This is a project description document for Portland International Airport's Customs and Border Protection (CBP) Improvements - Phase 2, prepared by the Port of Portland in Oregon. The project encompasses the design and construction of enhanced CBP facilities at PDX, including modifications to the international arrivals area, baggage handling systems, and related infrastructure improvements to support increased passenger processing capacity and meet current federal security and operational standards. The scope includes structural modifications, mechanical and electrical system upgrades, plumbing infrastructure, fire protection systems, and technology integration for border security operations. The project is designed to accommodate future growth in international travel while improving operational efficiency and passenger experience.
The project represents a significant capital improvement initiative funded through Port of Portland revenues and potential federal grants or loans. Phase 2 builds upon preliminary work completed in Phase 1 and addresses critical infrastructure gaps identified in the master planning process. The improvements are necessary to maintain CBP compliance, accommodate TSA screening requirements, and support the airport's strategic growth objectives for international service. Construction scheduling, phasing logistics, and coordination with ongoing airport operations are critical considerations given the need to maintain terminal functionality throughout the implementation period. The project timeline and specific budget allocations would be established through the competitive procurement process and detailed project agreements between the Port of Portland and selected design-build or general contracting firms.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/8/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
1:36:52 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\e0.03 mechanical equipment connection and lighting schedules.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
THE AREA BELOW IS TO BE LEFT BLANK - FOR
USE BY CITY FOR PERMIT REVIEW STAMP ONLY-
Salem 503-584-1576 www.landisconsulting.com
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
PDX 2026-5132025D042 103146
M. HENNING
E. CLOSE
B. PERRY
SEPTEMBER 2026
JAY OSTLUND
CD
PDERETSI
GER LA
NOI
SSEFOR
OREGON
86683
NIG
N
E R
EE
8 , 2
M A Y
PERRY
B
EN
JAMI N
E.
EXPIRES: 12-31-2026
Digitally Signed
MECHANICAL EQUIPMENT CONNECTION AND
LIGHTING SCHEDULES - ELECTRICAL
E0.03
INTERIOR LUMINAIRE SCHEDULE
FIXTURE
NO. DESCRIPTION LAMP
TYPE LUMENS CRI COLOR
TEMP. DRIVER EMERGENCY
DRIVER
INTEGRAL
MOTION/PHOTO
SENSOR
VOLTS LOAD MFR. MODEL NUMBER
L2 LED 4" SQUARE APERTURE FXED TRIMMED DOWNLIGHT WITH STEEL HOUSING; AND
45-DEGREE DISTRIBUTION. LED 1,500 LM 80 3500K
STANDARD
0-10V
1% DIMMING
NO NO UNV 13.7 WATTS GOTHAM OR
APPROVED EQUAL EVO SQUARE SERIES
L3 LED INDIRECT EDGE-LIT RECESSED 2X2 LED TROFFER. WITH STEEL HOUSING, PARALLEL
OPTIC RAILS, BATWING DISTRIBUTION AND DIFFUSE WHITE POWDER COAT FINISH. LED 3,450 LM 80 3500K
INTEGRAL
0-10V
1% DIMMING
NO NO UNV 28 WATTS FLUXWERX OR
APPROVED EQUAL RAIL SERIES
L3A LED INDIRECT EDGE-LIT RECESSED 2X4 LED TROFFER. WITH STEEL HOUSING, PARALLEL
OPTIC RAILS, BATWING DISTRIBUTION AND DIFFUSE WHITE POWDER COAT FINISH. LED 3,400 LM 80 3500K
INTEGRAL
0-10V
1% DIMMING
NO NO UNV 28 WATTS FLUXWERX OR
APPROVED EQUAL RAIL SERIES
L4
RECESSED LINEAR DIRECT LED FIXTURE WITH 800 LUMENS PER FOOT. DIRECT
BATWING DISTRIBUTION WITH LOUVERS TO MATCH EXISTING CORRIDOR FIXTURES. 4"
WIDE X 4" HIGH X LENGTH AS SHOWN ON THD DRAWINGS, ALUMINUM HOUSING AND
FLUSH WHITE LENS WITH DIRECT BATWING DISTRIBUTION AND DIFFUSE WHITE POWDER
COAT FINISH.
LED 800 LM/FT 80 3500K
STANDARD
0-10V
1% DIMMING
NO NO UNV 27 WATTS
MARK
ARCHITECTURAL OR
APPROVED EQUAL
S4RD SERIES
L8 SURFACE MOUNTED LINEAR PREMIUM EFFICIENCY LED STRIP FIXTURE WITH WIDE
DIFFUSE LENS THAT PROVIDES MINIMUM 5% UPLIGHT AND WIRE GUARD. LED 4,100 LM 80 3500K STANDARD
0-10V NO NO UNV 28 WATTS LITHONIA OR
APPROVED EQUAL CLX SERIES
MECHANICAL EQUIPMENT CONNECTION SCHEDULE
EQUIPMENT TAG SHEET REF
ELECTRICAL CONDUIT CONDUCTORS
PANEL CIRCUIT LOCAL
DISCONNECT
DISCONNECT
RATING NOTES
VOLTAGE PHASE MCA MOCP HP WATTS FLA FLA @ 125% QTY SIZE UNGROUNDED GROUNDED GROUNDING
HEATED AIR CURTAINS HAC-DE-101 E2.03 480 3 - - - 20,000 - - 1 0.75 INCH 3 - #8 1 - #8 1 - #10 4D1A 26,28,30 YES 30 2
HEATED AIR CURTAINS HAC-DE-102 E2.03 480 3 - - - 20,000 - - 1 0.75 INCH 3 - #8 1 - #8 1 - #10 4D1A 38,40,42 YES 30 2
TERMINAL UNIT VVR-D-120 E2.02 277 1 5 20 - - - - 1 0.75 INCH 1 - #12 1 - #12 1 - #12 4D1A 27 YES 30 1
NOTES:
[1] CONNECT TO EXISTING CIRCUIT.
[2] PROVIDE LOCKABLE DISCONNECT SWITCH.
| 2026-09-08T14:31:57-0700 | |
| Digitally Signed | |
| Benjamin Earl Perry |
File details come from the government source that posted it. Updated .