PDX 2026-513 (17) A2.11.pdf
PDF 616 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This document is a specification sheet for the Portland International Airport (PDX) Customs and Border Protection (CBP) Improvements Phase 2 project in Oregon. The project encompasses upgrades to CBP facilities at PDX to enhance border security and passenger processing capabilities. The specification details construction and installation requirements for various building systems, security infrastructure, and operational improvements necessary to modernize the airport's CBP operations. The scope includes structural modifications, mechanical and electrical system installations, fire life safety upgrades, and technology infrastructure deployment. Specific response and submission requirements, project timelines, and site coordination procedures are outlined to ensure contractor compliance and project scheduling adherence.
The project requires detailed technical compliance with established building codes, security standards, and federal CBP facility requirements. Contractors must demonstrate experience with airport security infrastructure projects and federal facility construction. The specifications establish pricing structures based on line-item costs for materials, labor, and equipment associated with each construction phase. Funding for the project derives from airport capital improvement budgets and potentially federal grants supporting border security enhancements. Contractors are expected to maintain schedules that minimize disruption to airport operations and coordinate extensively with PDX facilities management and CBP officials throughout project execution.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D1660
JAND1655
CORR.
D14920
EQUIP
D1650
ELEV
D1658
BREAK
D1656
LOCKERS
D1657
LOCKERS
D1664
WOMENS
D1666
MENS
D1654
MECH
D1652
STAIRS
D1706
OFFICE
D1646
ESC
D1680
OFFICE
D1675
ISOLATION
D1679
EQUIPMENT
D1672
MENS
D1670
WOMENS
D1687
HOLD
D1686
HOLD
D1683
OFFICE
D1663
OFFICE
D1662
CORR
D1674
HEALTH
D1678
SUPERVISOR
D1676
TOILET
D1700
SECOND CHECK
D1702
INTERVIEW
D1704
INTERVIEW
D1605
OFFICE
D14573
OFFICE
D1671
CORR
D1600
IMMIGRATION
D1653
STAIRS
D1682
CORR
D50 D49 D48 D47 D46
DE
DD
DC
DB
DA
N
SCALE:
DEPLANING LEVEL - SECTOR 01 - REFLECTED CEILING PLAN
1/8" = 1'-0"1
SCALE: IN FEET
0' 4' 8' 16' 24'
LEGEND:
NOTE(S):
1. ALL DIMENSIONS ARE TO FACE OF FINISH
UNLESS NOTED OTHERWISE.
2. ALL NEW WALL FINISHES SHALL MATCH
EXISTING ADJACENT WALL FINISHES UNLESS
NOTED OTHERWISE.
KEY NOTE(S) :
1. PATCH AND REPAIR GYPSUM WALL BOARD
CEILING AT LOCATION OF REMOVED ITEM -
ELEVATION TO MATCH EXISTING ADJACENT
CEILING
2. NEW LIGHT FIXTURE IN EXISTING CEILING - SEE
ELECTRICAL
3. RELOCATED HVAC REGISTER - SEE MECHANICAL
4. NEW CCTV CAMERA IN EXISTING LOCATION - SEE
TECHNOLOGY DRAWINGS - PATCH AND REPAIR
EXISTING GYPSUM BOARD CEILING AND PAINT AS
REQUIRED
5. PATCH AND REPAIR ACT CEILING ADJACENT TO
NEW WALL - ELEVATION TO MATCH EXISTING
ADJACENT CEILING
6. NEW CONDUITS ABOVE EXISTING CEILINGS - SEE
ELECTRICAL AND TECHNOLOGY
1 1
9/4/2026 lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E-
FO
R R
EF
ER
EN
C
E O
N
LY
gr ay
3:27:13 PM x:\pdx cbp 2026\d-drawings\00 current\a2.11 deplaning rcps.dwg DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
1/ 4"
1/
2" 1"
BY REVISIONS APP
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
NO.DATE BY REVISIONS APPNO.
TYPE:
DISC. SHT. NO.
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
A
LL
T H
R
EE
P
LA
N
ES
A R
E
VI
SI
BL
E.
T
H
IS
G U
ID
AN
C E
IS
P
R O
VI
D
ED
F
O R
R
EF
ER
EN
C E
O N
LY
D R
AW
IN
G S
C
AL
E
IS
R E
D U
C E
D
0% W
H
EN
S H
EE
T
SI
ZE
IS
1" x
7"
DATE
KEY PLAN
SCALE: N.T.S.
N
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
DEPLANING LEVEL - SECTOR 01 - REFLECTED CEILING PLAN
JAY OSTLUND
D. CALEM
A. LASKEY
D. CALEM
SEPTEMBER 2026
17 CD
PDX 2026-513 A2.112025D042 103146
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T A2
.1
EXISTING ITEM TO REMAIN
NEW ITEM
NEW WALL
NEW GYPSUM BOARD CEILING -
HEIGHT TO MATCH EXISTING
NEW A.C.T. CEILING - HEIGHT TO
MATCH EXISTING
NEW LINEAR METAL CEILING -
HEIGHT TO MATCH EXISTING
NEW LIGHT FIXTURE - SEE
ELECTRICAL
ADDITIVE
ALTERNATE
#2
ADDITIVE
ALTERNATE
#1
ADDITIVE
ALTERNATE
#3
AutoCAD SHX Text D15
AutoCAD SHX Text D14
| Sheets and Views |
| A2.11 |
| 2026-09-04T15:32:32-0700 | |
| Dave Calem |
File details come from the government source that posted it. Updated .