This document is a Hazardous Materials Abatement Notes and Schedules drawing (HA-001) for the Historic Brick Stable Building and Historic Maintenance Garage at Camp Nelson National Cemetery in Kentucky. The drawing serves as a technical specification and planning document for the removal and disposal of asbestos-containing materials (ACM) and lead-based paint (LBP) that will be disturbed during planned renovations.

The project requires a Kentucky-licensed asbestos contractor to remove ACM identified in window frame caulking (9 windows on the historic stable building) and to handle LBP found on window frames, door frames, roof trusses, and garage door trim throughout both buildings. The contractor must comply with EPA regulations (40 CFR Parts 61 and 763), OSHA standards (29 CFR 1910 and 1926), and state requirements including mandatory notification to the Georgia Environmental Protection Division 10 business days prior to abatement activities. The contractor must establish negative pressure enclosures, provide NIOSH and MSHA-approved respiratory protection (minimum half-face respirators with HEPA filters for non-friable removal), perform fit testing, and coordinate with the general contractor on phasing and scheduling. All waste loadout must occur after hours. The contractor must submit proof of asbestos and lead abatement liability insurance at least 30 days before mobilization, provide personnel qualifications for COR approval, submit a notarized narrative hazardous materials work plan with the bid, and include a project-specific health and safety plan. The drawing notes that the contractor assumes full responsibility for all site conditions, concealed materials, and unexpected quantities with no contract modifications considered for such discoveries.

View the file

Other files

File Type Posted
Amendment 4-833CM3030 - CD1 - Historic Hardware.pdf PDF
Amendment 4-833CM3030 - BID - CU-105 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 23 11 13 Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 037 - CU-105 UTILITY PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - 26 29 23 Engine Control and Monitoring.pdf PDF
Amendment 4-833CM3030 - BID - 028 - CP-105 PAVING PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - SN-104 105 and X-series from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - Historic Pages from 20260422 - 833CM3030 - BID - SET A-004 005 132 133 154 155.pdf PDF
Amendment 4-ConVault Specification with UL 752 Level 8.pdf PDF
Amendment 4-Convault Storage tank 500 GL-telford.pdf PDF
Amendment 4-Convault Brochure 2019 (003).pdf PDF
Amendment 4-833CM3030 - BID - 020 - CG-201 POND AND CRYPT FIELD SECTIONS (R1).pdf PDF
Amendment 4-AE-113 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AE-113 833CM3030 - BID - SET.pdf PDF
S02 36C78626R0058 Amendment 0004.docx DOCX document
Amendment 4-833CM3030 - CD1 - Historic Preservation.pdf PDF
Amendment 4-SED FCA - 04212022_Camp Nelson.pdf PDF
Amendment 4-833CM3030 - BID - AE-110 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 328400 Plant Irrigation_10-31-24.pdf PDF
Amendment 4- 36C78626R0058 FuelForce 814 Advanced Fuel Controller Brochure.pdf PDF
Amendment 4-240524-Camp Nelson National Cemetery - KY- SUE Field Report Deliverable.pdf PDF
Amendment 4-833CM3030 - BID - AE-150 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 07 42 43 Plastic Panel.pdf PDF
Amendment 4-833CM3030 - BID- EQUIPMENT STORAGE GARAGE-AE-141.pdf PDF
Amendment 4-GI-104 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 231123 NatGas.pdf PDF
Amendment 4- 833CM3030 - BID - 072727 - BARRIER VAPOR.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Expansion Area.pdf PDF
Amendment 4-833CM3030 - BID - 329000 Planting.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Camp Nelson Cemetery.pdf PDF
Amendment 4-833CM3030 - BID - 050 - S-101 STRUCTURAL PLAN (R2).pdf PDF
Amendment 4-Lightning Protection Asmnt Report_Camps Nelson Cemetery.pdf PDF
Amendment 4-Dispensing System Controller-SafeSite DSC with specs.pdf PDF
Amendment 4-833CM3030 - BID - CD-102 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AD-150 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 33 56 10 Temporary Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 052 - S-202 MATERIALS STORAGE BLDG. FRAMING (R2).pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Maintenance Area.pdf PDF
S06_36C78626R0058 Amend. 0003.pdf PDF
S02 Amendement 36C78626R0058 0002.pdf PDF
S02 amendment 2.pdf PDF
S02 Fire Alarm Panel.pdf PDF
S02 Liquidated Damages 833CM3030_CNNC FCA Corrections CONS.pdf PDF
S02 12 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_addendum01.pdf PDF
S02 Amendment 36C78626R0058 0001.pdf PDF
P07 Jessamine Camp Nelson Building.pdf PDF
S02_Price Proposal Breakdown.docx DOCX document
S02_Attachment - Past Performance Questionnaire.docx DOCX document
P07 Jessamine Camp Nelson Highway.pdf PDF
S02_Attachment - DOL Payroll Form.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAZARDOUS MATERIALS

ABATEMENT NOTES

AND SCHEDULES

HA-001

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2022, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

Correct FCA Deficiencies

CAMP NELSON NATIONAL CEMETERY

833CM3030

NWG

NOT TO SCALE1 GENERAL LEAD AND ASBESTOS ABATEMENT NOTES

GENERAL NOTES:

ASBESTOS NOTES:

ASBESTOS ABATEMENT PHASING:

HISTORIC BRICK STABLE BUILDING

ASBESTOS MATERIALS LOCATIONS QUANTITY

Exterior window frame caulk (original tan caulking)

Window frames on 1st floor & attic (under new caulk in replacement windows) 9 windows

LEAD PAINTED BUILDING

COMPONENTS LOCATIONS PAINT

COLOR

Window frames & trim (int.

and ext.)

Original wood windows (attic and shower room) WHITE

Door frames and trim (int.

and ext.)

Wood entry doors for attic and front sliding doors WHITE

Exterior roof trusses and trim Wood roof trusses and trim boards WHITE

Sliding garage doors Wood doors WHITE

LEAD PAINTED BUILDING

COMPONENTS LOCATIONS PAINT

COLOR

Window frames & trim (int.

and ext.) Wood windows on 1st floor & attic WHITE

Door frames and trim (int.

and ext.) Wood entry doors on 1st floor and attic WHITE

Exterior roof trusses and trim Wood roof trusses and trim boards WHITE

Garage door trim Wood trim WHITE

PAINT CONTAINING LEAD:

GENERAL: THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY AND LIABILITY FOR

COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS PERTAINING

TO WORK PRACTICES, HAULING, DISPOSAL, AND PROTECTION OF WORKERS, VISITORS TO THE

SITE, AND PERSONS OCCUPYING AREAS ADJACENT TO THE SITE.

ASBESTOS WAS FOUND IN THE WINDOW FRAME CAULKING ON THE HISTORIC HORSE STABLE

BUILDING. SEE ARCHITECTURAL DRAWINGS AND SCHEDULE FOR FURTHER DETAILS.

1. THE FOLLOWING REGULATIONS PUBLISHED BY THE ENVIRONMENTAL PROTECTION

AGENCY (EPA):

a. "NATIONAL EMISSIONS STANDARDS FOR HAZARDOUS AIR POLLUTANTS ASBESTOS," 40

CFR PART 61, SUBPART M.

b. "GENERAL PROVISIONS," 40 CFR PART 61, SUBPART A.

c. "GUIDANCE FOR CONTROLLING ASBESTOS-CONTAINING MATERIALS IN BUILDINGS"

JUNE 1985. (EPA # 560/5-85-024).

d. "ASBESTOS-CONTAINING MATERIALS IN SCHOOLS," 40 CFR PART 763, SUBPART E

INCLUDING APPENDICES.

2. THE FOLLOWING REGULATIONS PUBLISHED BY THE U.S. DEPARTMENT OF LABOR, OSHA:

a. “OCCUPATIONAL EXPOSURE TO ASBESTOS, TREMOLITE, ANTHOPHYLLITE, AND

ACTINOLITE; FINAL RULES,” TITLE 29, PART 1910, SECTION 1001 AND PART 1926,

SECTION 1101 OF THE CODE OF FEDERAL REGULATIONS.

b. “RESPIRATORY PROTECTION,” TITLE 29, PART 1910, SECTION 134 OF THE CODE OF

FEDERAL REGULATIONS.

c. CONSTRUCTION INDUSTRY, TITLE 29, PART 1926, OF THE CODE OF FEDERAL

REGULATIONS.

d. “ACCESS TO EMPLOYEE EXPOSURE AND MEDICAL RECORDS,” TITLE 29, PART 1910, SECTION 20 OF THE CODE OF FEDERAL REGULATIONS.

e. “HAZARD COMMUNICATION,” TITLE 29, PART 1926, SECTION 59 OF THE CODE OF

FEDERAL REGULATIONS.

f. “SPECIFICATIONS FOR ACCIDENT PREVENTION SIGNS AND TAGS,” TITLE 29, PART 1910, SECTION 145 OF THE CODE OF FEDERAL REGULATIONS.

3. THE FOLLOWING DOCUMENTS PUBLISHED BY THE AMERICAN NATIONAL STANDARDS

INSTITUTE:

a. "FUNDAMENTALS GOVERNING THE DESIGN AND OPERATION OF LOCAL EXHAUST

SYSTEMS," Z9.2_1979.

b. "AMERICAN NATIONAL STANDARD FOR RESPIRATORY PROTECTION RESPIRATORY USE _

PHYSICAL QUALIFICATIONS FOR PERSONNEL," Z88.6_1984.

c. "PRACTICES FOR RESPIRATORY PROTECTION," Z88.2_1992.

4. THE CONTRACTOR SHALL NOTIFY THE FOLLOWING OFFICES IN WRITING WITHIN THE TIME

FRAME SPECIFIED BY THE NESHAP REGULATIONS PRIOR TO BEGINNING ANY ASBESTOS

REMOVAL OPERATIONS. THE STATE OF GEORGIA REQUIRES A NOTIFICATION BE

SUBMITTED TO GEORGIA EPD 10 BUSINESS DAYS PRIOR TO ANY DEMOLITION,

RENOVATION, OR ASBESTOS ABATEMENT ACTIVITIES.

a. GEORGIA ENVIRONMENTAL PROTECTION DIVISION

ASBESTOS TECHNICAL ASSISTANCE DUTY OFFICER

404) 363-7026

5. MAINTAIN CURRENT LICENSES FOR CONTRACTOR AND ACCREDITATION FOR WORKERS

AND SUPERVISORS AS REQUIRED BY APPLICABLE STATE OR LOCAL JURISDICTIONS FOR

THE REMOVAL, TRANSPORTING, DISPOSAL, OR OTHER REGULATED ACTIVITY RELATIVE TO

THE WORK.

6. PROVIDE WORKERS WITH PERSONALLY ISSUED AND MARKED RESPIRATORY EQUIPMENT

APPROVED BY NIOSH AND MSHA AND SUITABLE FOR THE ASBESTOS EXPOSURE LEVEL IN

THE WORK AREAS ACCORDING TO OSHA STANDARD 29 CFR 1926.1101 AND OTHER

POSSIBLE CONTAMINANTS EMPLOYEES MIGHT BE EXPOSED TO DURING THE PROJECT.

7. PROVIDE RESPIRATORY PROTECTION FROM THE TIME THE FIRST OPERATION INVOLVED IN

THE PROJECT REQUIRES CONTACT WITH ASBESTOS-CONTAINING MATERIALS (INCLUDING

CONSTRUCTION OF DECONTAMINATION UNITS, CONSTRUCTION OF AIRTIGHT

BARRIERS/BARRICADES, AND PLACING OF PLASTIC SHEETING ON WALLS).

8. THE MINIMUM RESPIRATORY PROTECTION FOR THE PROJECT DURING GROSS REMOVAL

OF FRIABLE MATERIALS SHALL BE A HALF-FACE RESPIRATOR WITH REPLACEABLE HEPA

FILTERS, AS LONG AS PERTINENT NEGATIVE EXPOSURE ASSESSMENT CAN BE SUBMITTED

TO THE PROJECT DESIGNER. OTHERWISE, A POWERED AIR PURIFYING RESPIRATORY

(PAPR) MUST BE USED.

9. HALF-FACE RESPIRATORS WITH REPLACEABLE HEPA FILTERS CAN BE USED FOR

NON-FRIABLE REMOVAL.

10. FIT TESTING IS TO BE PERFORMED BY ONE OF THE METHODS LISTED IN THE 29 CFR

1926.1101, APPENDIX C.

11. DO NOT ALLOW THE USE OF SINGLE-USE, DISPOSABLE, OR QUARTER-FACE RESPIRATORS

FOR ANY PURPOSE.

HAZARDOUS MATERIALS GENERAL NOTES:

1. PROJECT INCLUDES HAZARDOUS MATERIALS. REFER TO DEMOLITION DRAWINGS

AND 02 83 33.13 LEAD-BASED PAINT REMOVAL AND HAZARDOUS MATERIALS

SURVEY, JULY 26, 2024, PROJECT MANUAL APPENDIX A FOR SPECIFIC

INFORMATION. COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL

REQUIREMENTS. IF DISCREPANCIES ARISE BETWEEN PLANS, SPECIFICATIONS,

REPORT, AND APPLICABLE REQUIREMENTS, THE MORE CONSERVATIVE AND

STRINGENT REQUIREMENTS SHALL GOVERN.

2. NOT LESS THAN 30 DAYS PRIOR TO MOBILIZATION, PROVIDE CONTRACTOR'S AND

SUBCONTRACTORS' PROOF OF INSURANCE DEMONSTRATING ASBESTOS AND

LEAD-BASED PAINT ABATEMENT LIABILITY INSURANCE AND LIMITS, INCLUDING

PROTECTION AGAINST THIRD-PARTY CLAIMS OF BODILY INJURY AND PROPERTY

DAMAGE FROM ABATEMENT RELATED TO BOTH WORK IN PROGRESS AND

COMPLETED PROJECTS. OBTAIN COR'S APPROVAL PRIOR TO COMMENCEMENT OF

WORK.

3. PROVIDE A LIST OF PROPOSED CONTRACTOR AND SUBCONTRACTOR PERSONNEL

WHO WILL BE INVOLVED WITH AND PERFORM THE WORK. INCLUDE COMPLETE

HAZARDOUS MATERIALS QUALIFICATIONS AND CREDENTIALS. OBTAIN COR'S

APPROVAL PRIOR TO COMMENCEMENT OF WORK.

4. ANY PROPOSED CHANGES TO THE APPROVED SUBCONTRACTORS AND ASSIGNED

PERSONNEL SHALL REQUIRE RESUBMISSION OF THE ABOVE NOT LESS THAN 15

DAYS PRIOR TO EACH SUCH PROPOSED CHANGE. ACCEPTANCE OF ANY SUCH

PROPOSED CHANGE SHALL BE SUBJECT TO COR'S APPROVAL.

5. PROVIDE WITH BID SUBMISSION THE FOLLOWING:

a. NARRATIVE PLAN OF HAZARDOUS MATERIALS WORK, SIGNED AND DATED BY

THE GENERAL CONTRACTOR'S PROJECT MANAGER AND AN OFFICER IN THE

COMPANY, WITNESSED BY A STATE-CERTIFIED NOTARY PUBLIC. INCLUDE

HOW CONTRACTOR WILL HANDLE EACH HAZARDOUS MATERIAL. INCLUDE A

WRITTEN ACKNOWLEDGEMENT THAT CONTRACTOR HAS REVIEWED THE

ENTIRETY OF THE CONTRACT DOCUMENTS, INCLUDING ALL ITEMS RELEVANT

AND POTENTIALLY RELEVANT TO HAZARDOUS MATERIALS, THAT PLAN AND

FEES INCLUDE ALL WORK REQUIRED UNDER THE CONTRACT DOCUMENTS,

WHETHER DIRECTLY OR INDIRECTLY BY REFERENCE SUCH AS NATIONALLY-

AND INDUSTRY- RECOGNIZED STANDARDS AND THE RULES, REGULATIONS,

AND LAWS OF LOCAL, STATE, AND FEDERAL AUTHORITIES HAVING

JURISDICTION.

b. DRAFT, PROJECT-SPECIFIC HEALTH AND SAFETY PLAN, INCLUDING

IDENTIFICATION AND CREDENTIALS OF THE COMPANY'S SAFETY

PROFESSIONAL(S) AND PROJECT SAFETY OFFICER ASSIGNED TO THIS PROJECT.

1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF

ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINT (LBP) SUBJECT

TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED.

LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE

REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY

INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR

FIELD VERIFYING ALL MATERIAL LOCATIONS AND REMOVAL QUANTITIES, AND

EXISTING SITE CONDITIONS. NO CONTRACT MODIFICATIONS WILL BE

CONSIDERED FOR UNEXPECTED SITE CONDITIONS OR ABATEMENT

QUANTITIES. BY BIDDING THE PROJECT, THE ABATEMENT CONTRACTOR

ACKNOWLEDGES AND ACCEPTS ALL RISKS ASSOCIATED WITH SITE CONDITIONS

AND CONCEALED ACMS.

2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO RENOVATION OF THE

PROJECT AREAS. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH

APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED

ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE

ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT

IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK AND

CONTACT THE PROJECT MANAGER AND VPIH.

3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL,

STATE, AND LOCAL REGULATIONS; PROJECT SPECIFICATIONS, THE APPROVED

WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS

OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL

WORK SHALL BE CRAFTSMAN-LIKE AND SUBJECT TO INSPECTION BY THE OWNER,

THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.

4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO

ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS,

RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH

AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND

VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL

BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO

ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING

THE LIMITS OF DEMOLITION AND ABATEMENT WITH THE GENERAL

CONTRACTOR.

5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF

NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE

INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE

PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS

WORK.

HAZARDOUS MATERIALS - ASBESTOS REMOVAL:

1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE

ASBESTOS & LEAD PAINT SAMPLING REPORT BY CASTLE HILL ASSOCIATES,

REVISED JULY 26, 2024, FOR MORE INFORMATION ABOUT ACMS IDENTIFIED IN

THE PROJECT AREA.

2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN WALLS AND

CHASES AND ABOVE RIGID CEILINGS. COORDINATE ACCESS WITH DEMOLITION

DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY

DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS

PRESENT.

3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES

(NPE) WHERE APPLICABLE AND PERFORM REMOVAL IN ACCORDANCE WITH

APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 13-13, GLOVEBAG ASBESTOS

ABATEMENT; SEC 02 82 11, TRADITIONAL ASBESTOS ABATEMENT; SEC 02 82

13-19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT; 02 82 13-31

ASBESTOS TRANSITE AND CLASS II ABATEMENT. FINALIZE LIMITS OF

REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), (PDF),

PERSONAL DECONTAMINATION FACILITIES AND WASTE DECONTAMINATION

FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING

REQUIREMENTS.

4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR

ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER

THAN -0.02" WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO

MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE

NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL CONTRACTOR,

OWNER'S REPRESENTATIVE , AND VPIH, IF NEEDED.

5. TSI ABATEMENT FROM SECTIONS OF PIPE AND FITTINGS TO BE DEMOLISHED MAY

BE PERFORMED USING WRAP AND CUT METHODS IF APPROVED BY THE GENERAL

CONTACTOR. COORDINATE WITH MECHANICAL DEMOLITION DRAWINGS AND

THE MECHANICAL CONTRACTOR.

6. ALL WASTE LOADOUT SHALL OCCUR AFTER HOURS. COORDINATE LOADOUT

ROUTES AND TIMES WITH THE GENERAL CONTRACTOR, OWNER'S

REPRESENTATIVE, AND VPIH.

1. ASBESTOS: THE ASBESTOS CONTAINING MATERIALS THAT WILL BE IMPACTED BY

THE PLANNED RENOVATIONS MUST BE REMOVED AND DISPOSED BY A KENTUCKY

LICENSED ASBESTOS CONTRACTOR. MATERIALS THAT WILL NOT BE DISTURBED

CAN REMAIN IN-PLACE INDEFINITELY UNTIL REMOVAL IS REQUIRED PRIOR TO

DEMOLITION OR RENOVATIONS.

2. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL

CONTRACTOR, OFFICER, CONTRACTING OWNER OR OWNER'S REPRESENTATIVE,

AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH

PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME

AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS

SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY

OPERATIONS.

1. LEAD-BASED PAINT: THE IDENTIFIED LEAD PAINTED COMPONENTS CAN REMAIN

IN-PLACE INDEFINITELY AND DO NOT REQUIRE ABATEMENT IF THEY REMAIN

IN-PLACE. IF THE COMPONENTS ARE TO BE REMOVED, DISTURBED, OR REPAINTED

DURING THE RENOVATIONS, THEN PERSONAL AIR MONITORING FOR THE

WORKERS MUST BE CONDUCTED TO COMPLY WITH OSHA REQUIREMENTS FOR

LEAD EXPOSURE IN CONSTRUCTION TO ESTABLISH A NEGATIVE EXPOSURE

ASSESSMENT. ALL PAINT CHIP DEBRIS AND DUST MUST BE COLLECTED THEN

DISPOSED OF IN ACCORDANCE WITH KENTUCKY AND RCRA DISPOSAL STANDARDS.

2. LEAD-BASED PAINT (LBP) ARE PAINTS THAT CONTAIN LEAD ≥ 0.5 PERCENT BY

WEIGHT. PAINT CONTAINING LEAD (PCL) IS PAINT WITH A DETECTABLE LEVEL OF

LEAD. LBP AND PCL ARE KNOWN TO EXIST ON MATERIALS, COMPONENTS,

AND SURFACES THAT MAY BE DISTURBED, PENETRATED, REFINISHED, OR

DEMOLISHED. PERFORM DEMOLITION OF MATERIALS AND COMPONENTS

WITH LBP AND/OR PCL IN ACCORDANCE WITH APPLICABLE REGULATIONS AND

THE APPROVED WORK PLAN.

3. FLAKING AND PEELING LBP AND/OR PCL ON SURFACES TO REMAIN SHALL BE

REMOVED AND STABILIZED USING METHODS IN ACCORDANCE WITH SECTION 02

83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.

4. REFER TO THE ASBESTOS & LEAD PAINT SAMPLING REPORT BY CASTLE HILL

ASSOCIATES, REVISED JULY 26, 2024, FOR INFORMATION CONCERNING THE

PRESENCE OF LBP AND PCL IN THE PROJECT AREAS.

1. THE ASBESTOS CONTAINING MATERIAL SAMPLED AS CAMP NELSON NATIONAL

CEMETERY IS CATEGORY I NON-FRIABLE ACM THAT WILL BE OR HAS BEEN

SUBJECTED TO SANDING, GRINDING, CUTTING, OR ABRADING

Bid Set DateDateDate

JANUARY 7, 2026

HISTORIC BRICK STABLE BUILDING

HISTORIC MAINTENANCE GARAGE

1. WALL PARTITION CALLOUTS 10/22/26

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text

CONSULTANTS

File details come from the government source that posted it. Updated .