PDX 2026-513 (09) A1.02.pdf
PDF 424 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is an architectural demolition floor plan for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon. The plan depicts the Deplaning Level - Sector 02 at a scale of 1/8" = 1'-0" and identifies specific demolition work required across multiple airport spaces including offices, laboratories, search areas, restrooms, vestibules, and other functional areas. The drawing includes a legend and key notes specifying four primary demolition tasks: removal of existing hollow metal doors with frames remaining, removal of existing glazing with opening preparation, removal of existing VCT flooring and adhesive with subfloor preparation, and removal of existing carpet and adhesive with subfloor preparation. All dimensions reference the face of finish unless otherwise noted, and all new wall finishes are specified to match existing adjacent wall finishes unless noted otherwise.
The document was designed by Jay Ostlund, drawn by D. Calem, and checked by A. Laskey in September 2026. This drawing serves as part of the construction documentation set for a phased improvements project at Portland International Airport, with the demolition plan providing contractors with specific direction on existing conditions to be removed prior to new work installation. The drawing maintains standard architectural conventions with a graphic scale for reference, match lines to adjacent sheets, and notations regarding optimal viewing and printing parameters for the design documentation.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D1706
OFFICE
D1708
LAB
D1709
SEARCH
D1710
KEN
D1636
ESC
D1638
STAIRS
D1614
MENS
D1616
WOMENS
D1613
SEARCH
D1615
SEARCHD1612
VESTIBULE
D1624
COMM
D1622
ELEC
D1601
CASHIER
D1707
CORR
D1603
BAGGAGE CLAIM
D1604
OFFICE
D1602
OFFICE
D1611
LOCKERS
D1610
OFFICE
D1608
SUPERVISOR
D1603
CUSTOMS
D1606
OFFICE
D14177
OFFICE
D45 D44 D43 D42 D41 D40
DE
DD
DC
DB
DA
N
SCALE:
DEPLANING LEVEL - SECTOR 02 - DEMOLITION FLOOR PLAN
1/8" = 1'-0"1
SCALE: IN FEET
0' 4' 8' 16' 24'
NOTE(S):
1. ALL DIMENSIONS ARE TO FACE OF FINISH
UNLESS NOTED OTHERWISE.
2. ALL NEW WALL FINISHES SHALL MATCH
EXISTING ADJACENT WALL FINISHES UNLESS
NOTED OTHERWISE.
KEY NOTE(S) :
1. REMOVE EXISTING HOLLOW METAL DOOR -
DOOR FRAME TO REMAIN
2. REMOVE EXISTING GLAZING IN EXISTING
OPENING, AND PREPARE OPENING TO RECEIVE
NEW WORK
3. REMOVE EXISTING VCT FLOORING AND
ADHESIVE AND PREPARE SUBFLOOR TO
RECEIVE NEW FLOORING
4. REMOVE EXISTING CARPET AND ADHESIVE AND
PREPARE SUBFLOOR TO RECEIVE NEW
FLOORING
LEGEND:
4 1
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T A1
.0
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T A1
.0
EXISTING ITEM TO REMAIN
ITEM TO BE REMOVED
EXISTING CARPET TO BE REMOVED
EXISTING VCT TO BE REMOVED
8/27/2026 lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E-
FO
R R
EF
ER
EN
C
E O
N
LY
gr ay
1:54:00 PM x:\pdx cbp 2026\d-drawings\00 current\a1.01 deplaning demo plans.dwg DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
1/ 4"
1/
2" 1"
BY REVISIONS APP
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
NO.DATE BY REVISIONS APPNO.
TYPE:
DISC. SHT. NO.
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
A
LL
T H
R
EE
P
LA
N
ES
A R
E
VI
SI
BL
E.
T
H
IS
G U
ID
AN
C E
IS
P
R O
VI
D
ED
F
O R
R
EF
ER
EN
C E
O N
LY
D R
AW
IN
G S
C
AL
E
IS
R E
D U
C E
D
0% W
H
EN
S H
EE
T
SI
ZE
IS
1" x
7"
DATE
KEY PLAN
SCALE: N.T.S.
N
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
DEPLANING LEVEL - SECTOR 02 - DEMOLITION PLAN
JAY OSTLUND
D. CALEM
A. LASKEY
D. CALEM
SEPTEMBER 2026
9 CD
PDX 2026-513 A1.022025D042 103146
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
| Sheets and Views |
| A1.02 |
| 2026-08-27T14:23:55-0700 | |
| Dave Calem |
File details come from the government source that posted it. Updated .