PDX 2026-513 (39) M2.01.pdf
PDF 291 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is a mechanical floor plan drawing for the Customs and Border Protection (CBP) Improvements Phase 2 project at Portland International Airport in Oregon, prepared by Arris Consulting. The drawing depicts the deplaning level sector 01 floor plan with mechanical systems design and shows various functional spaces including immigration offices, holding areas, isolation rooms, equipment rooms, corridors, stairs, elevators, and restroom facilities. The document is dated September 2026 and identifies key mechanical components including an existing terminal unit (VVR-D-131 with 300 CFM capacity) to remain in place, existing ceiling-mounted fan coil units for server rack cooling, and thermostat relocation requirements. The drawing includes specifications for field verification of existing ductwork and heating water piping sizes and locations prior to construction, rebalancing of supply diffusers to 150 CFM each, and relocation of existing JCI thermostats with extended wiring as required.
The drawing was designed and checked by Brian Butler, P.E. of Arris Consulting located in Portland, Oregon, and submitted for the PDX 2026-513 project. The document serves as construction documentation for mechanical systems coordination within the renovation scope and includes standard graphic scales and revision notation protocols. No specific pricing, budget allocation, funding sources, contract terms, or bidding deadlines are detailed in this technical drawing document.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D14573
OFFICE
D1660
JAND1655
CORR.
D14920
EQUIP
D1650
ELEV
D1658
BREAK
D1656
LOCKERS
D1657
LOCKERS
D1664
WOMENS
D1666
MENS
D1654
MECH
D1652
STAIRS
D1706
OFFICE
D1646
ESC
D1600
IMMIGRATION
D1680
OFFICE
D1675
ISOLATION
D1679
EQUIPMENT
D1672
MENS
D1670
WOMENS
D1687
HOLD
D1686
HOLD
D1683
OFFICE
D1663
OFFICE
D1662
CORR
D1674
HEALTH
D1678
SUPERVISOR
D1676
TOILET
D1700
SECOND CHECK
D1702
INTERVIEW
D1704
INTERVIEW
D1605
OFFICE
D1671
CORR
D1653
STAIRS
D1682
CORR
DN
UP
D
D
EXISTING TERMINAL UNIT
VVR-D-131 (300 CFM)
TO REMAIN
T
T
12'8'4'2'0'
SCALE: IN FEET
N
20"ø
6"ø 10"ø
DA
DB
DC
DD
DE
D46D47D48D49D50
M A
T C
H L
IN
E
S E
E S
H E
E T
M
.0
ADDITIVE
ALTERNATE #2
A R R I S 2622 SE 25th Ave Ste #A Portland, OR 97202
Brian Butler, P.E.
brian@arris-consulting.com 503-309-6335
C O N S U L T I N G
/4
/2
G R
A P
H
IC
S C
A L E
-F O
R R
E F
E R
E N
C E
O N
L Y
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".
SUBMITTED BY
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
DRAWING NO.
TYPE
DISC. SHT. NO.
DESIGN NUMBER PROJECT NUMBER
NO. DATE BY REVISIONS
A
PP
C A
N Y
O U
S E
E T
H E
A
IR
P L A
N E
S
T
H E
A D
J A
C E
N T
S A
M P
L E
S S
H O
W T
H R
E E
D
IF
F E
R E
N T
L E
V E
L S
O F
S H
A D
IN
G
S
E T
T
IN
G S
F O
R V
IE
W
IN
G
A N
D P
R
IN
T
IN
G D
R A
W
IN
G C
O N
T E
N T
A R
E O
P T
IM
IZ
E D
W H
E N
A L L T
H R
E E
P L A
N E
S A
R E
V
IS
IB
L E
T
H
IS
G U
ID
A
N C
E I S
P R
O V
ID
E
D F
O R
R E
F E
R E
N C
E O
N L Y b la c k g ra y g ra y lig h t d a rk
NO. DATE BY REVISIONS
A
PP
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
DATE
SHEET NO. TYPE
DESIGN NUMBER PROJECT NUMBER
D R
A W
IN
G
S C
A L E
I S
R E
D U
C E
D
W H
E N
S H
E E
T S
IZ
E
I S x
9/8/2026 8:49:00 AM Autodesk Docs://PDX Airport CBP Improvements/PDX Airport CBP Improvements - Arris_R26.rvt
DEPLANING LEVEL - SECTOR 01 - FLOOR PLAN - MECHANICAL
PORTLAND INTERNATIONAL AIRPORT
M2.01
SEPTEMBER 2026
A. CRAIG
B. BUTLER
B. BUTLER
JAY OSTLUND
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS PHASE 2
PDX 2026-513
39 CD
1031462025D042
NTS1/8" = 1'-0"
DEPLANING LEVEL - SECTOR 01 - FLOOR PLAN - MECHANICAL
N
KEY PLAN
SCALE: N.T.S
KEY NOTE(S) :#
2 FIELD VERIFY EXISTING DUCT & HEATING WATER
PIPING SIZES AND LOCATIONS PRIOR TO
BEGINNING WORK, TYPICAL.
3 EXISTING CEILING MOUNTED FAN COIL UNIT
(CARRIER) PROVIDING COOLING FOR SERVER
RACK TO REMAIN.
1 RELOCATE EXISTING JCI T-STAT CONTROLLING
VVR-D-131 TO THIS LOCATION AND EXTEND
WIRING AS REQUIRED.
4 EXISTING CARRIER T-STAT ON WALL TO REMAIN.
5 REBALANCE EXISTING AND RELOCATED SUPPLY
DIFFUSERS TO 150 CFM EACH.
BrianButler Image
BrianButler Text Box 12-31-27
| 2026-09-08T09:15:00-0700 | |
| Brian Butler |
File details come from the government source that posted it. Updated .