S02_Price Proposal Breakdown.docx

DOCX document 22 KB Posted

Attached to
CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Solicitation number
36C78626R0058
Issued by

About this file

This is a Price Proposal Breakdown template for a federal construction solicitation. The document is formatted as a standardized pricing schedule for the Alabama NC Gravesite Expansion Phase 3 project (Project Number: 927CM3003). The template requires contractors to provide pricing across 34 numbered construction divisions plus miscellaneous divisions, including General Conditions, General Requirements, Existing Conditions/Site Work, Concrete, Masonry, Metals, Wood/Plastics/Composites, Thermal and Moisture Protection/Roofing, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, Utilities, Transportation, and Electrical Power Generation. Contractors must complete line-item pricing for each applicable division, calculate a subtotal, and add separate entries for overhead and profit to arrive at a total proposal price. The template references an RFP number and contractor name fields for completion but does not specify pricing terms, contract type, or award information. This is a standard pricing format template without substantive contract details.

View the file

Other files

File Type Posted
S06_36C78626R0058 Amend. 0003.pdf PDF
S02 Amendement 36C78626R0058 0002.pdf PDF
S02 amendment 2.pdf PDF
S02 Fire Alarm Panel.pdf PDF
S02 12 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_addendum01.pdf PDF
S02 Liquidated Damages 833CM3030_CNNC FCA Corrections CONS.pdf PDF
S02 Amendment 36C78626R0058 0001.pdf PDF
S02 07 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 03 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 04 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1 (1).pdf PDF
S02 833CM3030_CNNC FCA Corrections_CONS_BD SPECIFICATIONS.pdf PDF
S02_Attachment - Standard Form 1413.pdf PDF
S02_Attachment - DOL Payroll Form.pdf PDF
P07 Jessamine Camp Nelson Highway.pdf PDF
P07 Jessamine Camp Nelson Heavy.pdf PDF
S02 10 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
P07 Jessamine Camp Nelson Building.pdf PDF
S02 08 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 06 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 02 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 11 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 2_05212026 1.pdf PDF
S09 09 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 05 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 01 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 Camp Nelson Sol 36C78626R0058 draft 9-14-2026.pdf PDF
S02_Attachment - Davis-Bacon Act Poster.pdf PDF
S02_Attachment - Past Performance Questionnaire.docx DOCX document
S02_Attachment - Project Sample Template.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number: 927CM3003 Alabama NC Gravesite Expansion Phase 3

Price Proposal Breakdown

Price Proposal Breakdown

Contractor:

RFP Number:

Division #
Division
Price
0
General Conditions
1
General Requirements
2
Existing Conditions/Site Work
3
Concrete
4
Masonry
5
Metals
6
Wood, Plastics & Composites
7
Thermal and Moisture Protection/Roofing
8
Openings
9
Finishes
10
Specialties
11
Equipment
12
Furnishings
13
Special Construction
14
Conveying Equipment
21
Fire Suppression
22
Plumbing
23
Heating, Ventilating, & Air Conditioning
25
Integrated Automation
26
Electrical
27
Communications
28
Electronic Safety & Security
31
Earthwork
32
Exterior Improvements
33
Utilities
34
Transportation
48
Electrical Power Generation

Misc

Divisions Subtotal

Overhead

Profit

Total

File details come from the government source that posted it. Updated .