PDX 2026-513 (19) A2.13.pdf
PDF 398 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is an architectural drawing—specifically a reflected ceiling plan—for the Portland International Airport Customs and Border Protection (CBP) Improvements Phase 2 project in Oregon. The drawing depicts the deplaning level, Sector 03, and shows the layout of ceiling systems, lighting fixtures, and related components at a scale of 1/8" = 1'-0". The plan identifies various functional spaces including stairs, corridors, elevators, electrical rooms, equipment areas, storage, bag screening, rechecking areas, cashier stations, vestibules, and waiting areas. Key modifications include new linear metal ceilings designed to match existing adjacent finishes, sheet metal soffits, relocated lighting fixtures, new light fixtures integrated into existing linear metal ceilings, new overhead signage, and new CCTV cameras. The drawing specifies that all dimensions are to the face of finish unless otherwise noted, and that new wall finishes shall match existing adjacent wall finishes unless specifically noted otherwise.
The document was prepared by Jay Ostlund (designed by), D. Calem (drawn by and checked by), and A. Laskey, with a submission date of September 2026. The project is identified as PDX 2026-513, with the drawing number A2.13 and design number 2025D042. The drawing is part of construction documents (CD) phase 19 and includes reference to adjacent sheets A2.12 and A2.14, indicating this is one component of a comprehensive design package. The reflected ceiling plan serves as a critical coordination document for construction, establishing heights, material specifications, and fixture locations for the deplaning level improvements.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D1630
STAIRS
D1626
CORR
D1628
ELEV
D1620
ELEC
D1621
CORR
D1005
PASS THRU
D1632
EQUIP
D1691
STOR
D1623
BAG SCREENING
D1634
STOR
D1637
ELEC
D1635
MECH
D1601
CASHIER
D1618
STOR
D1639
WAITING
D1643
VESTIBULE
D1641
VESTIBULE
D1619
CORR
D1633
RECHECK
D1631
STAIRS
DE
DD
DC
DB
DA
D39 D38 D22 D21 D20 D19 D18D23
N
SCALE:
DEPLANING LEVEL - SECTOR 03 - REFLECTED CEILING PLAN
1/8" = 1'-0"1
SCALE: IN FEET
0' 4' 8' 16' 24'
NOTE(S):
1. ALL DIMENSIONS ARE TO FACE OF FINISH
UNLESS NOTED OTHERWISE.
2. ALL NEW WALL FINISHES SHALL MATCH
EXISTING ADJACENT WALL FINISHES UNLESS
NOTED OTHERWISE.
LEGEND:
KEY NOTE(S) :
1. NEW LINEAR METAL CEILING TO MATCH
EXISTING WITH RELOCATED LIGHTING -
ELEVATION TO MATCH EXISTING ADJACENT
CEILING - SEE ELECTRICAL DRAWINGS
2. SHEET METAL SOFFIT - COLOR AND ELEVATION
TO MATCH EXISTING LINEAR METAL CEILING
3. NO CEILING - OPEN TO STRUCTURE ABOVE
4. NEW OVERHEAD SIGNAGE - SEE SIGNAGE
DRAWINGS
5. NEW LIGHT FIXTURES IN EXISTING LINEAR
METAL CEILING - SEE ELECTRICAL DRAWINGS
6. NEW CCTV CAMERA IN EXISTING LOCATION -
SEE TECHNOLOGY DRAWINGS
8/27/2026 lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E-
FO
R R
EF
ER
EN
C
E O
N
LY
gr ay
1:59:34 PM x:\pdx cbp 2026\d-drawings\00 current\a2.11 deplaning rcps.dwg DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
1/ 4"
1/
2" 1"
BY REVISIONS APP
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
NO.DATE BY REVISIONS APPNO.
TYPE:
DISC. SHT. NO.
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
A
LL
T H
R
EE
P
LA
N
ES
A R
E
VI
SI
BL
E.
T
H
IS
G U
ID
AN
C E
IS
P
R O
VI
D
ED
F
O R
R
EF
ER
EN
C E
O N
LY
D R
AW
IN
G S
C
AL
E
IS
R E
D U
C E
D
0% W
H
EN
S H
EE
T
SI
ZE
IS
1" x
7"
DATE
KEY PLAN
SCALE: N.T.S.
N
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
DEPLANING LEVEL - SECTOR 03 - REFLECTED CEILING PLAN
JAY OSTLUND
D. CALEM
A. LASKEY
D. CALEM
SEPTEMBER 2026
19 CD
PDX 2026-513 A2.132025D042 103146
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T A2
.1
EXISTING ITEM TO REMAIN
NEW ITEM
NEW WALL
NEW GYPSUM BOARD CEILING -
HEIGHT TO MATCH EXISTING
NEW A.C.T. CEILING - HEIGHT TO
MATCH EXISTING
NEW LINEAR METAL CEILING -
HEIGHT TO MATCH EXISTING
NEW LIGHT FIXTURE - SEE
ELECTRICAL
5 5 5
AutoCAD SHX Text D6
AutoCAD SHX Text D8
| Sheets and Views |
| A2.13 |
| 2026-08-27T14:19:40-0700 | |
| Dave Calem |
File details come from the government source that posted it. Updated .