PDX 2026-513 (49) E1.11.pdf

PDF 478 KB Posted

Attached to
Portland International Airport Customs and Border Protection Improvements - Phase 2
Solicitation number
145968
Issued by
Multnomah County, Oregon

About this file

This is an electrical demolition reflected ceiling plan for the Deplaning Level - Sector 01 at Portland International Airport's Customs and Border Protection (CBP) Improvements - Phase 2 project in Oregon. The drawing, dated September 2026, details the removal of existing lighting fixtures, conduit, and conductors throughout multiple rooms and areas including offices, holding rooms, restrooms, corridors, stairs, equipment rooms, and the immigration processing area (Room D1600 with 10,328 square feet). The plan specifies three key notes: removal of existing lighting from room switch legs with new switch wiring shown on drawing E2.11, removal of existing light fixtures while retaining existing conduit and conductors for reuse, and removal of lighting for lighted signs with flexible conduit and conductors removed to the nearest junction box while maintaining electrical continuity. The contractor is required to trace and identify all lighting branch circuits from as-built drawings, verify circuits against record drawings, and provide red line markups on contractor as-built drawings. Multiple electrical panels are identified for reference (Panels 2D1D, 2D1B, 4D1B, and E4D1B/E2D1B), with the demolition work continuing on subsequent sheet E1.12.

The drawing was prepared by M. Henning (designer), E. Close (drawn by), and B. Perry (checked by) under design number 2025D042 and project number 103146, with scale at 1/8" = 1'-0". This reflects ceiling plan is part of additive alternate #2 and was digitally signed on September 8, 2026. The document was prepared by DBC Architecture Inc. and submitted by Landis Consulting (503-584-1576, www.landisconsulting.com) in coordination with Salem, Oregon. The drawing includes a key plan and graphic scale reference for optimal viewing and printing when all three shading planes are visible.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-513 (06) A0.01.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D1678

FPR

SUPERVISOR

D1679

FPR

EQUIPMENT

D1686

FPR

HOLD RM

D1687

FPR

HOLD RM

D1683

FPR

OFFICE

D1663

FPR

OFFICE

D1658

FPR

LUNCH ROOM

D1656

FTO

LOCKERS

D1664

FTO

WOMENS

D1662

4-AOM

VAC

85D1657

FTO

LOCKERS

D1666

FTO

MENS

D1654

PMB

MECH

D1653

FPU

STAIRS

D1670

FTO

WOMENS

D1660

PMB

EQUIP

D1655

GPA

CORRIDOR

D1652

GPM

STAIRS

D1650

GPM

D EL11

D1674

FPR

HEALTH

D1675

FPR

ISOLATION

D1676

FTO

TOILET

54D1671

FPR

CORR

D1672

FTO

MENS

D1646

FPU

DEL11

D1702

FPR

INTERVIEW

D1704

FPR

INTERVIEW

D1706

FPR

OFFICE

D1682

FPR

CORR

D1680

FPR

OFFICE

D1700

FPU

SECOND CHECK

D1600

FCP

IMMIGRATION

10328

D1605

FPR

PCC

D1660

JAND1655

CORR.

D14920

EQUIP

D1650

ELEV

D1658

BREAK

D1656

LOCKERS

D1657

LOCKERS

D1664

WOMENS

D1666

MENS

D1654

MECH

D1652

STAIRS

D1706

OFFICE

D1646

ESC

�0�� �0�

D1655

CORRIDOR

D1654

MECH

D1653

STAIRS

D1662

CORRIDOR

D1671

CORRIDOR

D1663

EXERCISE

D1683

CONF ROOM

D1687

HOLD RM

D1686

HOLD RM

D1670

WOMENS

D1672

MENS

D1660

JANITOR

D1650

ELEVATOR

D1674

OFFICE

D1678

OFFICE

D1675

ISOLATION

D1679

EQUIPMENT

D1676

TOILET

D1658

LUNCH RM

D1656

LOCKERS

D1657

LOCKERS

D1666

MENS

D1664

WOMENS

D1646

ESCALATOR

D14920

EQUIP

D

O

FF

IC

E D

O

FF

IC

E

D

IM

M

IG

R

AT

IO

N

D

BA

G G

AG

E

C

LA

IM

D1652

STAIRS

D14573

OFFICE

(D)

(D)

(D)

(D)

(D) (D)

(D)(D) (D)

(D) (D) (D)

(D)(D)

(D)

(D)

(D)

(D)

(D)

(D)

(D) (D)

(D)(D)

(D) (D)

(D)

(D)

(D)

(D)

(D)

(D)

(D)

(D)

(D) (D)

(D)

(D) (D)

(D)(D)

(D) (D)

(D)(D)

(D)

(D)

4D1A:1 4D1A:1

E4D1A:3

4D1A:1

4D1A:14D1A:1

4D1A:14D1A:1

4D1A:1E4D1A:3

4D1A:14D1A:1

4D1A:1E4D1A:3

4D1A:14D1A:1

4D1A:1E4D1A:3

4D1A:14D1A:1

4D1A:14D1A:1

4D1A:1E4D1A:3

4D1A:14D1A:1

D50 D49 D48 D47 D46

DE

DD

DC

DB

DA

9/8/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:37:31 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\3392601-e1.11 deplaning level - sector 01 - electrical demolition floor plan.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

KEY PLAN

SCALE: N.T.S.

N

THE AREA BELOW IS TO BE LEFT BLANK - FOR

USE BY CITY FOR PERMIT REVIEW STAMP ONLY-

Salem 503-584-1576 www.landisconsulting.com

PORTLAND INTERNATIONAL AIRPORT

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2

PDX 2026-5132025D042 103146

M. HENNING

E. CLOSE

B. PERRY

SEPTEMBER 2026

JAY OSTLUND

CD

PDERETSI

GER LA

NOI

SSEFOR

OREGON

86683

NIG

N

E R

EE

8 , 2

M A Y

PERRY

B

EN

JAMI N

E.

EXPIRES: 12-31-2026

Digitally Signed

DEPLANING LEVEL - SECTOR 01 - DEMOLITION REFLECTED

CEILING PLAN - ELECTRICAL

E1.11

N

SCALE:

DEPLANING LEVEL - SECTOR 01 - DEMOLITION REFLECTED CEILING PLAN - ELECTRICAL

1/8" = 1'-0"1

SCALE: IN FEET

0' 4' 8' 16' 24'

(E)

(E)

(E)

(E)

#KEY NOTE(S) :

1. REMOVE EXISTING LIGHTING FROM ROOM SWITCH

LEG. NEW SWITCH WIRING SHOWN ON E2.11.

2. REMOVE EXISTING LIGHT FIXTURE AS SHOWN.

EXISTING CONDUIT AND CONDUCTORS TO REMAIN

FOR RE-USE.

3. REMOVE LIGHT FOR LIGHTED SIGN. REMOVE

FLEXIBLE CONDUIT AND CONDUCTORS TO

NEAREST JUNCTION BOX. MAINTAIN ELECTRICAL

CONTINUITY FOR ALL EXISTING DEVICES ON THE

CIRCUIT. EXACT CIRCUIT IS UNKNOWN.

CONTRACTOR TO TRACE AND IDENTIFY PANEL

AND CIRCUIT ON RECORD DRAWINGS.

NOTE:

1. EXISTING LIGHTING BRANCH CIRCUITS ARE FROM

AS-BUILT DRAWINGS. CONTRACTOR TO TRACE

LIGHTING BRANCH CIRCUITS FOR VERIFICATION

AND PROVIDE RED LINE MARKUPS FOR THESE

CIRCUITS ON THE CONTRACTOR AS-BUILT

DRAWINGS.

(E) PANEL 2D1D

(E) PANEL 2D1B

(E) PANEL 4D1B

(E) PANEL E4D1B

(E) PANEL E2D1B

C O

N

TI

N U

ED

O

N S

H

EE

T E1

.1

C O

N

TI

N U

ED

O

N S

H

EE

T E1

.1

3 2

TYPICAL TYPICAL

TYPICAL

ADDITIVE ALTERNATE #2

2026-09-08T14:31:49-0700
Digitally Signed
Benjamin Earl Perry

File details come from the government source that posted it. Updated .