This is a Performance Work Statement (PWS) for Section 26 29 23 – Engine Control and Monitoring for VA Project No. 833CM3030 at Camp Nelson National Cemetery, Kentucky, dated 7-8-2025, at 100% Construction Documents phase (CD2).
The specification requires furnishing and installing a factory-assembled, UL-listed fuel dispensing system controller for use with protected fuel storage tanks. The designated manufacturer is SafeSite, LLC, model SafeSite DSC (Dispensing System Controller), with substitutions permitted per Section 01 25 00. The controller assembly must feature a Type 4X, UL-listed stainless steel enclosure that is weather- and corrosion-resistant with a lockable access door. Required control features include digital fuel dispenser control, Emergency Stop (E-Stop) circuit, motor starter for fuel transfer pump, remote fill interface, dry contact integration for leak detection, tank level and generator control panel monitoring, terminal blocks for field wiring, and system test switch. Electrical specifications call for 120V or 240V operation (to be confirmed with system requirements), circuit protection via circuit breakers or fuses, and pre-wired internal components with field terminals. The controller must include status LED indicators or HMI display and audible and visual alarms for leak detection and overfill. Installation must comply with manufacturer instructions and National Electrical Code requirements, with secure mounting on wall, rack, or concrete pad, coordination with tank monitoring and generator systems, and grounding per NEC and local codes. The manufacturer must demonstrate a minimum five years of experience in fuel dispensing control systems. A one-year manufacturer warranty against defects in materials and workmanship is required, with delivery in original packaging and indoor storage protected from moisture and damage.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Project No. 833CM3030 Camp Nelson National Cemetery, KY
Correct FCA Deficiencies 100% CD2
7-8-2025
ENGINE CONTROL AND MONITORING
SECTION 26 29 23 - 1
SECTION 26 29 23
ENGINE CONTROL AND MONITORING
PART 1 – GENERAL
1.1 SUMMARY
A. This Section includes furnishing and installing a factory-assembled, UL-listed fuel dispensing system controller for use with protected fuel storage tanks..
B. Related Sections:
1. Division 26 – Electrical connections.
2. Section 23 11 13 – Fuel Storage Tanks.
3. Section 26 32 13 – Engine Generators.
4. Division 33 – Fuel Distribution (if applicable).
1.2 SREFERENCES
A. UL 508A – Industrial Control Panels.
B. NEC – National Electrical Code.
C. NFPA 30 – Flammable and Combustible Liquids Code.
D. NFPA 110 – Emergency and Standby Power Systems.
1.3 SUBMITTALS
A. Product Data: Controller functionality, wiring schematics, and connection requirements.
B. Shop Drawings: Panel layout, dimensions, and mounting details.
C. Certifications: UL 508A listing and manufacturer qualifications.
D. Warranty documentation.
1.4 QUALITY ASSURANCE
A. Manufacturer Qualifications: Minimum 5 years experience in fuel dispensing control systems.
B. Products shall be listed and labeled per UL standards.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver controller in manufacturer’s original packaging with identification labels intact.
B. Store indoors, protected from moisture and damage.
1.6 WARRANTY
A. Provide manufacturer’s standard one-year warranty against defects in materials and workmanship.
PART 2 – PRODUCTS
7-8-2025
ENGINE CONTROL AND MONITORING
SECTION 26 29 23 - 2
2.1 MANUFACTURER
A. SafeSite, LLC – SafeSite DSC (Dispensing System Controller).
B. Substitutions: Comply with Section 01 25 00 – Substitution
Procedures.
2.2 CONTROLLER ASSEMBLY
A. Type: Factory-assembled fuel dispensing system controller for outdoor use.
B. Enclosure:
1. Type 4X, UL Listed, stainless steel.
2. Weather- and corrosion-resistant.
3. Lockable access door.
C. Control Features:
1. Digital fuel dispenser control.
2. Emergency Stop (E-Stop) circuit.
3. Motor starter for fuel transfer pump.
4. Remote fill interface.
5. Dry contact integration for leak detection, tank level, and generator control panels.
6. Terminal blocks for field wiring.
7. System test switch.
D. Electrical:
1. Voltage: 120V or 240V (confirm with system requirements).
2. Circuit Protection: Circuit breakers or fuses as required.
3. Wiring: Pre-wired internal components with field terminals.
E. Indicators:
1. Status LED indicators or HMI (if applicable).
2. Audible and visual alarms for leak detection and overfill (if equipped).
PART 3 – EXECUTION
3.1 INSTALLATION
7-8-2025
ENGINE CONTROL AND MONITORING
SECTION 26 29 23 - 3
A. Install controller per manufacturer’s instructions and NEC requirements.
B. Mount enclosure securely on wall, rack, or concrete pad as specified.
C. Coordinate wiring with tank monitoring, generator, and fuel dispensing systems.
D. Provide grounding per NEC and local codes.
3.2 FIELD QUALITY CONTROL
A. Functional testing of controller, pump start/stop, E-Stop, alarms, and sensor inputs.
B. Coordinate with commissioning of fuel storage and generator systems.
3.3 ADJUSTING AND CLEANING
A. Remove temporary labels and protective films.
B. Clean exterior surfaces and test all controls.
C. Provide user training and operation manual.