PDX 2026-513 (31) S0.02.pdf

PDF 369 KB Posted

Attached to
Portland International Airport Customs and Border Protection Improvements - Phase 2
Solicitation number
145968
Issued by
Multnomah County, Oregon

About this file

This is a structural design drawing for the Portland International Airport Customs and Border Protection Improvements Phase 2 project, prepared by T.M. Rippey Consulting Engineers in Tigard, Oregon. The document is a floor plan drawing dated September 2026, prepared under Design Number 2005D042 and Drawing Number S0.02. The drawing was designed by Jay Ostlund, drawn by R. Turnbaugh, and checked by J. Cavanagh, with final submission by R. Turnbaugh. The document includes structural CAD files and is part of a special inspection program related to the Customs and Border Protection improvements at Portland International Airport. The drawing scale is presented at 1/4" for reference purposes, with guidance for optimal viewing and printing across three different shading planes to ensure visibility of all drawing content.

This drawing represents technical documentation for the Phase 2 infrastructure improvements at Portland International Airport's Customs and Border Protection facilities. The document was completed and submitted on August 28, 2026, as part of the design and construction documentation package. The consulting engineer responsible for the project is T.M. Rippey Consulting Engineers, located at 7650 SW Beveland, Suite 100, Tigard, Oregon 97223. No specific pricing information, contract terms, funding sources, or procurement details are included in this technical drawing document. The file serves as part of the engineering design deliverables required for permit review and construction purposes.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-513 (06) A0.01.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8/26/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

THE AREA BELOW IS TO BE LEFT BLANK - FOR

USE BY CITY FOR PERMIT REVIEW STAMP ONLY-

11:15:50 AM JCAVANAGH p:\2026 projects\26105 - dbc - pop cbp improvements\structural\cad\r-floor_plan.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

CONSULTING ENGINEERS

T.M. RIPPEY

7650 SW Beveland, Suite 100 Tigard, Oregon 97223 Phone: (503) 443-3900

Fax: (503) 443-3700PROJECT #26105

PORTLAND INTERNATIONAL AIRPORT

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS PHASE 2

SPECIAL INSPECTION PROGRAM - STRUCTURAL

JAY OSTLUND

R. TURNBAUGH

J. CAVANAGH

R. TURNBAUGH

SEPTEMBER 2026

31 CD

PDX 2026-513 S0.022005D042 103146

Sheets and Views
S0.02
503-443-3900
2026-08-28T13:04:00-0700
Tigard, Or
Ralph Turnbaugh
I have reviewed this document

File details come from the government source that posted it. Updated .