Amendment 4-GI-104 from 20260107 - 833CM3030 - BID - SET.pdf
PDF 10 MB Posted
- Solicitation number
- 36C78626R0058
About this file
This document is a Phase Plan and General Layout drawing set for a federal construction project at Camp Nelson National Cemetery managed by the National Cemetery Administration.
The project involves correcting Federal Correctional Facility (FCA) Deficiencies and encompasses renovation and construction work across five main buildings: Building A (Public Restroom/Wash Bay), Building B (Equipment Storage Garage), Building C (Historic Brick Stable), Building D (Maintenance Storage Garage), and Building E (Historic Maintenance Garage), with total footprints ranging from 512 to 2,032 square feet. The phased work schedule requires the contractor to: (1) perform historic structure work and finishes on Buildings C and E with anticipated long lead times; (2) complete work on the two pink CMU garages (Buildings B and D); (3) install temporary restroom facilities with water, electric, and sewage provisions while the public restroom building is constructed; (4) execute site concrete work after building completion; and (5) perform optional catch basin replacement, roadway reconstruction, section layer replacement, and materials spoils shed construction. The contractor must provide and maintain temporary facilities including a 56-foot construction trailer with power connection, temporary fuel tanks (250/250 gallon capacity), a 40-foot shipping container for tool storage, a temporary office trailer (pre-engineered modular system, 32'-6" by 20'-5"), sanitary and water tanks, and temporary restroom facilities (1 ADA and 2 standard units, 20' x 8" - 4"). Site work at the flagpole, entrance, and retention pond may be conducted concurrently with any phase. Paving in the contractor trailer area is scheduled as the final task, and temporary facilities must be removed upon project completion.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8"
30"
10"
24"
8"
8"
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X X
X X
X X X
X X X
X X
X X X
X X
X X X
X X
X X
X X X X X X X X X X X X X X X X
X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X X
X X
X X
X
X X
X X
X X
X
BOC
BOC
BOC
X
X
X
X
X
X
X
X
X
X
X
Building "A"
PUBLIC RESTROOM/WASH BAY BUILDING
[CNNew3] 1 Story Concrete Block Structure
Foot Print = 2032 SqFt
FFE
North Side = 942.79' South Side = 940.83'
Building Height = Ceiling Height
North Side First Floor = 8.0' South Side Second Floor = 18.3'
Building "E"
HISTORIC MAINTENANCE GARAGE
[3002] 1 Story Brick Structure Foot Print = 1066 SqFt
FFE = 939.06'
Building Height =
Ceiling Height First Floor = 9.1'
Second Floor = 12.3' Top of Vault = 19.4'
Building "D"
MAINTENANCE STORAGE GARAGE
[3001] 1 Story Concrete Block Structure
Foot Print = 1175 SqFt
FFE = 938.28'
Building Height = Ceiling Height = 15.6'
Building "C"
HISTORIC BRICK STABLE
[HA2]
1 Story Brick Structure Foot Print = 512 SqFt
FFE = 936.97'
Building Height =
Ceiling Height = 12.0' Top of Vault = 19.2'
Building "B"
EQUIPMENT STORAGE GARAGE
[CNNew1] 1 Story Concrete Block Structure
Foot Print = 777 SqFt
FFE = 937.20'
Building Height = Ceiling Height
First Floor = 9.7' Second Floor = 12.5' Top of Vault = 21.1'
D D D D D D D D D D D D D D
Concrete Wall
Concrete Wall
Concrete "D" Curb
Concrete "D" Curb
Concrete
Concrete
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
O L
6' Chain Link Fence
6' Chain Link Fence
6' Chain Link Fence
4' Chain Link Fence
Concrete "D" Curb
X
X
X
X
5' Wrought Iron Fence
P. Tank
CO
CO
D
CO
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
U E
U E
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
UE
UG UG UG UG
New Fuel Storage Tank
(500/500) BY
CONTRACTOR.
E
Concrete "E" Curb
UE
UE
UE
UE
UE
U E
U E
U E
U E
U E
U E
U E
Concrete
Trash Cans
Water Fountain
P. Tank
UW UW UW UW
UW UW UW
UW UW UW UW
UW UW UW UW UW UW UW UW UW UW UW
UW UW UW UW UW UW UW UW UW UW
UW UW UW UW UW
UW
UW
UW
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
U W
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
GA
L
HY
D
PU
M
P
BA
TT
ER
Y
ST
EP
ST
EP
ST
EP
ST
EP
TEMPORARY
RESTROOM TRAILER
1 ADA, 2 STANDARD
20' x 8' - 4"
3.2
3.1
OPTION: STONE WALL REPAIR
AND REPOINT. SEE SEPARATE
DRAWING SET.
56' CONSTRUCTION
TRAILER, POWER
CONNECTION BY
CONTRACTOR
6' Chain Link Fence
NIS
LEECH FIELD
LOW LOW
LO
W
LO
W
LOW
LOW
LOW
LOW
LO
W
SPOILS
AREA
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
EXISTING
GARAGE
IRRIGATION
TANK
EXISTING 6' CHAIN LINK FENCE
PARKING
40' SHIPPING CONTAINER FOR TOOL STORAGE
TEMPORARY FUEL TANKS (250/250)
OPTION: 3-BAY MATERIAL SPOILS SHED.
SEE CIVIL DRAWINGS FOR DETAILS
CONTRACTOR TO PROVIDE TEMPORARY OFFICE TRAILER. SEE 3/GI-104 FOR
NOTES AND GENERAL LAYOUT.
GSA VEHICLE FENCED-IN PARKING
3 SPACES
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
LOW
LIMITS OF WORK; INSTALL CONSTRUCTION
FENCE PER 01 00 02
CONTRACTOR PRIMARY CONSTRUCTION
ACCESS
LIMITS OF UNDERBRUSH REMOVAL
PROPERTY LINE, APPROXIMATE
EXISTING FENCE TO BE REFINISHED
PRE-ENGINEERED/OUTFITTED
MODULAR OFFICE TRAILER
SYSTEM.
SEE ELECTRIC AND TELECOM
DRAWINGS FOR INFORMATION ON
POWER AND IT, CONTRACTOR TO
PROVIDE AND MAINTAIN FOR THE
DURATION OF ITS USE.
CONTRACTOR TO PROVIDE AND
MAINTAIN SANITARY AND
WATER TANKS FOR THE
DURATION OF ITS USE.
ACCESS PANEL ACCESS PANEL
18'-0 12"
RECEPTIONBREAK/CONFERENCE
RE
F.
FILE
STORAGE
AREA
FILE
STORAGE
AREA
13'-3"
PHASE PLAN
GI-104
0 30 60 120 180
LEGEND
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2022, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
Correct FCA Deficiencies
CAMP NELSON NATIONAL CEMETERY
833CM3030
NWG
NOT TO SCALE
KEY
1/16" = 1'-0"1 PHASE PLAN
1/32" = 1'-0"2 SPOILS AREA
PHASING NOTES
· EXISTING FURNITURE/FF&E, TOOLS, LOCKERS,
REFRIGERATOR(S), AND MICROWAVE TO BE RELOCATED TO
TEMPORARY FACILITY BY CONTRACTOR, COORDINATED WITH
CEMETERY STAFF.
1. PERFORM WORK ASSOCIATED WITH HISTORIC STRUCTURES
1.1. HISTORIC FINISHES AND RESTORATIONS WILL INCUR LONG
LEAD TIMES.
1.2. UPON COMPLETION, WORK FORCE CAN UTILIZE RESTROOM
AND LOUNGE FOR TEMPORARY BREAK ROOM.
2. PERFORM WORK ASSOCIATED WITH THE TWO PINK CMU
GARAGES.
3. PERFORM WORK ASSOCIATED WITH PUBLIC RESTROOM BUILDING
3.1. INSTALL TEMPORARY RESTROOMS TRAILER. CONTRACTOR
TO PROVIDE AND MAINTAIN ACCESSIBLE CONNECTION
FROM EXISTING SIDEWALK TO ACCESSIBLE TEMPORARY
RESTROOM.
3.1.1. PROVIDE WATER IN TANK
3.1.2. PROVIDE ELECTRIC CONNECTION(S)
3.1.3. INSTALL TEMPORARY SIGNAGE
3.1.4. PROVIDE AND SERVICE SEWAGE HOLDING TANK
3.2. COMMENCE WORK ON PUBLIC RESTROOM BUILDING.
4. AFTER BUILDINGS ARE COMPLETE, THE SITE CONCRETE WORK
CAN TAKE PLACE
4.1. TEMPORARY STORAGE FOR MATERIALS AT TOP OF DRIVE
AISLE.
5. OPTION: PERFORM SECTION C-C IDENT. LAYER REPLACEMENT.
ROADWAY A & B RECONSTRUCTION.
7. PAVING IN CONTRACTOR TRAILER AREA TO BE DONE LAST.
9. OPTION: CONSTRUCT MATERIALS SPOILS SHED.
· SITE WORK AT FLAG POLE, ENTRANCE, AND RETENTION POND
CAN BE DONE CONCURRENTLY WITH ANY PHASE. SEE SITE
PLAN G-103.
GENERAL LAYOUT 3" = 1' - 0"3 TEMPORARY OFFICE TRAILER
32'-6"
'-5
Bid Set DateDateDate
JANUARY 7, 2026
EPLACEMENT.
6. CONSTRUCT CATCH BASIN REPLACEMENT AND
ROADWAY A & B RECONSTRUCTION.
8. REMOVE TEMPORARY OFFICE TRAILER.
9. OPTION: CONSTRUCT MATERIALS SPOILS SHED.
· SITE WORK AT FLAG POLE, ENTRANCE, AND RETENTION POND
CAN BE DONE CONCURRENTLY WITH ANY PHASE. SEE SITE
PLAN G-103.
8. REMOVE TEMPORARY OFFICE TRAILER.
9. OPTION: CONSTRUCT MATERIALS SPOILS SHED.
· SITE WORK AT FLAG POLE, ENTRANCE, AND RETENTION POND
CAN BE DONE CONCURRENTLY WITH ANY PHASE. SEE SITE
PLAN G-103.
7. PAVING IN CONTRACTOR TRAILER AREA TO BE DONE LAST.
8. REMOVE TEMPORARY OFFICE TRAILER.
9. OPTION: CONSTRUCT MATERIALS SPOILS SHED.
· SITE WORK AT FLAG POLE, ENTRANCE, AND RETENTION POND
CAN BE DONE CONCURRENTLY WITH ANY PHASE. SEE SITE
PLAN G-103.
1. AMENDMENT 4 10/26/26
OE
K 1
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
File details come from the government source that posted it. Updated .