNNELS. THE ENTIRE
SYSTEM CONFORMS TO THE MOST RESTRICTIVE APPLICABLE PROVISIONS OF
CHAPTER 9 OF THE 2007 OREGON STRUCTURAL SPECIALTY CODE FOR GROUP
A OCCUPANCIES WITH AN OCCUPANT LOAD OF 1000 OR MORE AND WAS
INSTALLED IN ACCORDANCE WITH NFPA 72.
(FROM 2025 OSSC TABLE 601)
BUILDING ELEMENT: TYPE 1A:
STRUCTURAL FRAME 3 HOUR
BEARING WALLS 3 HOUR
EXTERIOR NON-BEARING WALLS NON-RATED, BASED ON FIRE
SEPARATION OF 30' OR MORE
INTERIOR NON-BEARING WALLS NON-RATED
FLOOR CONSTRUCTION 2 HOUR
ROOF CONSTRUCTION 1 1/2 HOUR
SHAFTS (FROM 2019 OSSC 713.4) 2 HOUR
SEE DETAIL 1 FOR ADDITIONAL INFORMATION.
ZONING DATA:
· ZONE: GENERAL INDUSTRIAL 2 (IG2)
· PLAN DISTRICT: PORTLAND INTERNATIONAL AIRPORT PLAN DISTRICT
PROJECT SCOPE:
· SELECTED TENANT IMPROVEMENTS TO THE INTERNATIONAL ARRIVALS
HALL AT PORTLAND INTERNATIONAL AIRPORT, INCLUDING ASSOCIATED
STRUCTURAL, MECHANICAL, ELECTRICAL, AND SIGNAGE WORK.
APPLICABLE CODES:
· 2025 OREGON STRUCTURAL SPECIALTY CODE (OSSC)
· 2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE (OEESC)
· 2023 OREGON ELECTRICAL SPECIALTY CODE (OESC)
· 2025 OREGON MECHANICAL SPECIALTY CODE (OMSC)
· 2025 OREGON FIRE CODE (OFC)
· 2023 PORTLAND FIRE CODE
· 2024 OREGON ELEVATOR SPECIALTY CODE
· PORTLAND CITY CODE AND ADMINISTRATIVE RULES
· TITLE 24 BUILDING REGULATIONS
· TITLE 31 FIRE REGULATIONS
· 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
1. WORK HOURS ARE LIMITED TO HOURS WHEN THE FEDERAL
INSPECTION STATION / INTERNATIONAL ARRIVALS HALL IS NOT
IN OPERATION, WHICH VARIES BOTH DAILY AND SEASONALLY.
WORK HOURS SHALL BE CONFIRMED WITH THE PORT AND
CUSTOMS AND BORDER PROTECTION OFFICIALS PRIOR TO
CONSTRUCTION.
WORK HOURS:
1. EXISTING CONDITIONS SHOWN ARE UP TO DATE AS OF THE TIME
OF BID, AND ARE SUBJECT TO CHANGE BASED ON CURRENT
AIRPORT CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL COORDINATE WORK ACTIVITIES REQUIRED
BY THIS PROJECT WITH OTHER CURRENT AIRPORT
CONSTRUCTION ACTIVITIES.
EXISTING CONDITIONS:
SCALE:
OVERALL BUILDING
RATED ASSEMBLIES DIAGRAM - SECTION
N.T.S.1
8/27/2026 lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E-
FO
R R
EF
ER
EN
C
E O
N
LY
gr ay
2:25:42 PM x:\pdx cbp 2026\d-drawings\00 current\gi3.00.dwg DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
1/ 4"
1/
2" 1"
BY REVISIONS APP
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
NO.DATE BY REVISIONS APPNO.
TYPE:
DISC. SHT. NO.
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
A
LL
T H
R
EE
P
LA
N
ES
A R
E
VI
SI
BL
E.
T
H
IS
G U
ID
AN
C E
IS
P
R O
VI
D
ED
F
O R
R
EF
ER
EN
C E
O N
LY
D R
AW
IN
G S
C
AL
E
IS
R E
D U
C E
D
0% W
H
EN
S H
EE
T
SI
ZE
IS
1" x
7"
DATE
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
CODE INFORMATION, WORK HOURS, AND PHASING
JAY OSTLUND
D. CALEM
A. LASKEY
D. CALEM
SEPTEMBER 2026
4 CD
PDX 2026-513 GI3.002025D042 103146
PROJECT DATA: FIRE RESISTIVE RATINGS FOR BUILDING ELEMENTS:
1. PASSPORT CONTROL BOOTH REPLACEMENT WORK SHALL BE
DONE IN 2 PHASES, SO THAT NO MORE THAN 5 PASSPORT
CONTROL BOOTHS SHALL BE OUT OF SERVICE AT ANY TIME.
2. CONTRACTOR SHALL PROCEED WITH PASSPORT CONTROL
BOOTH WORK FROM NORTH TO SOUTH - SEE DETAIL 3GI3.00
FOR PHASING PLAN.
3. NEW CARPET WORK IN PASSPORT CONTROL BOOTH AREA
SHALL BE DONE AFTER TEMPORARY CONSTRUCTION WALLS
HAVE BEEN REMOVED.
PROJECT PHASING:
SCALE:
PHASING PLAN @ PASSPORT CONTROL BOOTHS
1/8" = 1'-0"2
N
SCALE: IN FEET
0' 4' 8' 16' 24'
| Sheets and Views |
| GI3.00 |
| 2026-08-27T14:26:51-0700 | |
| Dave Calem |
File details come from the government source that posted it. Updated .