Amendment 4-GI-104 from 20260107 - 833CM3030 - BID - SET.pdf

PDF 10 MB Posted

Attached to
CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Solicitation number
36C78626R0058
Issued by

About this file

This document is a Phase Plan and General Layout drawing set for a federal construction project at Camp Nelson National Cemetery managed by the National Cemetery Administration.

The project involves correcting Federal Correctional Facility (FCA) Deficiencies and encompasses renovation and construction work across five main buildings: Building A (Public Restroom/Wash Bay), Building B (Equipment Storage Garage), Building C (Historic Brick Stable), Building D (Maintenance Storage Garage), and Building E (Historic Maintenance Garage), with total footprints ranging from 512 to 2,032 square feet. The phased work schedule requires the contractor to: (1) perform historic structure work and finishes on Buildings C and E with anticipated long lead times; (2) complete work on the two pink CMU garages (Buildings B and D); (3) install temporary restroom facilities with water, electric, and sewage provisions while the public restroom building is constructed; (4) execute site concrete work after building completion; and (5) perform optional catch basin replacement, roadway reconstruction, section layer replacement, and materials spoils shed construction. The contractor must provide and maintain temporary facilities including a 56-foot construction trailer with power connection, temporary fuel tanks (250/250 gallon capacity), a 40-foot shipping container for tool storage, a temporary office trailer (pre-engineered modular system, 32'-6" by 20'-5"), sanitary and water tanks, and temporary restroom facilities (1 ADA and 2 standard units, 20' x 8" - 4"). Site work at the flagpole, entrance, and retention pond may be conducted concurrently with any phase. Paving in the contractor trailer area is scheduled as the final task, and temporary facilities must be removed upon project completion.

View the file

Other files

File Type Posted
Amendment 4-833CM3030 - CD1 - Historic Hardware.pdf PDF
Amendment 4-833CM3030 - BID - HA-001 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - CU-105 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 23 11 13 Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 037 - CU-105 UTILITY PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - 26 29 23 Engine Control and Monitoring.pdf PDF
Amendment 4-833CM3030 - BID - 028 - CP-105 PAVING PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - SN-104 105 and X-series from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - Historic Pages from 20260422 - 833CM3030 - BID - SET A-004 005 132 133 154 155.pdf PDF
Amendment 4-ConVault Specification with UL 752 Level 8.pdf PDF
Amendment 4-Convault Storage tank 500 GL-telford.pdf PDF
Amendment 4-Convault Brochure 2019 (003).pdf PDF
Amendment 4-833CM3030 - BID - 020 - CG-201 POND AND CRYPT FIELD SECTIONS (R1).pdf PDF
Amendment 4-AE-113 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AE-113 833CM3030 - BID - SET.pdf PDF
S02 36C78626R0058 Amendment 0004.docx DOCX document
Amendment 4-833CM3030 - CD1 - Historic Preservation.pdf PDF
Amendment 4-SED FCA - 04212022_Camp Nelson.pdf PDF
Amendment 4-833CM3030 - BID - AE-110 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 328400 Plant Irrigation_10-31-24.pdf PDF
Amendment 4- 36C78626R0058 FuelForce 814 Advanced Fuel Controller Brochure.pdf PDF
Amendment 4-240524-Camp Nelson National Cemetery - KY- SUE Field Report Deliverable.pdf PDF
Amendment 4-833CM3030 - BID - AE-150 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 07 42 43 Plastic Panel.pdf PDF
Amendment 4-833CM3030 - BID- EQUIPMENT STORAGE GARAGE-AE-141.pdf PDF
Amendment 4-833CM3030 - BID - 231123 NatGas.pdf PDF
Amendment 4- 833CM3030 - BID - 072727 - BARRIER VAPOR.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Expansion Area.pdf PDF
Amendment 4-833CM3030 - BID - 329000 Planting.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Camp Nelson Cemetery.pdf PDF
Amendment 4-833CM3030 - BID - 050 - S-101 STRUCTURAL PLAN (R2).pdf PDF
Amendment 4-Lightning Protection Asmnt Report_Camps Nelson Cemetery.pdf PDF
Amendment 4-Dispensing System Controller-SafeSite DSC with specs.pdf PDF
Amendment 4-833CM3030 - BID - CD-102 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AD-150 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 33 56 10 Temporary Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 052 - S-202 MATERIALS STORAGE BLDG. FRAMING (R2).pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Maintenance Area.pdf PDF
S06_36C78626R0058 Amend. 0003.pdf PDF
S02 Amendement 36C78626R0058 0002.pdf PDF
S02 amendment 2.pdf PDF
S02 Fire Alarm Panel.pdf PDF
S02 Liquidated Damages 833CM3030_CNNC FCA Corrections CONS.pdf PDF
S02 12 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_addendum01.pdf PDF
S02 Amendment 36C78626R0058 0001.pdf PDF
P07 Jessamine Camp Nelson Building.pdf PDF
S02_Price Proposal Breakdown.docx DOCX document
S02_Attachment - Past Performance Questionnaire.docx DOCX document
P07 Jessamine Camp Nelson Highway.pdf PDF
S02_Attachment - DOL Payroll Form.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8"

30"

10"

24"

8"

8"

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X X

X

X X

X X

X

X X

X X

X

X X

X

X X

X X

X

X X

X X

X

X X

X

X X

X X

X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X

X X

X X X

X X

X X X

X X X

X X

X X X

X X

X X X

X X

X X

X X X X X X X X X X X X X X X X

X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X

X

X

X X

X X

X X

X

X X

X X

X X

X

BOC

BOC

BOC

X

X

X

X

X

X

X

X

X

X

X

Building "A"

PUBLIC RESTROOM/WASH BAY BUILDING

[CNNew3] 1 Story Concrete Block Structure

Foot Print = 2032 SqFt

FFE

North Side = 942.79' South Side = 940.83'

Building Height = Ceiling Height

North Side First Floor = 8.0' South Side Second Floor = 18.3'

Building "E"

HISTORIC MAINTENANCE GARAGE

[3002] 1 Story Brick Structure Foot Print = 1066 SqFt

FFE = 939.06'

Building Height =

Ceiling Height First Floor = 9.1'

Second Floor = 12.3' Top of Vault = 19.4'

Building "D"

MAINTENANCE STORAGE GARAGE

[3001] 1 Story Concrete Block Structure

Foot Print = 1175 SqFt

FFE = 938.28'

Building Height = Ceiling Height = 15.6'

Building "C"

HISTORIC BRICK STABLE

[HA2]

1 Story Brick Structure Foot Print = 512 SqFt

FFE = 936.97'

Building Height =

Ceiling Height = 12.0' Top of Vault = 19.2'

Building "B"

EQUIPMENT STORAGE GARAGE

[CNNew1] 1 Story Concrete Block Structure

Foot Print = 777 SqFt

FFE = 937.20'

Building Height = Ceiling Height

First Floor = 9.7' Second Floor = 12.5' Top of Vault = 21.1'

D D D D D D D D D D D D D D

Concrete Wall

Concrete Wall

Concrete "D" Curb

Concrete "D" Curb

Concrete

Concrete

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

6' Chain Link Fence

6' Chain Link Fence

6' Chain Link Fence

4' Chain Link Fence

Concrete "D" Curb

X

X

X

X

5' Wrought Iron Fence

P. Tank

CO

CO

D

CO

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE UE

U E

U E

U E

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE UE

UE

UG UG UG UG

New Fuel Storage Tank

(500/500) BY

CONTRACTOR.

E

Concrete "E" Curb

UE

UE

UE

UE

UE

U E

U E

U E

U E

U E

U E

U E

Concrete

Trash Cans

Water Fountain

P. Tank

UW UW UW UW

UW UW UW

UW UW UW UW

UW UW UW UW UW UW UW UW UW UW UW

UW UW UW UW UW UW UW UW UW UW

UW UW UW UW UW

UW

UW

UW

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

GA

L

HY

D

PU

M

P

BA

TT

ER

Y

ST

EP

ST

EP

ST

EP

ST

EP

TEMPORARY

RESTROOM TRAILER

1 ADA, 2 STANDARD

20' x 8' - 4"

3.2

3.1

OPTION: STONE WALL REPAIR

AND REPOINT. SEE SEPARATE

DRAWING SET.

56' CONSTRUCTION

TRAILER, POWER

CONNECTION BY

CONTRACTOR

6' Chain Link Fence

NIS

LEECH FIELD

LOW LOW

LO

W

LO

W

LOW

LOW

LOW

LOW

LO

W

SPOILS

AREA

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

EXISTING

GARAGE

IRRIGATION

TANK

EXISTING 6' CHAIN LINK FENCE

PARKING

40' SHIPPING CONTAINER FOR TOOL STORAGE

TEMPORARY FUEL TANKS (250/250)

OPTION: 3-BAY MATERIAL SPOILS SHED.

SEE CIVIL DRAWINGS FOR DETAILS

CONTRACTOR TO PROVIDE TEMPORARY OFFICE TRAILER. SEE 3/GI-104 FOR

NOTES AND GENERAL LAYOUT.

GSA VEHICLE FENCED-IN PARKING

3 SPACES

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

LOW

LIMITS OF WORK; INSTALL CONSTRUCTION

FENCE PER 01 00 02

CONTRACTOR PRIMARY CONSTRUCTION

ACCESS

LIMITS OF UNDERBRUSH REMOVAL

PROPERTY LINE, APPROXIMATE

EXISTING FENCE TO BE REFINISHED

PRE-ENGINEERED/OUTFITTED

MODULAR OFFICE TRAILER

SYSTEM.

SEE ELECTRIC AND TELECOM

DRAWINGS FOR INFORMATION ON

POWER AND IT, CONTRACTOR TO

PROVIDE AND MAINTAIN FOR THE

DURATION OF ITS USE.

CONTRACTOR TO PROVIDE AND

MAINTAIN SANITARY AND

WATER TANKS FOR THE

DURATION OF ITS USE.

ACCESS PANEL ACCESS PANEL

18'-0 12"

RECEPTIONBREAK/CONFERENCE

RE

F.

FILE

STORAGE

AREA

FILE

STORAGE

AREA

13'-3"

PHASE PLAN

GI-104

0 30 60 120 180

LEGEND

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2022, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

Correct FCA Deficiencies

CAMP NELSON NATIONAL CEMETERY

833CM3030

NWG

NOT TO SCALE

KEY

1/16" = 1'-0"1 PHASE PLAN

1/32" = 1'-0"2 SPOILS AREA

PHASING NOTES

· EXISTING FURNITURE/FF&E, TOOLS, LOCKERS,

REFRIGERATOR(S), AND MICROWAVE TO BE RELOCATED TO

TEMPORARY FACILITY BY CONTRACTOR, COORDINATED WITH

CEMETERY STAFF.

1. PERFORM WORK ASSOCIATED WITH HISTORIC STRUCTURES

1.1. HISTORIC FINISHES AND RESTORATIONS WILL INCUR LONG

LEAD TIMES.

1.2. UPON COMPLETION, WORK FORCE CAN UTILIZE RESTROOM

AND LOUNGE FOR TEMPORARY BREAK ROOM.

2. PERFORM WORK ASSOCIATED WITH THE TWO PINK CMU

GARAGES.

3. PERFORM WORK ASSOCIATED WITH PUBLIC RESTROOM BUILDING

3.1. INSTALL TEMPORARY RESTROOMS TRAILER. CONTRACTOR

TO PROVIDE AND MAINTAIN ACCESSIBLE CONNECTION

FROM EXISTING SIDEWALK TO ACCESSIBLE TEMPORARY

RESTROOM.

3.1.1. PROVIDE WATER IN TANK

3.1.2. PROVIDE ELECTRIC CONNECTION(S)

3.1.3. INSTALL TEMPORARY SIGNAGE

3.1.4. PROVIDE AND SERVICE SEWAGE HOLDING TANK

3.2. COMMENCE WORK ON PUBLIC RESTROOM BUILDING.

4. AFTER BUILDINGS ARE COMPLETE, THE SITE CONCRETE WORK

CAN TAKE PLACE

4.1. TEMPORARY STORAGE FOR MATERIALS AT TOP OF DRIVE

AISLE.

5. OPTION: PERFORM SECTION C-C IDENT. LAYER REPLACEMENT.

ROADWAY A & B RECONSTRUCTION.

7. PAVING IN CONTRACTOR TRAILER AREA TO BE DONE LAST.

9. OPTION: CONSTRUCT MATERIALS SPOILS SHED.

· SITE WORK AT FLAG POLE, ENTRANCE, AND RETENTION POND

CAN BE DONE CONCURRENTLY WITH ANY PHASE. SEE SITE

PLAN G-103.

GENERAL LAYOUT 3" = 1' - 0"3 TEMPORARY OFFICE TRAILER

32'-6"

'-5

Bid Set DateDateDate

JANUARY 7, 2026

EPLACEMENT.

6. CONSTRUCT CATCH BASIN REPLACEMENT AND

ROADWAY A & B RECONSTRUCTION.

8. REMOVE TEMPORARY OFFICE TRAILER.

9. OPTION: CONSTRUCT MATERIALS SPOILS SHED.

· SITE WORK AT FLAG POLE, ENTRANCE, AND RETENTION POND

CAN BE DONE CONCURRENTLY WITH ANY PHASE. SEE SITE

PLAN G-103.

8. REMOVE TEMPORARY OFFICE TRAILER.

9. OPTION: CONSTRUCT MATERIALS SPOILS SHED.

· SITE WORK AT FLAG POLE, ENTRANCE, AND RETENTION POND

CAN BE DONE CONCURRENTLY WITH ANY PHASE. SEE SITE

PLAN G-103.

7. PAVING IN CONTRACTOR TRAILER AREA TO BE DONE LAST.

8. REMOVE TEMPORARY OFFICE TRAILER.

9. OPTION: CONSTRUCT MATERIALS SPOILS SHED.

· SITE WORK AT FLAG POLE, ENTRANCE, AND RETENTION POND

CAN BE DONE CONCURRENTLY WITH ANY PHASE. SEE SITE

PLAN G-103.

1. AMENDMENT 4 10/26/26

OE

K 1

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text

CONSULTANTS

File details come from the government source that posted it. Updated .