PDX 2026-513 (42) M5.01.pdf

PDF 205 KB Posted

Attached to
Portland International Airport Customs and Border Protection Improvements - Phase 2
Solicitation number
145968
Issued by
Multnomah County, Oregon

About this file

This is a mechanical design details document prepared by ARRIS Consulting for the Portland International Airport Customs and Border Protection Improvements Phase 2 project in Oregon. The document, dated September 8, 2026, provides technical specifications and installation requirements for HVAC ductwork systems, including terminal units, branch ducts, diffusers, and related mechanical components. The drawings specify detailed construction standards for low-loss branch duct connections, terminal unit installations with reheat coil sections, duct liner requirements, seismic bracing specifications, and flexible duct connections to ceiling diffusers. Installation requirements include minimum straight duct runs equal to four times the inlet diameter, 36-inch clearance requirements for controllers and damper actuators, pressure-independent delta P control valves, drain and vent valves, and compliance with 2005 SMACNA HVAC Duct Construction Standards.

The document establishes critical dimensional and construction parameters for the mechanical installation, including maximum offset angles of 15 degrees for flexible duct connections, minimum 4-foot downstream spacing for first branch ducts, maximum transition angles of 15 to 30 degrees depending on configuration, and minimum 5-foot lined duct requirements. The project is designed by A. Craig and B. Butler under the direction of engineer Brian Butler of ARRIS Consulting, with design number 1031462025D042 and project number PDX 2026-513. The specifications reference supporting floor plan drawings and require contractor compliance with all noted technical requirements for proper HVAC system functionality and code adherence.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-513 (06) A0.01.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TWO-WAY PRESSURE INDEPENDENT

DELTA P CONTROL VALVE

1. INSTALL PIPING COUNTER FLOW TO AIR FLOW.

DRAIN VALVE (3/4")

VENT VALVE

NOTES

AIR

FLOW

HWR

HWS

STRAINER

TEST PORT, TYP.

SHUT-OFF VALVE, TYPICAL

4 FEET MIN.

TERMINAL UNIT

LOW VELOCITY SUPPLY DUCT.

PROVIDE DUCT LINER IN

DISCHARGE DUCTWORK AS

SHOWN ON PLAN DRAWINGS.

TERMINAL UNIT

CONNECTION

DUCTWORK

RUNOUT DUCT - SIZE

AS SCHEDULED

PROVIDE 36" CLEARANCE IN

FRONT OF TU CONTROLLER &

DAMPER ACTUATOR.

NOTES:

INLET

UNIT CONTROLLER

REHEAT COIL SECTION

CONNECTION, TYP

SLIP AND DRIVE CLEAT

1. BRANCH DUCT SIZE TO MATCH UNIT INLET CONNECTION. FOR BRANCH DUCTS OVER FIVE

FEET IN LENGTH, INCREASE BRANCH DUCT ONE SIZE AND PROVIDE TRANSITION

IMMEDIATELY UPSTREAM OF MINIMUM STRAIGHT DUCT RUN.

2. MINIMUM 5'-0" LONG LINED DUCT.

3. MINIMUM STRAIGHT DUCT RUN SHALL BE EQUAL TO 4 TIMES THE INLET DIAMETER OF TERMINAL UNIT.

TRANSITION FITTING, MAX.

15°, WHERE REQUIRED

BRANCH DUCT,

SEE NOTE 1

DISCHARGE LINED DUCT,

SEE NOTE 2

TRANSVERSE AND LONGITUDINAL

SEISMIC BRACING (EACH SIDE)

FIRST BRANCH DUCT

4. FIRST BRANCH DUCT DOWNSTREAM OF TERMINAL MUST BE A MINIMUM OF 4 FEET

DOWNSTEAM OF TERMINAL UNIT.

ATTACH HANGERS AND SEISMIC SUPPORTS

TO STRUCTURE ABOVE PER CODE

REQUIREMENTS

MEDIUM

PRESSURE

DUCT

MIN. STRAIGHT DUCT, SEE NOTE 3 TERMINAL UNIT 5" +/-

4'-0" MINIMUM

1.5 X D

WHETHER SHOW ON THE FLOOR PLAN OR NOT.

1. ALL BRANCH TAKE-OFFS SHALL HAVE A LOW LOSS FITTING

NOTE:

RECTANGULAR TO ROUND

LOW - LOSS FITTING

PRESSURE DUCT SEALER

SCREWS & SEAL WITH MEDIUM

ATTACH WITH SHEET METAL

LOW - LOSS FITTING

RECTANGULAR

RECTANGULAR TO

H

1.5 X W

D

PROVIDE AIR EXTRACTOR WITH

EXTERNAL OPERATING KNOB WHERE

45° BRANCH TAKEOFF CANNOT BE

INSTALLED.

DETAIL NOTES:

1. DUCT LINER NOT SHOWN FOR CLARITY.

2. FOR ADDITIONAL DETAIL, DUCTWORK SHALL BE

CONSTRUCTED PER 2005 SMACNA HVAC DUCT

CONSTRUCTION STANDARDS.

3. DUCT OFFSETS AND TRANSITIONS MAY CONVERT DUCT

PROFILES TO ANY COMBINATION FOR RECTANGULAR,

ROUND OR FLAT OVAL SHAPES.

45° BRANCH SUPPLY

OR RETURN

DUCT OFFSETS

AIR FOIL TURNVANE

ELBOW

RADIUS ELBOW TRANSITION

DUCT TRANSITION

WITH DUCT COIL

INNER

RADIUS = 6"

MIN

TURN

VANES AS

SPECIFIED

1-1/2" W

MIN

MANUAL

BALANCIN

G DAMPER

ACCES

S

DOOR

COI

L

30° MAX

15° MAX.

30° MAX.

OVER 30°

15° MAX

45.00°

W /4

M

IN

30° MAX

15° MAX.

W

PLAN VIEW

LINED SHEET METAL BOOT

SHEET METAL DUCT

CEILING

PLAN VIEW

DUCT SIZE IS THE SAME

AS NECK CONNECTION

OF DIFFUSER

MAX 36" FLEXIBLE DUCT

FLEX DUCT

ELBOW

SUPPORT

CEILING DIFFUSER CEILING

PLAN VIEW

EQUALIZING

DEFLECTOR WHERE

SPECIFIED

RECTANGULAR

SHEET METAL

DUCT

CEILING

PLAN VIEW

LINED SHEET METAL BOOT

SHEET METAL DUCT

CEILING

FLEXIBLE DUCT

MAXIMUM OFFSET IN HORIZONTAL AND VERTICAL

PLANE TO BE 15 DEGREES FOR FLEXIBLE DUCT

CONNECTION TO DIFFUSER BOOT COLLAR.

FASTEN FLEXIBLE DUCT TO SHEET METAL DUCT

PER SPECIFICATIONS.

WIDTH OF

DIFFUSER

NECK

WIDTH OF DIFFUSER NECK

A R R I S 2622 SE 25th Ave Ste #A Portland, OR 97202

Brian Butler, P.E.

brian@arris-consulting.com 503-309-6335

C O N S U L T I N G

/4

/2

G R

A P

H

IC

S C

A L E

-F O

R R

E F

E R

E N

C E

O N

L Y

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".

SUBMITTED BY

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

DRAWING NO.

TYPE

DISC. SHT. NO.

DESIGN NUMBER PROJECT NUMBER

NO. DATE BY REVISIONS

A

PP

C A

N Y

O U

S E

E T

H E

A

IR

P L A

N E

S

T

H E

A D

J A

C E

N T

S A

M P

L E

S S

H O

W T

H R

E E

D

IF

F E

R E

N T

L E

V E

L S

O F

S H

A D

IN

G

S

E T

T

IN

G S

F O

R V

IE

W

IN

G

A N

D P

R

IN

T

IN

G D

R A

W

IN

G C

O N

T E

N T

A R

E O

P T

IM

IZ

E D

W H

E N

A L L T

H R

E E

P L A

N E

S A

R E

V

IS

IB

L E

T

H

IS

G U

ID

A

N C

E I S

P R

O V

ID

E

D F

O R

R E

F E

R E

N C

E O

N L Y b la c k g ra y g ra y lig h t d a rk

NO. DATE BY REVISIONS

A

PP

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

DATE

SHEET NO. TYPE

DESIGN NUMBER PROJECT NUMBER

D R

A W

IN

G

S C

A L E

I S

R E

D U

C E

D

W H

E N

S H

E E

T S

IZ

E

I S x

9/8/2026 9:17:24 AM Autodesk Docs://PDX Airport CBP Improvements/PDX Airport CBP Improvements - Arris_R26.rvt

DETAILS 1 - MECHANICAL

PORTLAND INTERNATIONAL AIRPORT

M5.01

SEPTEMBER 2026

A. CRAIG

B. BUTLER

B. BUTLER

JAY OSTLUND

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS PHASE 2

PDX 2026-513

42 CD

1031462025D042

NTS

TERMINAL UNIT HW COIL PIPING DETAIL

NTS

TERMINAL UNIT

NTS

TERMINAL UNIT DETAIL

NTS

LOW LOSS BRANCH DUCT CONNECTION DETAIL

NTS

DUCT CONSTRUCTION

NTS

DIFFUSER GRILL & REGISTER CONNECTION