PDX 2026-513 (62) E8.03.pdf
PDF 869 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is an electrical panel schedule drawing for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon. The document is a technical drawing (Sheet E8.03) dated September 8, 2026, prepared by DBC Architecture Inc. and submitted by Landis Consulting. The drawing provides detailed specifications for Panel 4D1A electrical installation, including panel schedules and electrical specifications necessary for the project's construction phase. The document serves as a reference guide for contractors and permitting authorities, with the drawing scale optimized for viewing and printing when all referenced planes are visible. The project involves improvements to Portland International Airport's Customs and Border Protection facilities as part of a phased construction initiative.
The drawing was prepared under the direction of M. Henning and E. Close, with B. Perry serving as the designer and drafter. The document includes a digital signature from Benjamin Earl Perry, a licensed professional engineer in Oregon (License No. 86683, expiring December 31, 2026), and was approved by Jay Ostlund. This technical drawing is intended for permit review and construction purposes, with the area below the title block reserved for City of Portland stamp and review documentation. The document confirms that the drawing content is current as of the submission date and serves as part of the comprehensive design documentation for the airport improvement project.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/8/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
1:40:31 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\e8.03 panel schedule - panel 4d1a - electrical.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
THE AREA BELOW IS TO BE LEFT BLANK - FOR
USE BY CITY FOR PERMIT REVIEW STAMP ONLY-
Salem 503-584-1576 www.landisconsulting.com
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
PDX 2026-5132025D042 103146
M. HENNING
E. CLOSE
B. PERRY
SEPTEMBER 2026
JAY OSTLUND
CD
PDERETSI
GER LA
NOI
SSEFOR
OREGON
86683
NIG
N
E R
EE
8 , 2
M A Y
PERRY
B
EN
JAMI N
E.
EXPIRES: 12-31-2026
Digitally Signed
PANEL SCHEDULE - PANEL 4D1A - ELECTRICAL
E8.03
| 2026-09-08T14:31:23-0700 | |
| Digitally Signed | |
| Benjamin Earl Perry |
File details come from the government source that posted it. Updated .