PDX 2026-513 (20) A5.01.pdf
PDF 400 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is an architectural drawing document for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon. The drawing, sheet A5.01, depicts an enlarged floor plan for the Passport Control area and related spaces, including the Immigration, Office, and Baggage Claim zones. The plan illustrates new construction elements such as ten millwork passport control booths, a supervisor booth, new queuing swing gates, new carpet and resilient anti-fatigue flooring installations, new electrical raceway extensions, and intumescent paint applications on existing structural columns. The drawing includes two additive alternate options for the project. Wall finishes are specified to match existing adjacent finishes unless noted otherwise, with detailed construction references provided on sheet A8.01. All dimensions are noted to the face of finish, and the drawing was prepared and submitted in September 2026.
The drawing contains no information regarding pricing terms, contract duration, funding sources, or other business-related contract conditions. The document is a technical architectural plan prepared as part of the design phase for the broader Customs and Border Protection improvements project at Portland International Airport and serves as a specification document for construction contractors bidding on or executing this work.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D1605
OFFICE
D14573
OFFICE
D1600
IMMIGRATION
D1603
BAGGAGE CLAIM
3'-8" 4'-0"
3'-4"
4'-0"
7'-6" 1'-6"
3'-8" 4'-0"
3'-4"
4'-0" 3'-8" 4'-0"
3'-4"
4'-0" 3'-8" 4'-0"
3'-4"
4'-0" 3'-8" 4'-0"
3'-4"
4'-0" 3'-8" 4'-0"
3'-4"
4'-0" 3'-8" 4'-0"
3'-4"
4'-0" 3'-8" 4'-0"
3'-4"
4'-0" 3'-8" 4'-0"
3'-4"
4'-0" 3'-8" 4'-0"
3'-4"
4'-0"
5'-0"
11'-10"
DC DB DA
D47
D46
D45
N
SCALE:
ENLARGED PLAN - PASSPORT CONTROL
1/4" = 1'-0"1
NOTE(S):
1. ALL DIMENSIONS ARE TO FACE OF FINISH UNLESS
NOTED OTHERWISE.
2. ALL NEW WALL FINISHES SHALL MATCH EXISTING
ADJACENT WALL FINISHES UNLESS NOTED
OTHERWISE.
3. ALL WALLS SHALL BE UNLESS OTHERWISE
NOTED.
4. SEE SHEET A8.01 FOR WALL TYPE CONSTRUCTION.
C 4 P1
KEY NOTE(S) :
1. NEW DOOR AND FRAME - SEE DOOR SCHEDULE
2. NEW WORK ADDED TO EXISTING DOOR - SEE
DOOR SCHEDULE
3. NEW CARPET TO EXTENTS SHOWN - SEE FINISH
SCHEDULE
4. NEW QUEUING SWING GATE ATTACHED TO
MILLWORK SUPERVISOR STATION WALLS -
F.O.I.C.
5. NEW INTUMESCENT PAINT ON EXISTING
STRUCTURAL COLUMN
6. NEW MILLWORK PASSPORT CONTROL BOOTH -
TYP. OF 10 - F.O.I.C.
6. NEW MILLWORK SUPERVISOR BOOTH - F.O.I.C.
7. EDGE OF EXISTING YELLOW CARPET STRIP
8. NEW CARPET EDGE TO ALIGN WITH WEST EDGE
OF DEMOLISHED COLUMN COVER
9. EXISTING ELECTRICAL RACEWAY RECESSED
INTO CONCRETE FLOOR
10. NEW ELECTRICAL RACEWAY EXTENSION
RECESSED INTO CONCRETE FLOOR - SEE
DETAIL 8/A8.01
11. DEFLECTION HEAD AT TOP OF WALL - SEE
DETAIL 11/A8.01
12. NEW RESILIENT ANTI-FATIGUE FLOORING TO
EXTENTS SHOWN - SEE FINISH SCHEDULE
9/4/2026 lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E-
FO
R R
EF
ER
EN
C
E O
N
LY
gr ay
4:50:08 PM x:\pdx cbp 2026\d-drawings\00 current\a5.01 enlarged plans.dwg DRAWING SCALE IS R('8&('�50� WHEN SHEET SIZE IS 11" x 17"
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
1/ 4"
1/
2" 1"
BY REVISIONS APP
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
NO.DATE BY REVISIONS APPNO.
TYPE:
DISC. SHT. NO.
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
A
LL
T H
R
EE
P
LA
N
ES
A R
E
VI
SI
BL
E.
T
H
IS
G U
ID
AN
C E
IS
P
R O
VI
D
ED
F
O R
R
EF
ER
EN
C E
O N
LY
D R
AW
IN
G S
C
AL
E
IS
R �5 0�
W H
EN
S
H
EE
T
SI
ZE
IS
1" x
7"
DATE
KEY PLAN
SCALE: N.T.S.
N
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
ENLARGED FLOOR PLANS 1
JAY OSTLUND
D. CALEM
A. LASKEY
D. CALEM
SEPTEMBER 2026
20 CD
PDX 2026-513 A5.012025D042 103146
SCALE: IN FEET
0' 2' 4' 8' 12'
A8.03
D 4 P1
D14573 1
D1600F25 6
LEGEND:
11 10
12345678910
ADDITIVE
ALTERNATE
#2
ADDITIVE
ALTERNATE
#1
EXISTING ITEM TO REMAIN
NEW ITEM
NEW WALL
NEW CARPET
NEW RESILIENT ANTI-FATIGUE FLOORING
NEW VINYL FLOOR TILE - ORIENT AS
SHOWN
| Sheets and Views |
| A5.01 |
| 2026-09-04T16:53:08-0700 | |
| Dave Calem |
File details come from the government source that posted it. Updated .