PDX 2026-513 (72) T2.02.pdf
PDF 408 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is an architectural floor plan drawing for the Portland International Airport Customs and Border Protection (CBP) Improvements - Phase 2 project, prepared for the Port of Portland in Oregon. The document is a technology floor plan for the deplaning level, sector 02, showing the layout of security and operational spaces including office areas, baggage claim, customs inspection, search areas, stairs, and support facilities. The drawing specifies technology infrastructure requirements, including the relocation of an existing AXIS Q6055 PTZ camera to a ceiling-mounted location with new CAT6A cabling routed back to the IDF room D1605, coordinate existing monitors to new cable connections, and coordination with Port IT for final field-of-view verification. The plan includes 33 key notes referencing camera locations, cabling specifications, and contractor responsibilities for verification and as-built documentation. The drawing was designed by M. Henning, drawn by E. Close, checked by B. Perry, and digitally signed by Benjamin Earl Perry (Oregon Professional Engineer #86683) on September 8, 2026.
The document does not contain pricing information, bid due dates, award dates, contract terms, or procurement set-asides. This is a design drawing intended for permit review and construction guidance, prepared by Landis Consulting (contact: Salem, 503-584-1576) as part of the Phase 2 CBP improvements project at Portland International Airport. The drawing scale is 1/8" = 1'-0" and is referenced on sheet T2.02 with cross-references to adjacent sheets T2.01 and T2.03 for complete project documentation.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D1706
OFFICE
D1708
LAB
D1709
SEARCH
D1710
KEN
D1636
ESC
D1638
STAIRS
D1644
OFFICE
D1614
MENS
D1616
WOMENS
D1613
SEARCH
D1615
SEARCHD1612
VESTIBULE
D1624
COMM
D1622
ELEC
D1601
CASHIER
D1640
STAIRS
D1707
CORR
D1603
BAGGAGE CLAIM
D1642
LAN
D1604
OFFICE
D1602
OFFICE
D1611
LOCKERS
D1610
OFFICE
D1608
SUPERVISOR
D1603
CUSTOMS
D1606
OFFICE
D14177
OFFICE
J J
JJ
21.A,21.B
22.A,22.B 22.C,22.D
23.A,23.B 23.C,23.D
28.A
(RD)
D45 D44 D43 D42 D41 D40 D39
DE
DD
DC
DB
DA
SCALE:
DEPLANING LEVEL - SECTOR 02 - FLOOR PLAN - TECHNOLOGY
1/8" = 1'-0"1
9/8/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
1:42:44 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\t2.02 deplaning level - sector 02 - floor plan - technology.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
KEY PLAN
SCALE: N.T.S.
N
THE AREA BELOW IS TO BE LEFT BLANK - FOR
USE BY CITY FOR PERMIT REVIEW STAMP ONLY-
Salem 503-584-1576 www.landisconsulting.com
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
PDX 2026-5132025D042 103146
M. HENNING
E. CLOSE
B. PERRY
SEPTEMBER 2026
JAY OSTLUND
CD
PDERETSI
GER LA
NOI
SSEFOR
OREGON
86683
NIG
N
E R
EE
8 , 2
M A Y
PERRY
B
EN
JAMI N
E.
EXPIRES: 12-31-2026
Digitally Signed
DEPLANING LEVEL - SECTOR 02 - FLOOR PLAN - TECHNOLOGY
T2.02
N
SCALE: IN FEET
0' 4' 8' 16' 24'
C O
N
TI
N U
ED
O
N S
H
EE
T T2
.0
C O
N
TI
N U
ED
O
N S
H
EE
T T2
.0
C O
N
TIN
U
ED
O N
SH
EET T2.01
C O
N
TIN
U
ED
O N
SH
EET T2.01
#KEY NOTE(S) :
1. RELOCATED EXISTING CAMERA MOUNTED TO
CEILING AS SHOWN. EXISTING CAMERA IS AXIS
Q6055 PTZ CAMERA. COORDINATE EXACT LOCATION
WITH ARCHITECTURAL DRAWINGS AND THE PORT
PRIOR TO ROUGH-IN. PROVIDE NEW CAT6A CABLING
BACK TO IDF ROOM D1605. COORDINATE FINAL,
INSTALLED FIELD-OF-VIEWS WITH PORT IT.
2. PROVIDE NEW CAT6A CABLING BACK TO IDF ROOM
D1605. UTILIZE EXISTING CONDUIT. CONNECT
EXISTING MONITOR TO NEW CABLE.
3. CONTRACTOR TO VERIFY CAMERA ID NUMBER AND
PROVIDE ON AS-BUILTS.
(E)(E)
(E)(E)
30.A
32.A
31.A
33.A
| 2026-09-08T14:31:14-0700 | |
| Digitally Signed | |
| Benjamin Earl Perry |
File details come from the government source that posted it. Updated .