PDX 2026-513 (29) A9.03.pdf

PDF 347 KB Posted

Attached to
Portland International Airport Customs and Border Protection Improvements - Phase 2
Solicitation number
145968
Issued by
Multnomah County, Oregon

About this file

This is a Door Schedule technical drawing for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon, dated September 2026. The document provides detailed specifications for twenty-one doors across multiple facility areas including offices, immigration processing areas, baggage claim, mechanical rooms, corridors, and vestibules. The doors range in size from 3'-0" to 6'-0" in width and are uniformly 7'-0" in height, with specifications organized by door type (designations A through F) and assigned hardware groups (HW-01 through HW-05). Each door entry references corresponding architectural sheets for frame details and includes information regarding material composition, interior and exterior finishes, and installation notes.

The door specifications indicate a mix of new steel solid core doors with high-performance or painted finishes and existing hollow metal and aluminum storefront doors being retrofitted with selected new hardware. Material designations include HPC (High Performance Coating) and PT (Painted Finish) options for interior and exterior surfaces, with specific details referenced on sheets A8.02. Installation requirements specify that relite glazing be integral with doors rather than retrofit systems, with glazing stops installed on the secure side. The project represents an additive alternate #2 modification to the construction documents, with the drawing generated on August 27, 2026, and prepared by design professionals Jay Ostlund, D. Calem, and A. Laskey under project number PDX 2026-513.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-513 (06) A0.01.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3'-0"

A

7' -0

3'-0"

B

7' -0

6'-0"

C

7' -0

3'-6"

D

7' -0

6'-0"

E

7' -0

3'-6"

F

7' -0

8/27/2026 lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E-

FO

R R

EF

ER

EN

C

E O

N

LY

gr ay

2:02:47 PM x:\pdx cbp 2026\d-drawings\00 current\a9.01.dwg DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

1/ 4"

1/

2" 1"

BY REVISIONS APP

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

NO.DATE BY REVISIONS APPNO.

TYPE:

DISC. SHT. NO.

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

A

LL

T H

R

EE

P

LA

N

ES

A R

E

VI

SI

BL

E.

T

H

IS

G U

ID

AN

C E

IS

P

R O

VI

D

ED

F

O R

R

EF

ER

EN

C E

O N

LY

D R

AW

IN

G S

C

AL

E

IS

R E

D U

C E

D

0% W

H

EN

S H

EE

T

SI

ZE

IS

1" x

7"

DATE

PORTLAND INTERNATIONAL AIRPORT

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2

DOOR SCHEDULE

JAY OSTLUND

D. CALEM

A. LASKEY

D. CALEM

SEPTEMBER 2026

29 CD

PDX 2026-513 A9.032025D042 103146

DOOR SCHEDULE

DOOR ROOM NAME SHEET OPG WIDTH

AND HEIGHT TYPE

DOOR FRAME DETAILS HARDWARE

GROUP NOTES

MATERIAL CORE INT. FINISH EXT. FINISH MATERIAL INT. FINISH EXT. FINISH HEAD JAMB THRESHOLD

D14177 OFFICE A5.02 3'-0" x 7'-0" A STEEL SOLID HPC-02 HPC-02 STEEL HPC-02 HPC-02 1 / A8.02 1 / A8.02 1 / A8.02 HW-01 1 D14573 OFFICE A5.01 3'-0" x 7'-0" B STEEL SOLID PT-02 PT-02 STEEL PT-02 PT-02 1 / A8.02 1 / A8.02 1 / A8.02 HW-02 2 D1600A IMMIGRATION A2.01 6'-0" x 7'-0" C (E) (E) (E) HPC-03 (E) (E) HPC-04 (E) (E) (E) HW-03 3, 5 D1600B IMMIGRATION A2.01 6'-0" x 7'-0" C (E) (E) (E) HPC-03 (E) (E) HPC-04 (E) (E) (E) HW-03 3, 5

D1600C IMMIGRATION A2.01 3'-0" x 7'-0" B (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) HW-04 3 D1600D IMMIGRATION A2.01 3'-0" x 7'-0" B (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) HW-04 3 D1600E IMMIGRATION A2.01 3'-0" x 7'-0" B (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) HW-04 3 D1600F IMMIGRATION A5.01 6'-0" x 7'-0" B (E) (E) (E) HPC-03 (E) (E) HPC-04 (E) (E) (E) HW-03 3, 5 D1603A BAGGAGE CLAIM A5.02 6'-0" x 7'-0" C (E) (E) (E) HPC-03 (E) (E) HPC-04 (E) (E) (E) HW-03 3, 5 D1603B BAGGAGE CLAIM A2.02 6'-0" x 7'-0" C (E) (E) (E) HPC-03 (E) (E) HPC-04 (E) (E) (E) HW-03 3, 5

D1603C BAGGAGE CLAIM A2.02 3'-0" x 7'-0" B (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) HW-04 3 D1603D BAGGAGE CLAIM A2.02 3'-0" x 7'-0" B (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) HW-04 3 D1603E BAGGAGE CLAIM A2.02 3'-0" x 7'-0" B (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) HW-04 3 D1604 OFFICE A5.02 3'-0" x 7'-0" B (E) (E) HPC-02 HPC-03 (E) HPC-02 HPC-04 (E) (E) (E) (E) 5

D1618A MECHANICAL A5.03 6'-0" x 7'-0" C STEEL SOLID PT-02 PT-02 STEEL PT-02 PT-02 1 / A8.02 1 / A8.02 1 / A8.02 HW-05 D1619 CORRIDOR A5.03 3'-6" x 7'-0" D (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) HW-04 3 D1641 VESTIBULE A5.03 3'-6" x 7'-0" E (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) HW-04 4

D1643A VESTIBULE A5.03 6'-0" x 7'-0" F (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) HW-03 4 D1643B VESTIBULE A5.03 6'-0" x 7'-0" F (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) HW-03 4 D1655 CORRIDOR A2.01 3'-0" x 7'-0" B (E) (E) (E) HPC-02 (E) (E) HPC-04 (E) (E) (E) (E) 5 D1662 CORRIDOR A2.01 3'-0" x 7'-0" B (E) (E) HPC-02 HPC-03 (E) HPC-02 HPC-04 (E) (E) (E) (E) 5

SCALE:

DOOR SCHEDULE

N.T.S.1

NOTE(S):

1. RELITE SHALL BE INTEGRAL WITH DOOR, AND NOT A RETROFIT RELITE SYSTEM. INSTALL GLAZING STOPS ON SECURE SIDE OF DOOR.

2. INSTALL OPENER ON PULL SIDE OF DOOR.

3. EXISTING HOLLOW METAL DOOR AND FRAME WITH SELECT NEW HARDWARE.

4. EXISTING ALUMINUM STOREFRONT DOOR AND FRAME WITH SELECT NEW HARDWARE.

5. FULLY PAINT EXTERIOR OF DOOR AND FRAME, INCLUDING ALL EXISTING AND NEW COMPONENTS

ABBREVIATIONS:

ALUM - ALUMINUM

GALV. - GALVANIZED

HW - HARDWARE GROUP

HPC - HIGH PERFORMANCE COATING

PT - PAINTED FINISH

SCALE:

DOOR TYPES

N.T.S.2

ADDITIVE

ALTERNATE

#2

Sheets and Views
A9.03
2026-08-27T14:16:27-0700
Dave Calem

File details come from the government source that posted it. Updated .