PDX 2026-513 (60) E8.01.pdf
PDF 901 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is an electrical panel schedule drawing for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon. The document is a technical design drawing (Sheet E8.01) dated September 8, 2026, prepared by DBC Architecture Inc. and submitted by Landis Consulting. The drawing depicts Panel 2UP1D-44DA electrical specifications and includes a panel schedule with graphic representations showing three different shading levels optimized for viewing and printing. The design was created by M. Henning, drawn by E. Close, and checked by B. Perry. The document includes standard engineering drawing conventions, scale references (reduced 50% for 11" x 17" sheet size), and revision blocks for tracking design modifications and approvals.
The drawing was digitally signed by Benjamin Earl Perry, a registered professional engineer in Oregon (License #86683, expiring December 31, 2026), on September 8, 2026 at 2:31 p.m. This technical documentation serves as part of the design package for the customs and border protection facility improvements at Portland International Airport Phase 2. The drawing is intended for permit review and city approval processes, with a designated blank area on the document reserved for official city stamp and permit review documentation. Contact information for Landis Consulting is provided at 503-584-1576 and www.landisconsulting.com for additional project information.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/8/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
1:39:53 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\e8.01 panel schedule - panel 2up1d-44da - electrical.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
THE AREA BELOW IS TO BE LEFT BLANK - FOR
USE BY CITY FOR PERMIT REVIEW STAMP ONLY-
Salem 503-584-1576 www.landisconsulting.com
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
PDX 2026-5132025D042 103146
M. HENNING
E. CLOSE
B. PERRY
SEPTEMBER 2026
JAY OSTLUND
CD
PDERETSI
GER LA
NOI
SSEFOR
OREGON
86683
NIG
N
E R
EE
8 , 2
M A Y
PERRY
B
EN
JAMI N
E.
EXPIRES: 12-31-2026
Digitally Signed
PANEL SCHEDULE - PANEL 2UP1D-44DA - ELECTRICAL
E8.01
| 2026-09-08T14:31:17-0700 | |
| Digitally Signed | |
| Benjamin Earl Perry |
File details come from the government source that posted it. Updated .